Skip to content
PlanIndex Get alerts
Menu

Planning application

Festival Leisure Park Festival Way Basildon Essex

Awaiting decision Basildon 25/01680/FULL Full applications

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a mixed-use development comprising 151 residential apartments and 5 commercial units (Use Class E), including 2 commercial units located at ground floor beneath the residential buildings and 3 commercial units to the north of the site, together with associated landscaping, car and cycle parking, new and improved vehicular and pedestrian access, servicing arrangements, public and private amenity space, refuse and plant areas, and all associated groundworks, infrastructure and engineering works.

As published by the council, reference 25/01680/FULL

Application record

Reference
25/01680/FULL
Category
Full applications
Status
Awaiting decision
Received
24 Dec 2025
Validated
30 Jan 2026
Ward
Fryerns

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Basildon

  2. 30 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Basildon took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Ceres Property LLP Agent, registered in Norwich

Active · incorporated 2021 · Norwich

114 applications on PlanIndex · across 23 councils · 86% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

96 documents on file for this application

  • HEALTH IMPACT ASSESSMENT BackGround Papers - Redacted · 30 Jan 2026
  • BLOCK B (PLOTS 28-49) LOWER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) UPPER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) THIRD FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) FOURTH FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) FRONT PLAN Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK B (PLOTS 28-49) SIDE ELEVATION Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) LOWER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) UPPER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) THIRD FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) FOURTH FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) FRONT ELEVATION Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK C (PLOTS 50-74) SIDE ELEVATION Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) LOWER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) UPPER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) THIRD FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) FOURTH FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) FRONT ELEVATION Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK D (PLOTS 75-99) SIDE ELEVATION Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) LOWER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) UPPER GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) THIRD FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) FRONT ELEVATION Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK E (PLOTS 100-120) SIDE ELEVATIONS Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) THIRD FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) FRONT ELEVATION Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK F (PLOTS 121-139) SIDE ELEVATIONS Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) GROUND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) FIRST FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) SECOND FLOOR PLAN Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) FRONT ELEVATION Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) REAR ELEVATION Drawing · 14 Jan 2026
  • BLOCK G (PLOTS 140-151) SIDE ELEVATION Drawing · 14 Jan 2026
  • CAR PORT PLANS Drawing · 14 Jan 2026
  • CYCLE STORE Drawing · 14 Jan 2026
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • PLANTING SCHEDULE FOR BOTH LEVELS BackGround Papers - Redacted · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS GROUND FLORR 1 OF 3 Drawing · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS GROUND FLORR 2 OF 3 Drawing · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS GROUND FLORR 3 OF 3 Drawing · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS UPPER LEVEL 1 OF 3 Drawing · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS UPPER LEVEL 2 OF 3 Drawing · 14 Jan 2026
  • DETAILED PLANTING PROPOSALS UPPER LEVEL 3 OF 3 Drawing · 14 Jan 2026
  • AIR QUALITY ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • ACCOMMODATION SCHEDULE BackGround Papers - Redacted · 14 Jan 2026
  • BIODIVERSITY NET GAIN PLAN (DRAFT) BackGround Papers - Redacted · 14 Jan 2026
  • COVER LETTER BackGround Papers - Redacted · 14 Jan 2026
  • PLANNING STATEMENT BackGround Papers - Redacted · 14 Jan 2026
  • DESIGN AND ACCESS STATEMENT BackGround Papers - Redacted · 14 Jan 2026
  • SEQUENTIAL TEST BackGround Papers - Redacted · 14 Jan 2026
  • HYDRAULIC MODELLING REPORT BackGround Papers - Redacted · 14 Jan 2026
  • HABITATS REGULATIONS ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY REPORT 1 OF 3 BackGround Papers - Redacted · 14 Jan 2026
  • FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY REPORT 3 OF 3 BackGround Papers - Redacted · 14 Jan 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL BackGround Papers - Redacted · 14 Jan 2026
  • LIGHTING ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • UTILITIES ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • TRANSPORT ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • BNG METRIC BackGround Papers - Redacted · 14 Jan 2026
  • FRAMEWORK TRAVEL PLAN BackGround Papers - Redacted · 14 Jan 2026
  • ARBORICULTURAL IMPACT ASSESSMENT BackGround Papers - Redacted · 14 Jan 2026
  • MASSING PLAN Drawing · 13 Jan 2026
  • REFUSE STRATEGY PLAN Drawing · 13 Jan 2026
  • PARKING PLAN Drawing · 13 Jan 2026
  • MATERIAL PLAN Drawing · 13 Jan 2026
  • LAND TAKE PLAN Drawing · 13 Jan 2026
  • NOISE IMPACT ASSESSMENT BackGround Papers - Redacted · 13 Jan 2026
  • BLOCK A (PLOTS1-27) LOWER GROUND FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) UPPER GROUND FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) FIRST FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) SECOND FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) THIRD FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) FOURTH FLOOR PLAN Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) FRONT ELEVATION Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) REAR ELEVATION Drawing · 13 Jan 2026
  • BLOCK A (PLOTS1-27) SIDE ELEVATION Drawing · 13 Jan 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 24 Dec 2025
  • LOCATION PLAN Drawing · 24 Dec 2025
  • LOWER GROUND SITE PLAN Drawing · 24 Dec 2025
  • UPPER GROUND SITE PLAN Drawing · 24 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Basildon for determination, against a statutory target of eight weeks. Over the last year Basildon decided full applications in a median of 63 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Basildon

  • 26/01012/FULL Awaiting decision

    203 Stock Road Billericay Essex CM12 0SE

    Single storey rear extension

    18 Sep 2026 Full applications
  • 26/01011/FULL Awaiting decision

    27 Tyler Avenue Laindon Basildon Essex SS15 5UR

    Proposed garage conversion and part front extension and porch

    18 Sep 2026 Full applications
  • 26/01003/FULL Awaiting decision

    Ryjo Thames View Langdon Hills Basildon Essex SS16 5LN

    Demolition of existing buildings and erection of five detached dwellings with associated private amenity space, parking, access, landscaping, bin storage and cycle storage

    17 Sep 2026 Full applications
  • 26/01000/FULL Awaiting decision

    Warren House Potash Road Billericay Essex CM11 1HH

    Erection of a garden room.

    16 Sep 2026 Full applications
  • 26/00698/FULL Granted

    Gobions Farm Gobions Farm Chase Billericay Essex CM11 2EN

    Retrospective application for the retention and conversion of existing garage and storage building into an ancillary residential annexe

    20 Jun 2026 Full applications