Skip to content
PlanIndex Get alerts
Menu

Planning application

Basement 71 Watling Avenue Edgware HA8 0LD

Awaiting decision Barnet 26/3105/191

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Use as a commercial workshop unit (Use Class E)

As published by the council, reference 26/3105/191

Application record

Reference
26/3105/191
Status
Pending Consideration
Received
24 Aug 2026
Validated
24 Aug 2026
Postcode
HA8 0LD

Site history

Applications at this address on the Barnet register

This site has had 2 applications since 2026.

  • 26/1283/191 Awaiting decision

    Basement 71 Watling Avenue Edgware HA8 0LD

    Use as a commercial workshop unit (Use Class E)

    Submitted 3 Apr 2026 Lawful development

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Barnet

  2. 28 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 46 days over the applications it decided in the last year.

What happens while it is decided

This application is with Barnet for determination, against a statutory target of eight weeks. Over the last year Barnet's median decision took 46 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Barnet's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Basement 71 Watling Avenue Edgware HA8 0LD

    26/1283/191 Submitted 3 Apr 2026 50 yards away

    80% historically approved · decision due ~2 Jun

    Use as a commercial workshop unit (Use Class E)

    Awaiting decision Lawful development 4 docs
  • Burnt Oak Underground Station Watling Avenue Edgware HA8 0LA

    TCP/0465/26 Submitted 11 Aug 2026 50 yards away

    79% historically approved · decision due ~6 Oct

    5 x Ash (applicants ref. T1, T2, T3, T4, T5) - Full tree removal including stumps. Full removal of shrub. Removal required to install foundations and drainage attenuation system for step free access works at the station in line with approved planning.

    Awaiting decision Trees
  • Burnt Oak Underground Station Watling Avenue Edgware HA8 0LA

    26/0538/CON Submitted 11 Feb 2026 100 yards away

    Submission of details of Condition 3 (Metal Panelling) pursuant to planning permission 19/4837/PNG dated 06/12/2019

    Granted Conditions 3 docs
  • Burnt Oak Underground Station Watling Avenue Edgware HA8 0LA

    26/1615/NMA Submitted 29 Apr 2026 100 yards away

    Non material amendment to planning permission 19/4837/PNG dated 06/12/2019 for 'Installation of a free access lift shaft, elevated walkway and overbridge linking the island platform, switch room, removal and repositioning of existing maintenance stair, minor demolition(including platform waiting shelter and redundant station office) and associated works.'. Amendments include updated lift shaft design, additional glazed screen perch seat at upper lift lobby, overbridge cladding setting out and floor levels and structural changes to overbridge columns and stairs

    Granted Amendments Demolition Windows or glazing 4 docs
  • 47, 49 And 51 Watling Avenue Edgware HA8 0LF

    26/2821/ADV Submitted 30 Jul 2026 100 yards away

    Installation of non internally illuminated fascia signage to all 3 shopfronts

    Refused Advertising
  • 17 Watling Avenue Edgware HA8 0LQ

    26/2046/RCU Submitted 2 Jun 2026 150 yards away

    Erection of a front canopy with a wooden structure and flat roof (Retrospective Application)

    Refused Amendments 7 docs