Skip to content
PlanIndex Get alerts
Menu

Planning application

Yew Tree Court Bridge Lane London NW11 0RA

Awaiting decision Barnet 26/2440/FUL Full applications

Works: Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of new Sukkah Roofs and AOV ( automatic opening vent) rooflights to flat roof mansard

As published by the council, reference 26/2440/FUL

Application record

Reference
26/2440/FUL
Category
Full applications
Status
Pending Decision
Received
26 Jun 2026
Validated
26 Jun 2026
Postcode
NW11 0RA

Timeline

Dates from the published record

  1. 26 Jun 2026

    Received by Barnet

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Yew Tree Court Bridge Lane London NW11 0RA

    25/4751/CON Submitted 27 Nov 2025 14m away

    Submission of details of condition 4 (Landscaping) 5 (Demolition, Construction Management and Logistics Plan (DCMLP) 8 (Mitigation Measures) pursuant to planning permission 23/3530/S73 dated 09/01/2024

    Granted Conditions Demolition 11 docs
  • Yew Tree Court Bridge Lane London NW11 0RA

    26/2178/NMA Submitted 11 Jun 2026 17m away

    Non-material amendments to planning permission reference 23/3530/S73 dated 09/01/24 (Variation of 21/5116/OUT) for 'Construction of an additional mansard storey to the existing building to provide 9no. self-contained flats and installation of new lifts.' Amendments include revision of the approved drawings to reflect the as-built position of existing windows and the stairwell core on the east elevation, and associated layout adjustments to Flats 18A and 19A

    Granted Amendments New dwelling Loft or dormer +1 11 docs
  • 28 Temple Fortune Parade Finchley Road London NW11 0QS

    25/5195/FUL Submitted 29 Dec 2025 27m away

    60% historically approved · decision due ~23 Feb

    Demolition of existing single storey storage area at rear and construction of a part single, part two storey rear extension for use ancillary to the existing ground floor commercial unit. Conversion of the existing flat into a 6 room HMO (House in Multiple Occupation), with roof extensions including enlargement of existing second floor rear dormer window, addition 2no. rooflights to front roofslope. Creation of additional commercial storage area at first floor level. Associated refuse/recycling and cycle storage

    Awaiting decision Full applications Extension Loft or dormer +2 19 docs
    Small domestic
  • 28 Temple Fortune Parade Finchley Road London NW11 0QS

    26/1960/CON Submitted 27 May 2026 27m away

    95% historically approved · decision due ~22 Jul

    Submission of details of condition 4 (Cycle Parking Spaces and Storage) 5 (Refuse and Recycling) 7 (Demolition and Construction Management and Logistics Plan) pursuant to planning permission 25/5195/FUL dated 02/03/2026

    Awaiting decision Conditions Demolition 5 docs
  • 40 Temple Fortune Parade Finchley Road London NW11 0QX

    26/0918/RMA Submitted 11 Mar 2026 72m away

    Reserved matters application seeking approval for landscaping pursuant to outline planning permission 25/5049/S73 dated 24/02/26 (amendment to 24/2930/OUT) for 'Three-storey rear extension (at ground, first and second floor), and an additional new storey (third floor). Change of use of existing first and second floor flats to provide an 18-room, 18-person HMO and 3no. 1-bedroom flats. Associated refuse/recycling and cycle storage, with landscaping reserved.'

    Granted Reserved matters New dwelling Extension 7 docs
  • 40 Temple Fortune Parade Finchley Road London NW11 0QX

    26/0124/CON Submitted 14 Jan 2026 77m away

    95% historically approved · decision due ~11 Mar

    Submission of details of condition 3 (Demolition, Construction Management and Logistics Plan) 4 (Materials) 5 (Refuse & Recycling) 13 (Before Survey) 17 (Angled Windows) 18 (Privacy Screens and Balustrades) 19 (Noise Mitigation) 21 (Air pollution mitigation) 23 (Biodiversity Enhancement Plan) pursuant to planning permission 24/2930/OUT dated 19/06/2025

    Awaiting decision Conditions Demolition Windows or glazing 18 docs

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications