Planning application

330 High Road London N2 9AD

Awaiting decision Barnet 26/2464/FUL Full applications

Works: New dwelling Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of rear storage/retail unit and construction of a retail unit with basement level and 2no self-contained flats over first and second floors, with side balconies and privacy screens. Associated refuse/recycling store, cycle store parking and amenity space

As published by the council, reference 26/2464/FUL

Application record

Reference
26/2464/FUL
Category
Full applications
Status
Pending Consideration
Received
29 Jun 2026
Validated
1 Jul 2026
Postcode
N2 9AD

Timeline

Dates from the published record

  1. 29 Jun 2026

    Received by Barnet

  2. 1 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 330 High Road London N2 9AD

    26/0426/CON Submitted 4 Feb 2026 19m away

    95% historically approved · decision due ~1 Apr

    Submission of details of conditions 3 (Materials), 4 (Levels) and 13 (Demolition and Construction Management and Logistics Plan) pursuant to planning permission dated 23/05/22

    Awaiting decision Conditions Demolition 5 docs
  • 330 High Road London N2 9AD

    26/1679/191 Submitted 5 May 2026 21m away

    79% historically approved · decision due ~30 Jun

    Implementation of planning permission 18/6392/FUL dated 19/12/18 for 'Demolition of rear storage/retail unit and construction of a retail unit with basement level and 2no self-contained flats over first and second floors, with side balconies and privacy screens. Associated refuse/recycling store, cycle store, parking and amenity space.'

    Awaiting decision Lawful development New dwelling Demolition 9 docs
  • 44 Lankaster Gardens London N2 9AJ

    26/0615/HSE Submitted 17 Feb 2026 155m away

    Single storey side infill extension

    Granted Householder Extension 8 docs
    Small domestic
  • 10 Sylvester Road London N2 8HN

    26/3040/192 Submitted 18 Aug 2026 159m away

    79% historically approved · decision due ~13 Oct

    Roof extension involving rear dormer window and 3no. front facing rooflights

    Awaiting decision Extension Loft or dormer +1
  • Pavement Adjacent To 383 High Road London N2 8HS

    26/0863/FUL Submitted 6 Mar 2026 201m away

    60% historically approved · decision due ~19 May

    Installation of InPost Parcel Locker

    Awaiting decision Full applications 11 docs
  • 47 Sylvester Road London N2 8HN

    26/0477/192 Submitted 9 Feb 2026 216m away

    79% historically approved · decision due ~6 Apr

    Roof extension involving rear dormer window

    Awaiting decision Lawful development Extension Loft or dormer +1 3 docs

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications