Planning application
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Relates to DC/26/00335
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application under Section 73 of The Town and Country 1990 - Variation of Condition 2 (Approved Plans and Documents) of Planning Permission DC/26/00335 dated: 19/05/2026 - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and installation of new private treatment plant.
As published by the council, reference DC/26/03459
Application record
- Reference
- DC/26/03459
- Type
- Full App Without Compliance of Condition
- Status
- Awaiting decision
- Received
- 11 Aug 2026
- Validated
- 12 Aug 2026
- Ward
- Orwell
- Parish
- Tattingstone
- Postcode
- IP9 2NS
Site history
Applications at this address on the Babergh register
This site has had 2 applications since 2026: 1 approved, 0 refused.
-
DC/26/00335 Granted
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
Householder Application - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and instllation of new private treatment plant.
Timeline
Dates from the published record
-
11 Aug 2026
Received by Babergh
-
12 Aug 2026
Validated
Checked as complete and ready for consideration.
-
21 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Babergh took a median of 48 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
DC/26/00335 Granted
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
Householder Application - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and instllation of new private treatment plant.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
- APPLICATION FORM
- EXISTING ELEVATIONS TS001
- PROPOSED ELEVATIONS TS002
- PROPOSED FIRST FLOOR PLAN TS004
- PROPOSED GROUND FLOOR PLANS TS003
- PROPOSED BLOCK PLAN TS005
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Babergh for determination, against a statutory target of eight weeks. Over the last year Babergh decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
Householder Application - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and instllation of new private treatment plant.
Granted Householder Extension 20 docsSmall domestic -
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
Householder Application - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and instllation of new private treatment plant.
Granted Householder Extension 20 docsSmall domestic -
Keepers Farm Cox Hall Road Tattingstone Ipswich Suffolk IP9 2NS
95% historically approved · decision due ~7 Oct
Application under Section 73 of The Town and Country 1990 - Variation of Condition 2 (Approved Plans and Documents) of Planning Permission DC/26/00335 dated: 19/05/2026 - Erection of single storey rear extension, first floor front and side extension, alterations to existing roof and installation of new private treatment plant.
Awaiting decision Conditions Extension 6 docsSmall domestic -
Opp Little Birchwood Hyams Lane Holbrook IP9 2NS
Development by a Statutory Undertaker - Erection of 1 No. 10 pole
Granted 1 doc -
Opp Little Birchwood Hyams Lane Holbrook IP9 2NS
Development by a Statutory Undertaker - Erection of 1 No. 10 pole
Granted 1 doc
Other condition discharge and variation applications
In Babergh
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03458 Granted
Land East Of Old Station Road Mendlesham Suffolk
Discharge of Conditions Application for DC/24/04832 - Condition 26 (Site investigation and post investigation assessment)
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)