Planning application
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Works: Trees
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Removal of Hedgerow to Facilitate Rewiring of Overhead Route
As published by the council, reference 26/00631/HDG
Application record
- Reference
- 26/00631/HDG
- Type
- Hedgerow Removal Notice
- Status
- Decided
- Decision
- Not to serve a Hedgerow Retention Notice
- Received
- 26 May 2026
- Validated
- 26 May 2026
- Decided
- 3 Jul 2026
- Ward
- Sturton
- Parish
- West Burton
- Decision by
- Delegated Decision
Site history
Applications at this address on the Bassetlaw register
This site has had 6 applications since 2022.
-
26/01002/COND Awaiting decision
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Discharge of Condition 9 (Construction Environmental Management Plan) of P.A. 22/01713/FUL - Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
-
26/00977/COND Awaiting decision
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Dicharge of Conditions 6 (Elevations) and 7 (External Details) of P.A. 22/01713/FUL Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
-
26/00489/COND Decided
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Discharge Condition 19 (Travel Plan Coordinator) 23 (Sustainable Transport Statement) on P.A 22/01713/FUL Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
-
26/00438/COND Decided
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Discharge of Condition 29 (Operational Noise Assessment) on P.A 22/01713/FUL (Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping)
-
22/01095/SCO Decided
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Scoping Opinion - West Burton C Battery Energy Storage System (BESS) with an Electrical Generating Capacity up to 500 Megawatts (MW) and Associated Development Including Connections, Access, and Planting
Timeline
Dates from the published record
-
26 May 2026
Received by Bassetlaw
-
3 Jul 2026
Decision issued: Not to serve a Hedgerow Retention Notice
-
22 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Bassetlaw has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About tree works applications
Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.
Other tree works applications
In Bassetlaw
-
26/01273/CAT Awaiting decision
Wellbank Stone Lane North Wheatley Nottinghamshire DN22 9DF
Works to Trees in a Conservation Area T1 (Silver Birch) Remove
-
26/01269/CAT Awaiting decision
Byways Wigthorpe Lane Carlton In Lindrick Nottinghamshire S81 8BT
Works to Trees within a Conservation Area Consisting of Cherry Tree Remove Main Limb and Secondary Limb Reduce Tree Back to Previously Approved Cuts to Prune and Shape Removes 2-2.5 m All Round. Remove Dead, Damaged Limbs. Walnut Tree Crown Lift Lower Limbs up to 3m From Ground Level. Prune Main Limbs, Secondary Limbs, Prune Distal Ends by up to 1m Max.
-
26/01011/CAT Decided
Westgate Lodge Low Street North Wheatley Nottinghamshire DN22 9DS
Works to Trees within a Conservation Area Consisting of T1 Willow approx 15m tall Lateral Spread of approx 20m High Pollard the Tree
-
26/01266/TPO Awaiting decision
Retford Education Centre Old Hall Drive Retford Nottinghamshire DN22 7EA
Works to Tree Covered by a Tree Protection Order G47 (3 Oak Trees) Immediate Group of 3 at Edge of Wooded Area Northern Most Tree Displays Evidence of Recent, Significant Branch Failure. Reduce Length of Branches in Upper Crowns Extending East Over Main Access Drive by approx. 4-5m.
-
26/01248/CAT Awaiting decision
2 High Road Carlton In Lindrick Nottinghamshire S81 9EB
Works to Trees within a Conservation Area Consisting of G1 Fell Smaller Self Set Ash Leaving Larger Ash G2 - Row of Conifers Fell