Skip to content
PlanIndex Get alerts
Menu

Planning application

36 And 38 Eastside Road London NW11 0BA

Awaiting decision Barnet 26/1038/FUL Full Application

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

First floor rear extension to both properties. Change of ground floor roof at rear elevation from pitched to flat roof to no. 38

As published by the council, reference 26/1038/FUL

Application record

Reference
26/1038/FUL
Type
Full Application
Status
Pending Consideration
Received
18 Mar 2026
Validated
30 Mar 2026
Ward
Golders Green
Postcode
NW11 0BA

Site history

Applications at this address on the Barnet register

This site has had 2 applications since 2026.

  • 26/2920/FUL Decided

    36 And 38 Eastside Road London NW11 0BA

    First floor rear extension to both properties. Change of ground floor roof at rear elevation from pitched to flat roof to no. 38

    Submitted 6 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 18 Mar 2026

    Received by Barnet

  2. 30 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 45 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Barnet for determination, against a statutory target of eight weeks. Over the last year Barnet decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 38 Eastside Road London NW11 0BA

    26/0634/HSE Submitted 18 Feb 2026 50 yards away

    First floor rear extension

    Granted Householder Extension 7 docs
    Domestic
  • 38 Eastside Road London NW11 0BA

    26/0614/HSE Submitted 17 Feb 2026 50 yards away

    Replacement of ground floor rear roof with sukkah roof

    Granted Householder 7 docs
    Domestic
  • 38 Eastside Road London NW11 0BA

    26/0786/192 Submitted 2 Mar 2026 50 yards away

    Roof extension involving hip to gable, rear dormer window and 3no. front facing rooflights

    Granted Lawful development Extension Loft or dormer +1 6 docs
  • 36 And 38 Eastside Road London NW11 0BA

    26/2920/FUL Submitted 6 Aug 2026 50 yards away

    63% historically approved · decision due ~1 Oct

    First floor rear extension to both properties. Change of ground floor roof at rear elevation from pitched to flat roof to no. 38

    Decided Full applications Extension 8 docs
  • 22 Monkville Avenue London NW11 0AH

    26/0209/HSE Submitted 20 Jan 2026 100 yards away

    77% historically approved · decision due ~20 Mar

    Part single, part two storey front, side and rear extension with associated terrace. Roof extension involving hip to gable, rear dormer window with juliette balconies and 4no. front facing rooflights. Creation of new basement level and terrace

    Awaiting decision Householder Extension Loft or dormer +1 14 docs
    Domestic
  • 13 Monkville Avenue London NW11 0AH

    26/1733/HSE Submitted 8 May 2026 100 yards away

    First floor side extension and rear extension

    Refused Householder Extension 7 docs
    Domestic

In Barnet

  • 26/4001/FUL Awaiting decision

    Frith Manor Orchard Partingdale Lane London NW7 1NX

    Demolition of the existing dwelling and erection of a new two storey dwelling

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/3998/FUL Awaiting decision

    Ivy Lodge Hadley Common Barnet EN5 5QD

    Demolition of the existing dwelling and erection of a new two storey dwelling with associated amenity space, refuse/recycling storage and 2no off-street parking spaces (phased development)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/3995/FUL Awaiting decision

    Flat B Kingsdene Hammers Lane London NW7 4BY

    Conversion of the first and second floor flat into 2no. self-contained flats. Provision of 1no. off-street car parking and refuse/recycling and cycle storage

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/3971/FUL Awaiting decision

    Lubavitch House Kingsley Way London N2 0EH

    Installation of pedestrian and vehicle access gates fronting Kingsley Way. Installation of mesh security fencing around site perimeter. Replacement of 7no. external doors to the building with new security doors

    Received 3 Nov, published by the council 4 Nov 2026 Full applications
  • 26/3979/FUL Awaiting decision

    St Pauls Church Of England Primary School The Ridgeway London NW7 1QU

    Installation of 2no. air source heat pumps to the rear within associated acoustic fencing and access gate

    Received 3 Nov, published by the council 4 Nov 2026 Full applications