Proposal
Discharge of Condition 29 (Operational Noise Assessment) on P.A 22/01713/FUL (Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping)
As published by the council, reference 26/00438/COND
Application record
- Reference
- 26/00438/COND
- Type
- Request for Condition Discharge
- Status
- Decided
- Decision
- Determined
- Received
- 16 Apr 2026
- Validated
- 17 Apr 2026
- Decided
- 14 Jul 2026
- Ward
- Sturton
- Parish
- West Burton
- Decision by
- Delegated Decision
Site history
Applications at this address on the Bassetlaw register
This site has had 5 applications since 2026.
-
26/01002/COND Awaiting decision
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Discharge of Condition 9 (Construction Environmental Management Plan) of P.A. 22/01713/FUL - Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
-
26/00977/COND Awaiting decision
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Dicharge of Conditions 6 (Elevations) and 7 (External Details) of P.A. 22/01713/FUL Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
-
26/00631/HDG Decided
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Removal of Hedgerow to Facilitate Rewiring of Overhead Route
-
26/00489/COND Decided
Land And Buildings At West Burton Power Station North Road West Burton Nottinghamshire
Discharge Condition 19 (Travel Plan Coordinator) 23 (Sustainable Transport Statement) on P.A 22/01713/FUL Construction and Operation of a Battery Energy Storage System with an Electrical Output Capacity of up to 500MW and Associated Development Including Power Inverter Systems, Electrical Banking Station, Electrical Cabling including Below Ground Cabling to 400KV Switchyard, Welfare Facilities, Internal Access Roads, Site Security Infrastructure, Lighting, Boundary Treatments, and Landscaping.
Timeline
Dates from the published record
-
16 Apr 2026
Received by Bassetlaw
-
17 Apr 2026
Validated
Checked as complete and ready for consideration.
-
14 Jul 2026
Decision issued: Determined
-
22 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cardiff
206 applications on PlanIndex · across 65 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Bassetlaw has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Bassetlaw
-
26/00872/COND Decided
Old Manor House Church Street South Leverton Nottinghamshire DN22 0BX
Discharge of Condition 4 (Specification of Materials)on P/A 25/00811/HSE - Removal of Existing Car Port. Convert Barn to Boot / Utility Room and Home Office. Erect Single Storey Rear Extension with Glazed Link to the Converted Barn
-
26/00940/COND Decided
Manor Farm Piper Lane Carburton Nottinghamshire S80 3BU
Discharge of Condition 3 (Stopping Up Order Piper Lane) of P.A. 22/01412/FUL - Conversion of Existing Farm Buildings, Manor House and Semi-Detached Dwellings to Hotel with Construction of New Build Barn, Pods, Kitchen and Wadobi
-
26/01017/COND Awaiting decision
Manor Farm Twyford Lane Elkesley Nottinghamshire DN22 8AS
Discharge Condition 11 ( Ecological Mitigation and Enhancement ) on P.A 22/01659/FUL Conversion of Existing Barns to Provide Three New Dwellings and the Erection of New Single Dwelling with Garages
-
26/01019/COND Awaiting decision
Manor Farm Twyford Lane Elkesley Nottinghamshire DN22 8AS
Discharge Conditions 11 ( Ecological Mitigation and Enhancement ) on P.A 22/01658/FUL - Conversion of a Single Storey Barn to Provide a New Dwelling and Construction of Four New Dwellings
-
26/00648/COND Decided
Pilgrim Fathers Caravan Site Saracens Lane Scrooby South Yorkshire DN10 6AS
Discharge of Condition 7 (Hard and Soft Landscape Works) and Note 3 (BNG) on P/A 25/01434/FUL - Siting of 6 Static Caravans for Holiday use 12 Months of the Year with Associated Infrastructure