Planning application
36 Friern Watch Avenue London N12 9NT
Works: Extension Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Roof extension involving hip-to-gable roof enlargement with rear dormer window, Juliet balcony, removal of the existing chimney stack, three front-facing rooflights and a new side gable window. Alterations to the existing front projection, including replacement of the existing flat roof with a mono-pitched roof and the extension and reconfiguration of the existing WC. (Amended)
As published by the council, reference 26/3006/192
Application record
- Reference
- 26/3006/192
- Status
- Unlawful
- Received
- 14 Aug 2026
- Validated
- 14 Aug 2026
- Postcode
- N12 9NT
Site history
Applications at this address on the Barnet register
This site has had 3 applications since 2026.
-
26/3256/192 Awaiting decision
36 Friern Watch Avenue London N12 9NT
Roof extension involving hip to gable, rear dormer with juliette balcony, 3no. front facing rooflights and new side gable window. Removal of chimney stack
-
26/3051/PNH Awaiting decision
36 Friern Watch Avenue London N12 9NT
Single storey rear extension with a proposed depth of 4.00 metres, maximum height of 3.50 metres and eaves height of 2.90 metres.
Timeline
Dates from the published record
-
14 Aug 2026
Received by Barnet
-
15 Aug 2026
Added to PlanIndex
-
24 Aug 2026
Status changed to Pending Decision
Previously Pending Consideration.
-
28 Aug 2026
Status changed to Unlawful
Previously Pending Decision.
-
Decision
Awaiting decision
Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Barnet took a median of 43 days over the applications it decided in the last year.
What happens while it is decided
This application is with Barnet for determination, against a statutory target of eight weeks. Over the last year Barnet's median decision took 43 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Barnet's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
36 Friern Watch Avenue London N12 9NT
79% historically approved · decision due ~2 Nov
Roof extension involving hip to gable, rear dormer with juliette balcony, 3no. front facing rooflights and new side gable window. Removal of chimney stack
Awaiting decision Extension Loft or dormer +1 -
36 Friern Watch Avenue London N12 9NT
58% historically approved · decision due ~16 Oct
Single storey rear extension with a proposed depth of 4.00 metres, maximum height of 3.50 metres and eaves height of 2.90 metres.
Awaiting decision Prior approval ExtensionSmall domestic -
888 - 896 High Road London N12 9RG
Submission of details of Condition 3 (Materials) pursuant to planning permission 25/3266/FUL dated 17/10/2025
Granted Conditions 3 docs -
6 Ravensdale Avenue London N12 9HS
Single storey side and rear extension with 5no. side and rear rooflights following the demolition of garage and conservatory
Granted Householder Extension Loft or dormer +1 9 docsSmall domestic -
North Finchley Telephone Exchange 885 High Road London N12 8QA
79% historically approved · decision due ~15 Oct
Removal of 3 x Nokia AEQC antenna at 22.6m from the stub-tower upon the rooftop of the BT Telephone Exchange. Installation of 3 x Nokia AVHQB antenna at 22.6m utilising existing steelwork upon the stub-tower on the exchange rooftop. Ancillary works will see the re-use of 3 x existing A13451R0V06 antenna at 22.6m and 3 x AZNC RRUs at 22m on the stub-tower. Removal of 6 x RRUs at 22m, 3 x C2 Combiners and 6 x Feeder cables and replacement with 6 x new NOKIA RRUs at 22m, 3 x Multicore fibre cables, 3 x DC Cables, 3 x BoB Boxes, the re-use of 3 x existing multicore fibre cables and refreshment works within the rooftop equipment cabinets.
Awaiting decision -
912 - 920 High Road London N12 9RW
95% historically approved · decision due ~1 Apr
Submission details of conditions 3 (Levels), 4 (Materials), 7 (Delivery and Servicing Plan), 16 (Solar PV Panels), 17 (Means of Enclosure), 18 (Privacy Screens), 27 (Refuse) and 29 (Landscaping) pursuant to planning permission 22/1040/S73 dated 21/05/25
Awaiting decision Conditions 9 docs