Planning application
Land West Of Mandeville Way Laindon Basildon Essex
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline Planning Application (all matters reserved except for means of vehicular access into the site from Mandeville Way and Lower Dunton Road) for residential development of up to 375 dwellings (Use Class C3) and an early years childcare facility (Use Class E), together with car parking, public open space, landscaping, drainage, and other associated works.
As published by the council, reference 25/00541/OUT
Application record
- Reference
- 25/00541/OUT
- Type
- Outline Application
- Status
- Awaiting decision
- Received
- 22 Apr 2025
- Validated
- 30 Apr 2025
- Ward
- Laindon Park
Timeline
Dates from the published record
-
22 Apr 2025
Received by Basildon
-
30 Apr 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Basildon took a median of 59 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Phase 2 Planning & Development Ltd Agent, a planning consultancy registered in Braintree
Active · incorporated 2011 · Braintree
28 applications on PlanIndex · across 8 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
66 documents on file for this application
- PROPOSED MANDEVILLE WAY/SUMPNERS LINK/DURHAM ROAD GENERAL ARRANGEMENT
- CONSULTATION RESPONSE NOTE: ECOLOGY
- ILLUSTRATIVE MASTERPLAN
- LOCATION PLAN
- LOWER DUNTON ROAD JUNCTION SOUTH ACCESS GENERAL ARRANGEMENT
- LOWER DUNTON ROAD JUNCTION SOUTH ACCESS GENERAL ARRANGEMENT
- ROAD SAFETY AUDIT 1 - DESIGNER?S RESPONSE TO STAGE 1 ROAD SAFETY AUDIT ? LOWER D
- ROAD SAFETY AUDIT 1 - DESIGNER?S RESPONSE TO STAGE 1 ROAD SAFETY AUDIT ? MANDEVI
- DRAFT DESIGN CODE
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- LANDSCAPE AND VISUAL IMPACT FIGURES
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- LANDSCAPE MASTERPLAN
- AGRICULTURAL LAND CLASSIFICATION REPORT
- LAND USE PARAMETER PLAN
- OPEN SPACE PARAMETER PLAN
- ACCESS AND MOVEMENT PARAMETER PLAN
- BUILDING HEIGHTS PARAMETER PLAN
- DAMAGE COST ASSESSMENT TECHINCAL NOTE
- HEALTH IMPACT ASSESSMENT
- ENERGY + SUSTAINABILITY STATEMENT
- APPLICATION FORM - WITHOUT PERSONAL DATA
- SITE SURVEY
- SWEPT PATH ANALYSIS REFUSE VEHICLE
- HOUSE TYPE SCHEDULE
- DESIGN AND ACCESS STATEMENT - PART 1
- DESIGN AND ACCESS STATEMENT - PART 2
- DESIGN AND ACCESS STATEMENT - PART 3
- DESIGN AND ACCESS STATEMENT - PART 4
- DESIGN AND ACCESS STATEMENT - PART 5
- DESIGN AND ACCESS STATEMENT - PART 6
- DESIGN AND ACCESS STATEMENT - PART 7
- DESIGN AND ACCESS STATEMENT - PART 8
- AIR QUALITY ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT: DESIGN STAGE
- HABITATS REGULATIONS ASSESSMENT INFORMATION
- ECOLOGICAL IMPACT ASSESSMENT
- ECOLOGICAL IMPACT ASSESSMENT - APPENDICES
- HERITAGE IMPACT ASSESSMENT
- ACTIVE DESIGN CHECKLIST
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT - PART 2
- NOISE IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- FRAMEWORK RESIDENTIAL TRAVEL PLAN
- FRAMEWORK RESIDENTIAL TRAVEL PLAN - APPENDICES
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT - APPENDIX B
- TRANSPORT ASSESSMENT - APPENDIX C
- TRANSPORT ASSESSMENT - APPENDIX D
- TRANSPORT ASSESSMENT - APPENDIX E
- TRANSPORT ASSESSMENT - APPENDIX F
- TRANSPORT ASSESSMENT - APPENDIX G
- TRANSPORT ASSESSMENT - APPENDIX H - PART 1
- TRANSPORT ASSESSMENT - APPENDIX H - PART 2
- SERVICE SUPPLY STATEMENT - UTILITIES
- EXISTING SERVICES LOCATION PLAN
- PLANNING STATEMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- PRELIMINARY RISK ASSESSMENT (LAND CONTAMINATON)
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- BIODIVERSITY NET GAIN METRIC
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT - PART 1
- TRANSPORT ASSESSMENT - APPENDIX A
- FLOOD RISK ASSESSMENT + DRAINAGE STRATEGY
- FLOOD ASSESSMENT - APPENDICES E-H
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Basildon for determination, against a statutory target of eight weeks. Over the last year Basildon decided outline applications in a median of 341 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The North Of Tesco Mandeville Way Laindon Basildon Essex
98% historically approved · decision due ~15 Dec
Discharge of Conditions 3 (External Finishes), 4 (Boundary Treatment), 5 (Site and Finished Floor Levels), 6 (Landscaping), 8 (External Surface Details), 10 (Refuse and Recycling Facilities), 11 (Contamination), 12 (Surface Water Management Strategy), 20 (Details of Estate Roads and Footways), 28 (Discharge of Surface Water), 30 (Wheel Cleaning Facilities), 31 (Loading / Unloading and Storage of Materials) and 32 (Traffic Management Plan) of planning consent 13/00474/FULL.
Awaiting decision Conditions 14 docs -
TESCO Mandeville Way Laindon Basildon Essex SS15 6TJ
TPO/27/99 T53 and T54 - Populus alba (White Poplar) - Reduce and reshape crown by 2m, Remove dead and diseased wood.
Awaiting decision Trees 2 docs -
Existing Telecommunicaton Mast On Mandeville Way Langdon Hills Basildon Essex
Replace existing 17.5 metre monopole with a 20 metre high monopole supporting 12 no antenna apertures, together with the installation of ground-based equipment cabinets and ancillary development thereto (amendment to granted consent 20/00217/TFULL)
Granted Telecoms 9 docs -
Existing Telecommunicaton Mast On Mandeville Way Langdon Hills Basildon Essex
Replace existing 17.5 metre telecommunications monopole with a 20 metre high monopole supporting 12 no antenna apertures, together with the installation of ground-based equipment cabinets and ancillary works
Granted Telecoms 6 docs -
8 Monmouth Mews Langdon Hills Basildon SS16 6TP
T6 of TPO/16/00 (Oak) - Crown reduction of up to 2m and limit the thin to 15% and to only include branches of diameter up to 8cm.
Decided Trees 2 docs -
8 Monmouth Mews Langdon Hills Basildon Essex SS16 6TP
T6 (Oak) of TPO/16/00 - crown reduction of 3m and a 10-15% crown thin.
Withdrawn Trees 1 doc
Other outline applications
In Basildon
-
26/00794/OUT Granted
Dunton Grange Lower Dunton Road Dunton Basildon Essex CM13 3SN
Outline application for the demolition of existing stable building and the construction of 7 no. new dwellings, access improvements from Lower Dunton Road and associated development
-
24/01047/OUT Awaiting decision
Blackthorn Stud Kennel Lane Billericay Essex CM12 9RS
Outline application with all matters reserved (except access) for the construction of up to 11 dwellings.
-
25/00794/OUT Granted
Great Broomfields Cranfield Park Road Wickford Essex SS12 9EP
Outline application with all matters reserved (except access) for the demolition and partial demolition of the existing commercial buildings, construction of 26 no. retirement apartments (Use Class C2), and a 70 no. bed care home (Use Class C2); alterations and change of use of the remaining commercial building to a residents tea/day room.
-
25/00575/OUT Refused
Magdalen Lodge Potash Road Billericay Essex CM11 1HG
Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road
-
26/00982/SCREEN Awaiting decision
Land North Of Nevendon Road Basildon Essex
EIA Screening Opinion - Proposal for up to 380 residential dwellings, including the potential provision of a healthcare facility, provision of new surface water drainage basins, vehicular and pedestrian access arrangements, public open space, landscaping, pedestrian and cycle links, enhancements to existing Public Rights of Way, and associated infrastructure works; all matters reserved except access.