Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North And South Of Dunton Road Laindon Essex

Awaiting decision Basildon 26/00296/OUT Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning application for: up to 1,100 residential dwellings (Class C2 and C3), business, retail, leisure and sports uses (Class E); primary school (Class F1); community uses (Class F2); hot food takeaway (Sui Generis), open space; vehicular accesses; associated infrastructure, groundworks and engineering operations; with all matters reserved except for access to the site.

As published by the council, reference 26/00296/OUT

Application record

Reference
26/00296/OUT
Category
Outline
Status
Awaiting decision
Received
17 Mar 2026
Validated
26 Mar 2026
Ward
Burstead

Timeline

Dates from the published record

  1. 17 Mar 2026

    Received by Basildon

  2. 26 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Basildon took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

David Lock Associates Ltd Agent, registered in Milton Keynes

Active · incorporated 1989 · Milton Keynes

353 applications on PlanIndex · across 34 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Bloor Homes Ltd Applicant, a developer registered in Swadlincote

Active · incorporated 1987 · Swadlincote

69 applications on PlanIndex · across 22 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

128 documents on file for this application

  • BNG METRIC Drawing · 21 Aug 2026
  • ADDITIONAL VIEWS Drawing · 21 Aug 2026
  • RESPONSE FROM SES TO ECOLOGY COMMENTS BackGround Papers - Redacted · 21 Aug 2026
  • RIVER CONDITION PRO MAP BackGround Papers - Redacted · 21 Aug 2026
  • AIR QUALITY TECHNICAL NOTE BackGround Papers - Redacted · 24 Jul 2026
  • NOISE TECHNICAL NOTE BackGround Papers - Redacted · 24 Jul 2026
  • UPDATED BNG METRIC BackGround Papers - Redacted · 24 Jul 2026
  • ADDITIONAL VIEWS BackGround Papers - Redacted · 24 Jul 2026
  • UPDATED ECOLOGY DETAILS BackGround Papers - Redacted · 24 Jul 2026
  • RIVER CONDITION PRO MAP DATA BackGround Papers - Redacted · 24 Jul 2026
  • LAND COMPLIANCE STUDY BackGround Papers - Redacted · 29 May 2026
  • 6.9 AVR VIEWS AND METHODOLOGY BackGround Papers - Redacted · 15 May 2026
  • 6.2 FIG 6.6. NIGHT LIGHT SOURCES PLAN Drawing · 07 May 2026
  • 6.4 SITE APPRAISAL PHOTOGRAPAHS BackGround Papers - Redacted · 30 Mar 2026
  • 6.2 FIGURE 6.4 SITE APPRAISAL PLAN Drawing · 30 Mar 2026
  • 6.3 LVIA METHODOLOGY BackGround Papers - Redacted · 29 Mar 2026
  • 6.4 BASELINE CONDITIONS BackGround Papers - Redacted · 29 Mar 2026
  • ENVIRONMENTAL STATEMENT 15 (CONCLUSIONS) BackGround Papers - Redacted · 25 Mar 2026
  • ENVIRONMENTAL STATEMENT 13 (HYDROLOGY, FLOOD RISK AND DRAINAGE)) BackGround Papers - Redacted · 25 Mar 2026
  • COVERING LETTER BackGround Papers - Redacted · 25 Mar 2026
  • ENVIRONMENTAL STATEMENT 1 (INTRODUCTION) BackGround Papers - Redacted · 25 Mar 2026
  • ENVIRONMENTAL STATEMENT (NON-TECHNICAL SUMMARY) BackGround Papers - Redacted · 25 Mar 2026
  • 13.2 HYDRAULIC MODELLING REPORT BackGround Papers - Redacted · 25 Mar 2026
  • 13.1 FLOOD RISK ASSESSMENT (FRA) BackGround Papers - Redacted · 25 Mar 2026
  • 13.1 FRA OUTLINE DRAINAGE STRATEGY BackGround Papers - Redacted · 25 Mar 2026
  • EXISTING COMBINED SERVICES PLAN Drawing · 19 Mar 2026
  • GROUNDWISE UTILITY REPORT BASILDON BackGround Papers - Redacted · 19 Mar 2026
  • 11.1 PHASE 1 DESK STUDY BackGround Papers - Redacted · 19 Mar 2026
  • 11.2 UXO DESK STUDY & RISK ASSESSMENT BackGround Papers - Redacted · 19 Mar 2026
  • 8.1 TRANSPORT ASSESSMENT BackGround Papers - Redacted · 19 Mar 2026
  • 6.2 FIGURE 6.2 TOPOGRAPHY PLAN Drawing · 19 Mar 2026
  • 6.2 FIGURE 6.3 LANDSCAPE CHARACTER PLAN Drawing · 19 Mar 2026
  • 6.2 FIGURE 6.1 SITE CONTEXT PLAN Drawing · 19 Mar 2026
  • 6.2 FIGURE 6.5 VISUAL APPRAISAL PLAN Drawing · 19 Mar 2026
  • 6.1 PLANNING POLICY AND EVIDENCE BASE BackGround Papers - Redacted · 19 Mar 2026
  • 6.1 PLANNING POLICY AND EVIDENCE BASE Drawing · 19 Mar 2026
  • 6.5 SITE CONTEXT PHOTOGRAPHS WINTER BackGround Papers - Redacted · 19 Mar 2026
  • 6.6 NIGHT-TIME PHOTOGRAPH BackGround Papers - Redacted · 19 Mar 2026
  • 6.8 EFFECTS TABLES BackGround Papers - Redacted · 19 Mar 2026
  • 6.8 EFFECTS TABLES - NIGHT-TIME BackGround Papers - Redacted · 19 Mar 2026
  • 6.8 EFFECTS TABLES - LANDSCAPE BackGround Papers - Redacted · 19 Mar 2026
  • 6.8 EFFECTS TABLES - LANDSCAPE BackGround Papers - Redacted · 19 Mar 2026
  • 6.10 REFERENCES BackGround Papers - Redacted · 19 Mar 2026
  • 7.3 BIODIVERSITY GAIN PLAN AND STATUTORY BNG METRIC BNG · 19 Mar 2026
  • 1.2 EIA SCOPING REPORT FINAL 11.4.25 BackGround Papers - Redacted · 19 Mar 2026
  • EIA SCOPING - LVIA METHODOLOGY BackGround Papers - Redacted · 19 Mar 2026
  • 6.2 FIGURE 6.1 SITE CONTEXT AND FIGURE 6.2 VISUAL APPRAISAL PLANS BackGround Papers - Redacted · 19 Mar 2026
  • PHASE 1 DESK STUDY (1923751-R01 (01)) BackGround Papers - Redacted · 19 Mar 2026
  • EIA SCOPING - CUMULATIVE SCHEMES BackGround Papers - Redacted · 19 Mar 2026
  • 4.1 - DRAFT PARAMETER PLAN (BLH002-020 REVISION A) BackGround Papers - Redacted · 19 Mar 2026
  • 1.1 - SITE LOCATION PLAN (BLH002-022) BackGround Papers - Redacted · 19 Mar 2026
  • 1.4 SCOPING ADDENDA REPORT - EIA SCOPING ADDENDA REPORT FINAL 6.11.25 BackGround Papers - Redacted · 19 Mar 2026
  • 1.4 SCOPING ADDENDA REPORT - EIA SCOPING - CUMULATIVE SCHEMES BC 17.9.25 BackGround Papers - Redacted · 19 Mar 2026
  • 1.4 SCOPING ADDENDA REPORT - BLH002_020_E_DEVELOPMENT FRAMEWORK PLAN BackGround Papers - Redacted · 19 Mar 2026
  • 1.3 EIA SCOPING OPINION BackGround Papers - Redacted · 19 Mar 2026
  • 1.4 SCOPING ADDENDA REPORT - BHL002_022_B_LOCATION PLAN BackGround Papers - Redacted · 19 Mar 2026
  • 6.5 SITE CONTEXT PHOTOGRAPHS - SUMMER BackGround Papers - Redacted · 19 Mar 2026
  • 7.1 ECOLOGICAL BASELINE REPORT BackGround Papers - Redacted · 18 Mar 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 17 Mar 2026
  • DEVELOPMENT PARAMETERS PLAN Drawing · 17 Mar 2026
  • BUILDING HEIGHT PARAMATERS PLAN Drawing · 17 Mar 2026
  • LOCATION PLAN Drawing · 17 Mar 2026
  • PROPOSED 3 ARM ROUNDABOUT ON NOAK HILL ROAD PLAN Drawing · 17 Mar 2026
  • 2.2 PROPOSED DUNTON ROAD ACCESS POINTS (WEST) Drawing · 17 Mar 2026
  • PROPOSED OVERVIEW OF HIGHWAY WORKS PLAN Drawing · 17 Mar 2026
  • PROPOSED DUNTON ROAD/BRENTWOOD ROAD REALIGNMENT PLAN Drawing · 17 Mar 2026
  • NOTIFICATION ON LAND OWNER BackGround Papers - Redacted · 17 Mar 2026
  • DESIGN AND ACCESS STATEMENT SECTION 9. BackGround Papers - Redacted · 17 Mar 2026
  • DESIGN AND ACCESS STATEMENT SECTIONS 10 AND 11 BackGround Papers - Redacted · 17 Mar 2026
  • DESIGN AND ACCESS STATEMENT SECTIONS 1. TO 5. BackGround Papers - Redacted · 17 Mar 2026
  • DESIGN AND ACCESS STATEMENT SECTIONS 6 TO 8 BackGround Papers - Redacted · 17 Mar 2026
  • ILLUSTRATIVE MASTER PLAN BLH002/015D Drawing · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 4 (PLANNING POLICY CONTEXT) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 5 (SOCIO-ECONOMIC EFFECTS) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 6 (LANDSCAPE AND VISUAL EFFECTS) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 7 (ECOLOGY) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 8 (TRANSPORT) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 9 (NOISE AND VIBRATION) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 10 (AIR QUALITY) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 11 (GROUND CONDITIONS) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 12 (ARCHAEOLOGY AND CULTURAL HERITAGE) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 14 (CLIMATE CHANGE AND WASTE MINIMISATION) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 2 (THE SITE AND PROPOSED DEVELOPMENT) BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT 3 (ALTERNATIVES AND DESIGN EVOLUTION) BackGround Papers - Redacted · 17 Mar 2026
  • EIA SCOPING DECISION BackGround Papers - Redacted · 17 Mar 2026
  • EIA SCOPING DECISION ADDENDUM BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT - LOCATION PLAN BackGround Papers - Redacted · 17 Mar 2026
  • ENVIRONMENTAL STATEMENT - 3 ARM ROUNDABOUT NOAK HILL ROAD BackGround Papers - Redacted · 17 Mar 2026
  • 2.2 PROPOSED DUNTON ROAD ACCESS POINTS PLAN (WEST) Drawing · 17 Mar 2026
  • 2.3 BUILDING HEIGHTS PLAN BackGround Papers - Redacted · 17 Mar 2026
  • 2.1 DEVELOPMENT PARAMETERS PLAN G BackGround Papers - Redacted · 17 Mar 2026
  • 4.1 DEVELOPMENT PARAMETERS PLAN A BackGround Papers - Redacted · 17 Mar 2026
  • 7.3 BNG METRIC BackGround Papers - Redacted · 17 Mar 2026
  • 5.1 FACILITIES PLAN Drawing · 17 Mar 2026
  • EUROPEAN DESIGNATED SITES Drawing · 17 Mar 2026
  • NATIONALLY DESIGNATED SITES Drawing · 17 Mar 2026
  • NON-STATUTORY DESIGNATED SITES Drawing · 17 Mar 2026
  • BASELINE HABITATS Drawing · 17 Mar 2026
  • TREES AND BUILDINGS WITH BAT ROOST POTENTIAL AND IMPACTS Drawing · 17 Mar 2026
  • BIRD TERRITORIES Drawing · 17 Mar 2026
  • GREAT CRESTED NEWT SURVEY AREA Drawing · 17 Mar 2026
  • DORMOUSE TUBE LOCATIONS Drawing · 17 Mar 2026
  • OTTER AND WATERVOLE SURVEY LOCATIONS Drawing · 17 Mar 2026
  • REPTILE SURVEY RESULTS Drawing · 17 Mar 2026
  • 7.2 DESIGNATED SITES ASSESSMENT BackGround Papers - Redacted · 17 Mar 2026
  • 7.3 BIODIVERSITY NET GAIN PLAN BackGround Papers - Redacted · 17 Mar 2026
  • 1.1 SITE BOUNDARY PLAN Drawing · 17 Mar 2026
  • 8.2 LINK RECEPTORS PLAN Drawing · 17 Mar 2026
  • 8.3 FRAMEWORK TRAVEL PLAN BackGround Papers - Redacted · 17 Mar 2026
  • 9.4 ACOUSTIC SCREENING PLAN Drawing · 17 Mar 2026
  • ACOUSTIC BARRIERS AND NOISE LEVELS PLAN Drawing · 17 Mar 2026
  • 9.6 PROPOSED SPORTS PITCHES NOISE CONTOUR PLAN BackGround Papers - Redacted · 17 Mar 2026
  • 9.1 NOISE AND VIBRATION ASSESSMENT BackGround Papers - Redacted · 17 Mar 2026
  • 9.3 NOISE MONITORING POINTS PLAN BackGround Papers - Redacted · 17 Mar 2026
  • 10.1 AIR QUALITY ASSESSMENT BackGround Papers - Redacted · 17 Mar 2026
  • 12.2 HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT BackGround Papers - Redacted · 17 Mar 2026
  • 12.3 GEOPHYSICAL SURVEY REPORT BackGround Papers - Redacted · 17 Mar 2026
  • 12.1 RELEVANT PLANNING LEGISLATION, POLICY AND GUIDANCE BackGround Papers - Redacted · 17 Mar 2026
  • 14.3 SUSTAINABILITY - OPERATIONAL WASTE STRATEGY BackGround Papers - Redacted · 17 Mar 2026
  • 14.1 SUSTAINABILITY - ENERGY STRATEGY BackGround Papers - Redacted · 17 Mar 2026
  • 14.2 SUSTAINABILITY - SUSTAINABILITY STATEMENT BackGround Papers - Redacted · 17 Mar 2026
  • GREEN BELT STATEMENT BackGround Papers - Redacted · 17 Mar 2026
  • HEALTH IMPACT ASSESSMENT BackGround Papers - Redacted · 17 Mar 2026
  • PLANNING STATEMENT BackGround Papers - Redacted · 17 Mar 2026
  • TREE SURVEY BackGround Papers - Redacted · 17 Mar 2026
  • AGRICULTURAL LAND QUALITY REPORT BackGround Papers - Redacted · 17 Mar 2026
  • UTILITY STATEMENT BackGround Papers - Redacted · 17 Mar 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT BackGround Papers - Redacted · 17 Mar 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Basildon for determination, against a statutory target of eight weeks. Over the last year Basildon's median decision took 57 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Basildon

  • 25/00575/OUT Refused

    Magdalen Lodge Potash Road Billericay Essex CM11 1HG

    Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road

    30 Apr 2025 Outline
  • 26/00948/OUT Awaiting decision

    Meadow Sweet Oak Road Billericay Essex CM11 2YE

    Construction of detached dwelling and associated works including vehicle access, car parking, cycle storage and hard and soft landscaping on land at Meadow Sweet, Oak Avenue, Crays Hill (Outline application with all matters reserved)

    26 Aug 2026 Outline
  • 26/00890/OUT Awaiting decision

    Curds Farm Tye Common Road Billericay Essex CM12 9PZ

    Outline application for the erection of 9 dwellings with all matters reserved except for access and layout.

    12 Aug 2026 Outline
  • 26/00796/OUT Awaiting decision

    Southlands Gardiners Lane North Billericay Essex CM11 2XA

    Outline planning application for the erection of up to 116 residential dwellings (Use Class C3) with associated access, public open space, landscaping, sustainable drainage infrastructure and associated works (all matters reserved except for access).

    14 Jul 2026 Outline
  • 26/00794/OUT Awaiting decision

    Dunton Grange Lower Dunton Road Dunton Basildon Essex CM13 3SN

    Outline application for the demolition of existing stable building and the construction of 7 no. new dwellings, access improvements from Lower Dunton Road and associated development

    13 Jul 2026 Outline