Skip to content
PlanIndex Get alerts
Menu

Planning application

The Henrietta Barnett School Central Square London NW11 7BN

Awaiting decision Barnet 26/0493/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Stripping of existing waterproofing system and recovering of flat roofs to the Art, Design and Technology Wing and Music and Drama Wing

As published by the council, reference 26/0493/FUL

Application record

Reference
26/0493/FUL
Type
Full Application
Status
Pending Consideration
Received
9 Feb 2026
Validated
9 Feb 2026
Ward
Garden Suburb
Postcode
NW11 7BN

Timeline

Dates from the published record

  1. 9 Feb 2026

    Received by Barnet

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Braintree

54 applications on PlanIndex · across 27 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Henrietta Barnett School Central Square London NW11 7BN

    26/0494/LBC Submitted 9 Feb 2026 0m away

    79% historically approved · decision due ~6 Apr

    Stripping of existing waterproofing system and recovering of flat roofs to the Art, Design and Technology Wing and Music and Drama Wing (Listed Building)

    Awaiting decision Heritage and listed buildings 20 docs
  • The Henrietta Barnett School Central Square London NW11 7BN

    26/2373/LBC Submitted 23 Jun 2026 46m away

    79% historically approved · decision due ~18 Aug

    Fire door repair and replacement and associated work, including the replacement of existing lighting to Art and DTE block, and to Music and Drama block

    Awaiting decision Heritage and listed buildings
  • St Judes Vicarage Central Square London NW11 7AH

    26/2038/LBC Submitted 1 Jun 2026 57m away

    Internal and external works including: Internal and external cracking repairs arising from subsidence, Window repairs and provision of secondary glazing to all windows. Renewal of leaking roofs associated with the flat roof/veranda over the vicarage, WC and the flat roof balcony over the east facing bathrooms. Environmental improvements addressing acoustics within the property. Removal of non-original plastic/perspex roof to rear courtyard with associated works. New safety handrail to front entrance steps

    Granted Heritage and listed buildings Windows or glazing 45 docs
  • 23 South Square London NW11 7AJ

    TCP/0644/25 Submitted 2 Oct 2025 70m away

    87% historically approved · decision due ~27 Nov

    1 x Eucalyptus (applicants ref. T1) - Approximately 13.00m: Reduce crown by up to approximately 3.50m-4.00m effectively reducing by approximately 40%. Thin crown density throughout by 20-25%. Remove major dead wood. General maintenance. 1 x Mature Sycamore (applicatnts ref. T2) - Approximately 13.00m: Reduce crown by up to approximately 2.20m all round. Thin crown density by 30%. Remove dead wood. Remove ivy. General maintenance. 1 x Cypress (applicants ref. T3) - Approximately 7.00m: Reduce crown by up to approximately 1.20m-1.50mm. Remove major dead wood throughout. General maintenance.

    Awaiting decision Trees 3 docs
  • 10 Southway London NW11 6RU

    TCP/0287/26 Submitted 19 May 2026 75m away

    1 x Laurel (applicants ref. T1) - Cut the entire tree to ground level. (Exempt works 5 day notice)

    Decided Trees 6 docs
  • The Henrietta Barnett School Central Square London NW11 7BN

    TCP/0048/26 Submitted 22 Jan 2026 75m away

    87% historically approved · decision due ~19 Mar

    1 x Oak (applicants ref. T001) - Crown lift to 3 m for pedestrian clearance. Remove deadwood. 1 x Crab Apple (applicants ref. T017) - Thin crown by 25%. 1 x Oak (applicants ref. T028) - Crown lift to 3 m for pedestrian clearance. Crown reduce on the building side to give 3 metres clearance over the roof. Remove deadwood. 1 x Indian Bean Tree (applicants ref. T032) - Formative prune young tree and re-stake upright. Re-create new tree pit around stem of 500mm diameter and mulch with chippings to depth of 75mm. 1 x Indian Bean Tree (applicants ref. T035) - Crown lift to 3 m for pedestrian clearance. 1 x Oak (applicants ref. T036) - Crown lift to 5.2 m for highway clearance. 1 x Oak (applicants ref. T037) - Crown lift to 5.2 m for highway clearance. 1 x Oak (applicants ref. T038) Crown lift to 5.2 m for highway clearance. 1 x Oak (applicants ref. T039) - Crown lift to 3 m for pedestrian clearance. Crown lift to 5.2 m for highway clearance. Crown reduce by 2m on building side only Remove deadwood. 1 x Oak (applicants ref. T040) - Crown lift to 3 m for pedestrian clearance. Crown lift to 5.2 m for highway clearance. Crown reduce by 2m on building side only Remove deadwood. 1 x Weeping Pear (applicants ref. T042) - Formal annual trim by 0.5 metres overall. 1 x Black Mulberry (applicants ref. T044) - Formative prune young tree. 1 x Magnolia (applicants ref. T045) - Remove deadwood - greater than 25 mm. Create tree pit of 500mm diameter around stem base and mulch with chippings to depth of 100mm. 1 x Magnolia (applicants ref. T046) - Remove deadwood. Create tree pit of 500mm diameter around stem base and mulch with chippings to depth of 100mm.

    Awaiting decision Trees 4 docs

In Barnet

  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications
  • 26/3205/FUL Awaiting decision

    The Knoll Highwood Hill London NW7 4ET

    Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage

    1 Sep 2026 Full applications
  • 26/3204/FUL Awaiting decision

    136 Station Road London N3 2SG

    Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window

    1 Sep 2026 Full applications
  • 26/3195/FUL Awaiting decision

    128 - 130 Woodfield Drive Barnet EN4 8PB

    Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)

    1 Sep 2026 Full applications