Planning application
Scout Hall York Road Barnet EN5 1LL
Works: New dwelling Demolition Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 1 (Approved Plans) of planning permission reference 24/4138/FUL dated 03/03/25 for 'Demolition of the existing Scout Hut and construction of a two storey detached building with rooms in the roofspace to provide 9no. self-contained flats. Associated amenity space, cycle parking, off-street car parking, refuse storage, and landscaping.' Variation to include: Introduction of a staggered retaining wall arrangement to the rear of the site; Amendment of the side access ramp; Relocation/adjustment of the rear cycle storage area to a lower level; Updating of the SuDS strategy; Updating of the BNG; Removal of Trees T1 and T2.
As published by the council, reference 26/3466/S73
Application record
- Reference
- 26/3466/S73
- Status
- Pending Consideration
- Received
- 24 Sep 2026
- Validated
- 24 Sep 2026
- Postcode
- EN5 1LL
Site history
Applications at this address on the Barnet register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
26/1695/BNG Granted
Scout Hall York Road Barnet EN5 1LL
Submission of details of general condition of planning permission Biodiversity Gain Plan pursuant to planning permission 24/4138/FUL dated 03/03/25
-
26/1654/S73 Granted
Scout Hall York Road Barnet EN5 1LL
Variation of condition 1 (Approved plans) of planning permission reference 24/4138/FUL dated 03/03/2025 for 'Demolition of the existing Scout Hut and construction of a two storey detached building with rooms in the roofspace to provide 9no. self-contained flats. Associated amenity space, cycle parking, off-street car parking, refuse storage, and landscaping' Variation to include increase ground floor, alter flat 2 layout, changes to fenestration above ground floor windows and new energy and sustainability exceeds requirements of condition 21
-
25/3958/CON Awaiting decision
Scout Hall York Road Barnet EN5 1LL
Submission of details of conditions 3 (Materials), 4 (Levels), 5 (Crossover Modifications), 9 (Tree Protection Plan), 11 (Foundations in Relation to Trees), 12 (Demolition and Construction Management and Logistics Plan), 13 (Amenity Areas - Sub-division), 14 (Drainage Strategy), 16 (Noise Mitigation Measures), 17 (Sound Insulation mitigation Measures), 20 (Privacy Screens) and 25 (Landscape and Ecological Management Plan) pursuant to planning permission 24/4138/FUL dated 03/03/25
Timeline
Dates from the published record
-
24 Sep 2026
Received by Barnet
-
29 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Barnet took a median of 46 days over the applications it decided in the last year.
What happens while it is decided
This application is with Barnet for determination, against a statutory target of eight weeks. Over the last year Barnet's median decision took 46 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Barnet's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Scout Hall York Road Barnet EN5 1LL
Submission of details of general condition of planning permission Biodiversity Gain Plan pursuant to planning permission 24/4138/FUL dated 03/03/25
Granted 4 docs -
Scout Hall York Road Barnet EN5 1LL
Variation of condition 1 (Approved plans) of planning permission reference 24/4138/FUL dated 03/03/2025 for 'Demolition of the existing Scout Hut and construction of a two storey detached building with rooms in the roofspace to provide 9no. self-contained flats. Associated amenity space, cycle parking, off-street car parking, refuse storage, and landscaping' Variation to include increase ground floor, alter flat 2 layout, changes to fenestration above ground floor windows and new energy and sustainability exceeds requirements of condition 21
Granted Conditions New dwelling Demolition +1 12 docs -
Scout Hall York Road Barnet EN5 1LL
93% historically approved · decision due ~25 Nov
Submission of details of conditions 3 (Materials), 4 (Levels), 5 (Crossover Modifications), 9 (Tree Protection Plan), 11 (Foundations in Relation to Trees), 12 (Demolition and Construction Management and Logistics Plan), 13 (Amenity Areas - Sub-division), 14 (Drainage Strategy), 16 (Noise Mitigation Measures), 17 (Sound Insulation mitigation Measures), 20 (Privacy Screens) and 25 (Landscape and Ecological Management Plan) pursuant to planning permission 24/4138/FUL dated 03/03/25
Awaiting decision Conditions Demolition Trees 11 docs -
15 Denewood Barnet EN5 1LX
Single storey rear extension following a partial demolition of the existing rear extension (AMENDED DESCRIPTION)
Granted Lawful development Extension Demolition 10 docsSmall domestic -
22 Eversleigh Road Barnet EN5 1NE
New roof and windows to existing rear conservatory
Refused Lawful development Extension Roofing +1 9 docs -
151 Lancaster Road Barnet EN4 8AJ
79% historically approved · decision due ~5 Oct
Changes to fenestration; installation of new rear sliding doors, replacement of existing windows. New rear raised patio area, privacy planters and installation of balustrade to the rear elevation with access steps to garden
Awaiting decision Windows or glazing