Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

Granted Bath and North East Somerset 25/03757/EFUL Full Application with an EIA attached

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts

As published by the council, reference 25/03757/EFUL

Application record

Reference
25/03757/EFUL
Type
Full Application with an EIA attached
Status
Pending Decision
Decision
Granted As published: Delegate to PERMIT
Received
26 Sep 2025
Validated
8 Oct 2025
Decided
16 Apr 2026
Ward
Bathwick
Decision by
Planning Committee

Site history

Applications at this address on the Bath and North East Somerset register

This site has had 16 applications since 2024: 11 approved, 0 refused.

  • 26/03634/COND Awaiting decision

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 10 (Landscape Design Proposals (Bespoke Trigger)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Submitted 21 Sep 2026 Conditions
  • 26/03293/COND Awaiting decision

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 16 (Landscape and Ecological Management Plan (Pre-occupation)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Submitted 28 Aug 2026 Conditions
  • 26/03128/D6A Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of planning obligations in Schedule 3, Section 2, Clause 1.3 (Targeted Recruitment and Training) of the Section 106 agreement attached to Planning Permission reference 25/03757/EFUL.

    Decided 1 Oct 2026 Conditions
  • 26/02917/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 6 (Ecological Construction Environmental Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Decided 19 Aug 2026 Conditions
  • 26/02914/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 7 (Construction Environmental Management Plan (Environmental Protection) (Pre-commencement)) and 8 (Construction Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Decided 21 Aug 2026 Conditions
  • 26/02891/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 9 (Travel Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 8 Sep 2026 Conditions
  • 26/02892/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 3 (Arboricultural Method Statement and Tree Protection Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 17 Aug 2026 Conditions
  • 26/02889/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 4 (Archaeology - Controlled Excavation) and 19 (Archaeology - Post Excavation and Publication) of 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 11 Aug 2026 Conditions
  • 26/02888/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 2 (Biodiversity Gain Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 19 Aug 2026 Conditions
  • 26/02890/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 5 (Detailed Drainage Design) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 12 Aug 2026 Conditions

Timeline

Dates from the published record

  1. 26 Sep 2025

    Received by Bath and North East Somerset

  2. 8 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Apr 2026

    Decision issued: Delegate to PERMIT

  4. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

10 later applications on the register refer to this one:

  • 26/03634/COND Awaiting decision

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 10 (Landscape Design Proposals (Bespoke Trigger)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Submitted 21 Sep 2026 Conditions
  • 26/03293/COND Awaiting decision

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 16 (Landscape and Ecological Management Plan (Pre-occupation)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Submitted 28 Aug 2026 Conditions
  • 26/03128/D6A Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of planning obligations in Schedule 3, Section 2, Clause 1.3 (Targeted Recruitment and Training) of the Section 106 agreement attached to Planning Permission reference 25/03757/EFUL.

    Decided 1 Oct 2026 Conditions
  • 26/02917/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 6 (Ecological Construction Environmental Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Decided 19 Aug 2026 Conditions
  • 26/02914/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 7 (Construction Environmental Management Plan (Environmental Protection) (Pre-commencement)) and 8 (Construction Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Decided 21 Aug 2026 Conditions
  • 26/02891/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 9 (Travel Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 8 Sep 2026 Conditions
  • 26/02892/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 3 (Arboricultural Method Statement and Tree Protection Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 17 Aug 2026 Conditions
  • 26/02889/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 4 (Archaeology - Controlled Excavation) and 19 (Archaeology - Post Excavation and Publication) of 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 11 Aug 2026 Conditions
  • 26/02888/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of conditions 2 (Biodiversity Gain Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 19 Aug 2026 Conditions
  • 26/02890/COND Granted

    Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    Discharge of condition 5 (Detailed Drainage Design) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Decided 12 Aug 2026 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bath and North East Somerset granted permission on 16 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02917/COND Submitted 4 Aug 2026 50 yards away

    Discharge of condition 6 (Ecological Construction Environmental Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Granted Conditions
  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02914/COND Submitted 4 Aug 2026 50 yards away

    Discharge of conditions 7 (Construction Environmental Management Plan (Environmental Protection) (Pre-commencement)) and 8 (Construction Management Plan (Pre-commencement)) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts).

    Granted Conditions
  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02891/COND Submitted 3 Aug 2026 50 yards away

    Discharge of condition 9 (Travel Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Granted Conditions
  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02892/COND Submitted 3 Aug 2026 50 yards away

    Discharge of condition 3 (Arboricultural Method Statement and Tree Protection Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Granted Conditions Trees
  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02889/COND Submitted 3 Aug 2026 50 yards away

    Discharge of conditions 4 (Archaeology - Controlled Excavation) and 19 (Archaeology - Post Excavation and Publication) of 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Granted Conditions
  • Eastern Sports Field, Sports Training Village, University Of Bath Campus, Claverton Down, Bath, Bath And North East Somerset,

    26/02888/COND Submitted 3 Aug 2026 50 yards away

    Discharge of conditions 2 (Biodiversity Gain Plan) of application 25/03757/EFUL (Full planning application for the delivery of student accommodation with associated vehicular, pedestrian and cycle access, internal highways, car parking (including reconfiguration of an existing parking area), cycle parking, green and blue infrastructure (including drainage features and soft landscape planting), hard landscaping, boundary treatment, new and replacement external lighting, ancillary infrastructure (including storage, substations, pumping stations, photovoltaic panels, and internal and external plant), ground remodelling, and two padel courts)

    Granted Conditions

In Bath and North East Somerset

  • 26/02627/FUL Granted

    40 Bathwick Hill, Bathwick, Bath, Bath And North East Somerset, BA2 6LD

    Change of use from two dwellings (40 Bathwick Hill and The Wing, 40 Bathwick Hill) to a single dwelling.

    Received 10 Jul, published by the council 31 Jul 2026 Full applications
  • 26/03127/FUL Granted

    Croquet Lawns, Bath Recreation Ground, Pulteney Mews, Bathwick, Bath, Bath And North East Somerset,

    Installation of Water Storage Tank and gated fencing as screen

    Received 18 Aug, published by the council 2 Sep 2026 Full applications
  • 26/02134/FUL Granted

    Rosebank , Common Lane, Compton Dando, Bristol, Bath And North East Somerset, BS39 4JU

    Erection of a two storey side extension, following the removal and demolition of the existing conservatory, and the erection of a single storey rear extension.

    Received 3 Jun, published by the council 21 Jul 2026 Full applications
  • 26/02736/FUL Granted

    Thornton House , Bristol Road, Farrington Gurney, Bristol, Bath And North East Somerset, BS39 6TQ

    Erection of Single storey rear extension with balcony and single storey side extension with dormers to form 3 bay garage with bedroom above. Replace existing front boundary wall with new 1.8m high wall and new gates to existing in/out access points

    Received 21 Jul, published by the council 31 Jul 2026 Full applications
  • 25/03989/FUL Granted

    Greenwoods , 50 Cleveland Walk, Bathwick, Bath, Bath And North East Somerset, BA2 6JT

    Removal of hipped roof and construction of parapet roof. Alterations to fenestrations including enlargement of windows and installation of bifold doors and replacement of softwood windows with composite windows. New access bridge to rear.

    Received 14 Oct, published by the council 21 Jul 2026 Full applications