Skip to content
PlanIndex Get alerts
Menu

Planning application

Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

Awaiting decision Babergh DC/26/03435 Discharge of Condition(s)

Relates to DC/26/00462

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Conditions Application for DC/26/00462 - Condition 3 (Brickwork Panel) and 4 (Bricks and Mortar Mix)

As published by the council, reference DC/26/03435

Application record

Reference
DC/26/03435
Type
Discharge of Condition(s)
Status
Awaiting decision
Received
10 Aug 2026
Validated
10 Aug 2026
Ward
Long Melford
Parish
Alpheton
Postcode
CO10 9BG

Site history

Applications at this address on the Babergh register

This site has had 3 applications since 2026: 1 approved, 0 refused.

  • DC/26/00461 Awaiting decision

    Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    Householder Application - Minor adaptations to enhance the existing flood mitigation measures which at present are not sufficiently robust. The works involve raising the flood defence walls by 225mm (3 brick courses), installation of removable 4 no. flood gates and removing and blocking up an external door.

    Submitted 4 Feb 2026 Householder
  • DC/26/00462 Granted

    Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    Application for listed building consent - Raising the flood defence walls, installation of removable 4 no. flood gates and removing and blocking up an external door.

    Decided 15 May 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 10 Aug 2026

    Received by Babergh

  2. 15 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Babergh took a median of 48 days over the applications it decided in the last year.

Cases linked to this one on the register

  • DC/26/00462 Granted

    Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    Application for listed building consent - Raising the flood defence walls, installation of removable 4 no. flood gates and removing and blocking up an external door.

    Decided 15 May 2026 Heritage and listed buildings

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Ipswich

25 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

  • DISCHARGE OF CONDITION(S) - APPROVAL Decision · 03 Sep 2026
  • HERITAGE RESPONSE Consultee Comment · 02 Sep 2026
  • APPLICATION FORM Application Form · 10 Aug 2026
  • BRICK SAMPLE PANEL Photo · 10 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Babergh for determination, against a statutory target of eight weeks. Over the last year Babergh decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    DC/26/03435 Submitted 10 Aug 2026 0m away

    95% historically approved · decision due ~5 Oct

    Discharge of Conditions Application for DC/26/00462 - Condition 3 (Brickwork Panel) and 4 (Bricks and Mortar Mix)

    Awaiting decision Conditions 3 docs
  • Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    DC/26/00462 Submitted 4 Feb 2026 0m away

    Application for listed building consent - Raising the flood defence walls, installation of removable 4 no. flood gates and removing and blocking up an external door.

    Granted Heritage and listed buildings 20 docs
  • Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    DC/26/00462 Submitted 4 Feb 2026 0m away

    Application for listed building consent - Raising the flood defence walls, installation of removable 4 no. flood gates and removing and blocking up an external door.

    Granted Heritage and listed buildings 20 docs
  • Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    DC/26/00461 Submitted 4 Feb 2026 1m away

    93% historically approved · decision due ~3 Apr

    Householder Application - Minor adaptations to enhance the existing flood mitigation measures which at present are not sufficiently robust. The works involve raising the flood defence walls by 225mm (3 brick courses), installation of removable 4 no. flood gates and removing and blocking up an external door.

    Awaiting decision Householder 16 docs
    Domestic
  • Alpheton Mill Bridge Street Alpheton Sudbury Suffolk CO10 9BG

    DC/26/00461 Submitted 4 Feb 2026 1m away

    93% historically approved · decision due ~3 Apr

    Householder Application - Minor adaptations to enhance the existing flood mitigation measures which at present are not sufficiently robust. The works involve raising the flood defence walls by 225mm (3 brick courses), installation of removable 4 no. flood gates and removing and blocking up an external door.

    Awaiting decision Householder 16 docs
    Domestic
  • The Mount Bridge Street Long Melford Sudbury Suffolk CO10 9BQ

    DC/26/03120 Submitted 20 Jul 2026 173m away

    95% historically approved · decision due ~15 Sep

    Application under Section 73 of The Town and Country Planning Act 1990 - Variation of Condition 2 (Approved Plans and Documents), Condition 10 (Biodiversity Enhancement Plan) and Condition 11 (Wildlife Lighting Scheme) of Planning Permission DC/22/05880 dated: 31/01/2023 - Conversion of and extension to barn to form 1No dwelling.

    Awaiting decision Conditions Extension 12 docs
    Domestic

In Babergh

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03458 Granted

    Land East Of Old Station Road Mendlesham Suffolk

    Discharge of Conditions Application for DC/24/04832 - Condition 26 (Site investigation and post investigation assessment)

    11 Aug 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions