Skip to content
PlanIndex Get alerts
Menu

Planning application

103 Wolmer Gardens Edgware HA8 8QQ

Awaiting decision Barnet 25/3632/HSE Householder Application

Works: Extension Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Single storey side/rear extension with 2no. flat rooflights. First floor side extension

As published by the council, reference 25/3632/HSE

Application record

Reference
25/3632/HSE
Type
Householder Application
Status
Pending Consideration
Received
3 Sep 2025
Validated
3 Sep 2025
Ward
Edgwarebury
Postcode
HA8 8QQ

Timeline

Dates from the published record

  1. 3 Sep 2025

    Received by Barnet

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 29 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

125 applications on PlanIndex · across 16 councils · 68% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • 103 Wolmer Gardens Edgware HA8 8QQ

    25/4231/HSE Submitted 22 Oct 2025 0m away

    Single storey side/rear extension with 2no. flat rooflights. First floor side extension. Retention of rear dormer window

    Granted Householder Extension Loft or dormer +1 4 docs
    Several homes
  • 92 Wolmer Gardens Edgware HA8 8QD

    25/3333/HSE Submitted 11 Aug 2025 90m away

    Single storey front extension including conversion of the existing garage into habitable room, insertion of new front door and window to replace garage door. Single storey rear extension

    Refused Householder Extension Windows or glazing 9 docs
    Small domestic
  • 92 Wolmer Gardens Edgware HA8 8QD

    25/3332/192 Submitted 11 Aug 2025 90m away

    Roof extensions including hip to gable, rear dormer, 1no. front facing triple rooflight, new side gable window and chimney removal

    Decided Lawful development Extension Loft or dormer +1 6 docs
  • 92 Wolmer Gardens Edgware HA8 8QD

    25/3929/HSE Submitted 25 Sep 2025 90m away

    77% historically approved · decision due ~20 Nov

    Single storey front and side extensions including new front porch, conversion of the existing garage into habitable room, insertion of new front door and window to replace garage door following partial demolition. Changes to rear fenestration

    Awaiting decision Householder Extension Demolition +1 7 docs
    Small domestic
  • 222 Edgwarebury Lane Edgware HA8 8QW

    25/3986/192 Submitted 1 Oct 2025 91m away

    79% historically approved · decision due ~27 Nov

    Erection of a rear recreation room and storage room See drawing 'Proposed Floor Plan' with details of proposed floor areas' and garden area.

    Awaiting decision Lawful development 4 docs
  • 92 Wolmer Gardens Edgware HA8 8QD

    25/4446/HSE Submitted 7 Nov 2025 91m away

    Part single, part two storey front, side, and rear extensions including new front porch, conversion of the existing garage into habitable room, insertion of new front door and window to replace garage door following partial demolition. Changes to rear fenestration

    Refused Householder Extension Demolition +1 8 docs
    Small domestic

In Barnet

  • 26/3249/HSE Awaiting decision

    19 Rushdene Avenue Barnet EN4 8EN

    New front vehicular access and hardstanding to provide off-street parking space. New retaining wall following demolition of the existing wall and raised planted beds

    7 Sep 2026 Householder
  • 26/3235/HSE Awaiting decision

    26 Mount Pleasant Barnet EN4 9HH

    Replace existing flat roof at ground floor rear elevation with pitched roof and 2no. rooflights

    4 Sep 2026 Householder
  • 26/3222/HSE Awaiting decision

    46 Michleham Down London N12 7JN

    Single storey side/rear extension with 3no. rooflights following demolition of the existing storage/utility structure. Changes to fenestration

    3 Sep 2026 Householder
  • 26/3219/HSE Awaiting decision

    53 Tudor Road Barnet EN5 5NW

    First floor rear extension with front and rear rooflights. Roof extension over existing garage

    2 Sep 2026 Householder
  • 26/3210/HSE Awaiting decision

    47 Pattison Road London NW2 2HL

    New front vehicular access to provide off-street parking. Removal of existing gate and shed, alterations to the existing front boundary wall and installation of close board fencing panels.

    2 Sep 2026 Householder