Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The South Of Wash Road Wash Road Laindon Essex

Awaiting decision Basildon 26/00485/VAR Amendments

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of conditions 5 (Plan Numbers and documents) , 6 (Phasing Plan), 7 (Compliance with approved design code and design and access statement), and 27 (external materials) of approved outline planning permission 23/01551/OUT.

As published by the council, reference 26/00485/VAR

Application record

Reference
26/00485/VAR
Category
Amendments
Status
Awaiting decision
Received
17 Apr 2026
Validated
28 Apr 2026
Ward
Castledon And Crouch
Parish
Noak Bridge Parish Council

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Basildon

  2. 28 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Basildon took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

96 documents on file for this application

  • BIODIVERSITY GAIN PLAN BackGround Papers - Redacted · 08 Jun 2026
  • BNG METRIC - HYBRID BackGround Papers - Redacted · 08 Jun 2026
  • BNG METRIC - OUTLINE BackGround Papers - Redacted · 08 Jun 2026
  • BNG METRIC - PHASE 1 DETAILED BackGround Papers - Redacted · 08 Jun 2026
  • GROUND INVESTIGATION ADDENDUM BackGround Papers - Redacted · 11 May 2026
  • LVIA ADDENDUM BackGround Papers - Redacted · 11 May 2026
  • APPENDIX F - UKPN ASSET RECORDS BackGround Papers - Redacted · 11 May 2026
  • ENERGY STATEMENT BackGround Papers - Redacted · 11 May 2026
  • DESIGN & ACCESS STATEMENT PART 1 BackGround Papers - Redacted · 05 May 2026
  • DESIGN & ACCESS STATEMENT PART 2 BackGround Papers - Redacted · 05 May 2026
  • DESIGN & ACCESS STATEMENT PART 3 BackGround Papers - Redacted · 05 May 2026
  • DESIGN & ACCESS STATEMENT PART 4 BackGround Papers - Redacted · 05 May 2026
  • SUDS REPORT REVISION C BackGround Papers - Redacted · 05 May 2026
  • ARBORICULTURAL IMPACT ASSESSMENT BackGround Papers - Redacted · 05 May 2026
  • BIODIVERISTY NET GAIN PLAN BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART A BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 1 CONTEXT 1 BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 2 MOVEMENT 1 BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 3 NATURE BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 4 BUILT FORM 1 BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 5 IDENTITY 1 BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 6 PUBLIC SPACES BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART B 7 - 10 BackGround Papers - Redacted · 05 May 2026
  • DESIGN CODE PART C BackGround Papers - Redacted · 05 May 2026
  • UPDATED ECOLOGICAL IMPACT ASSESSMENT BackGround Papers - Redacted · 05 May 2026
  • IILLUSTRATIVE LANDSCAPE MASTERPLAN Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 2 OF 2 Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 1 OF 5 Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 2 OF 5 Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 3 OF 5 Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 4 OF 5 Drawing · 05 May 2026
  • PHASE 1 GENERAL ARRANGEMENT SHEET 5 OF 5 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 1 OF 6 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 2 OF 6 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 3 OF 6 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 4 OF 6 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 5 OF 6 Drawing · 05 May 2026
  • PHASE 1 DETAILED PLANTING SHEET 6 OF 6 Drawing · 05 May 2026
  • UPDATE SHADOW HABITATS REGULATIONS ASSESSMENT BackGround Papers - Redacted · 05 May 2026
  • APPLICATION FORM WITHOUT PERSONAL DATA Application Form · 28 Apr 2026
  • PLANNING STATEMENT BackGround Papers - Redacted · 28 Apr 2026
  • COVERING LETTER BackGround Papers - Redacted · 28 Apr 2026
  • NOISE IMPACT ASSESSMENT BackGround Papers - Redacted · 28 Apr 2026
  • TRANSPORT TECHNICAL NOTE BackGround Papers - Redacted · 28 Apr 2026
  • HEALTH IMPACT ASSESSMENT BackGround Papers - Redacted · 28 Apr 2026
  • BEECH GROUND AND FIRST FLOOR PLANS Drawing · 28 Apr 2026
  • MERLIN GROUND AND FIRST FLOOR PLANS Drawing · 28 Apr 2026
  • MERLIN GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • MERLIN GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • MERLIN GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • JAY GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • JAY GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • ROBIN AND JAY GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • ROBIN AND JAY GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • HAZEL GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • HAZEL GROUND AND FIRST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • ASPEN FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • BILBERRY FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • GOLDCREST FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • TAWNY FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • CHERRY FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • CHERRY FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • BEECH ELEVATIONS Drawing · 28 Apr 2026
  • BIRCH FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • ROBIN FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • SISKIN GROUND AND FIRST FLOOR PLAN Drawing · 28 Apr 2026
  • SISKIN ELEVATIONS Drawing · 28 Apr 2026
  • SISKIN GROUND AND FIRST FLOOR PLAN Drawing · 28 Apr 2026
  • SISKIN ELEVATIONS Drawing · 28 Apr 2026
  • WAGTAIL FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • SYCAMORE FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • HAWTHORN FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • PHASE 1 ACCOMMODATION SCHEDULE BackGround Papers - Redacted · 28 Apr 2026
  • MOVEMENT AND ACCESS PARAMETERS PLAN Drawing · 28 Apr 2026
  • APPENDIX B ESSEX AND SUFFOLK WATER ASSET RECORDS BackGround Papers - Redacted · 28 Apr 2026
  • AFFORDABLE PRIVATE RENT BRIEFING NOTE BackGround Papers - Redacted · 28 Apr 2026
  • JAY FLOOR PLANS AND ELEVATIONS Drawing · 28 Apr 2026
  • PRELIMINARY UTILITIES APPRAISAL REPORT BackGround Papers - Redacted · 28 Apr 2026
  • FACADE MATERIALS PLAN Drawing · 28 Apr 2026
  • APPENDIX J NOT AFFECTED RESPONSES AND LINESEARCH ENQUIRY BackGround Papers - Redacted · 28 Apr 2026
  • APPENDIX I TELECOMMUNICATIONS ASSET RECORDS BackGround Papers - Redacted · 28 Apr 2026
  • HERITAGE ASSESSMENT TECHNICAL NOTE BackGround Papers - Redacted · 28 Apr 2026
  • AFFORDABLE HOUSING STATEMENT BackGround Papers - Redacted · 28 Apr 2026
  • AIR QUALITY TECHNICAL NOTE BackGround Papers - Redacted · 28 Apr 2026
  • TENURE PLAN Drawing · 28 Apr 2026
  • PHASE 1 SITE LAYOUT Drawing · 28 Apr 2026
  • HOUSING TYPOLOGY PLAN Drawing · 28 Apr 2026
  • STOREY HEIGHTS PLAN Drawing · 28 Apr 2026
  • APPENDIX A MASTER PLAN BackGround Papers - Redacted · 28 Apr 2026
  • LOCATION PLAN Drawing · 28 Apr 2026
  • APPENDIX D FLOOD MAP Drawing · 28 Apr 2026
  • APPENDIX E CADENT GAS ASSET RECORDS Drawing · 28 Apr 2026
  • APPENDIX G ASSET RECORDS Drawing · 28 Apr 2026
  • APPENDIX H MULTI UTILITY QUOTATIONS Drawing · 28 Apr 2026
  • APPENDIX C ANGLIAN WATER ASSET RECORDS Drawing · 28 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Basildon for determination, against a statutory target of eight weeks. Over the last year Basildon decided amendment applications in a median of 58 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Basildon

  • 26/00882/VAR Granted

    71 Kathleen Ferrier Crescent Laindon Essex SS15 5QX

    Variation of condition 5 (age range of residents) of planning permission reference 25/00139/FULL to lower the minimum age of the children from 13 years old to 9 years old, while maintaining the maximum age at 17 years old.

    10 Aug 2026 Amendments
  • 26/00276/VAR Awaiting decision

    TEXACO 327 Whitmore Way Basildon Essex SS14 2NL

    Variation of planning condition 7 (Opening hours) of planning application 96/00796/BAS to allow for the filling station to operate 24 hours

    12 Mar 2026 Amendments
  • 26/00769/VAR Granted

    8 Hunts Mead Billericay Essex CM12 9JA

    Variation of condition 2 (Approved plans), and condition 3 (Existing surfaces) of planning reference 26/00211/FULL, to render the new extension to match the existing rendered panel to the front (plan 26-001-PP-02).

    7 Jul 2026 Amendments
  • 26/00813/VAR Granted

    86 Gaynesford Lee Chapel South Basildon Essex SS16 5SG

    Variation of condition 2 (approved plans) of planning reference 25/01604/FULL, to partially increase the depth of the first-floor rear extension by 400mm to accommodate space for a bath.

    18 Jul 2026 Amendments
  • 26/00936/VAR Awaiting decision

    Pylon Nursery Gardiners Lane North Billericay Essex CM11 2XE

    Variation of Condition 2 (To alter the two bungalows into two x four-bedroom units) of planning reference 25/00905/FULL.

    25 Aug 2026 Amendments