Planning application
Ellern Mede Orange Tree School Oakleigh Park North London N20 9AR
Works: Loft or dormer
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Additional storey at first floor level with 2no. side rooflights
As published by the council, reference 25/4866/FUL
Application record
- Reference
- 25/4866/FUL
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 4 Dec 2025
- Validated
- 5 Dec 2025
- Ward
- Whetstone
- Postcode
- N20 9AR
Timeline
Dates from the published record
-
4 Dec 2025
Received by Barnet
-
5 Dec 2025
Validated
Checked as complete and ready for consideration.
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Barnet took a median of 43 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
86 Oakleigh Road North London N20 9EZ
60% historically approved · decision due ~5 Feb
Demolition of existing garage and construction of a part single, part two storey single family dwellinghouse with rooms in the roofspace including 1no. rear dormer and 1no. rooflight to front. Alterations and extensions to No.86 including, single storey rear extension, roof extension including hip to gable, rear dormer and 3no. front facing rooflights. Associated alterations to hard and soft landscaping including provision of amenity space, refuse storage, cycle store, heat pump and off-street parking
Awaiting decision Full applications Extension Loft or dormer +1 36 docsSmall domestic -
86 Oakleigh Road North London N20 9EZ
77% historically approved · decision due ~26 Nov
Demolition of existing garage and construction of a two-storey side extension with associated roof extension including hip to gable with 2no. rear dormers and 5no. rooflights to front roofslope. Single storey rear extension with rooflights. and alterations to hard and soft landscaping including off-street parking, refuse storage and new rear patio
Awaiting decision Householder Extension Loft or dormer +1 35 docsSmall domestic -
16 Oxford Gardens London N20 9AG
77% historically approved · decision due ~18 Feb
Single storey side/rear extension with 3no. rooflights with new patio area. New front porch. Conversion of the existing garage into habitable room insertion of window to replace garage door. New side boundary fencing
Awaiting decision Householder Extension Loft or dormer +1 8 docsSmall domestic -
Tennis Club 100 Oakleigh Road North London N20 9EZ
60% historically approved · decision due ~11 Sep
Replacement of 42no halogen floodlights with LED units and the replacement of 14no lighting columns
Awaiting decision Full applications -
18 Athenaeum Road London N20 9AE
77% historically approved · decision due ~21 Aug
Two storey side extension following demolition of the existing garage
Awaiting decision Householder Extension Demolition 6 docsDomestic -
18 Athenaeum Road London N20 9AE
Single storey rear extension with a proposed maximum depth of 6.0m, a maximum height of 2.95m and an eaves height of 2.85m
Withdrawn Prior approval Extension 8 docsSmall domestic
Other full applications applications
In Barnet
-
26/3239/FUL Awaiting decision
Henley Court Watford Way London NW4 4SR
Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage
-
26/3238/FUL Awaiting decision
2 North End Road London NW11 7PH
New shopfront with double glazed front folding doors
-
26/3230/FUL Awaiting decision
50 Ballards Lane London N3 2DP
Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations
-
26/3199/FUL Awaiting decision
494 Finchley Road London NW11 8DE
Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage
-
26/3200/FUL Awaiting decision
289 Regents Park Road London N3 3JY
Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)