Hope Barn Stoke Road Thorndon Eye Suffolk IP23 7JG

Granted Babergh DC/26/02372 Full App Without Compliance of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under Section 73 of The Town and Country Planning Act 1990 - Variation of Condition 2 (Approved Plans and Documents) of Reserved Matters Approval DC/24/01969 dated: 31/07/2024 to allow the inclusion of a phasing plan within the approved documents - Appearance, Landscaping, Layout and Scale for the Erection of 4no. dwellings with vehicular access.

As published by the council, reference DC/26/02372

Application record

Reference
DC/26/02372
Type
Full App Without Compliance of Condition
Status
Granted
Decision
Granted
Received
4 Jun 2026
Validated
5 Jun 2026
Decided
17 Jul 2026
Ward
Mendlesham
Parish
Thorndon
Decision by
Delegated Decision
Postcode
IP23 7JG

Site history

Applications at this address on the Babergh register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • DC/26/03011 Granted

    Hope Barn Stoke Road Thorndon Eye Suffolk IP23 7JG

    Application for a Non-Material Amendment to DC/21/06244 - To alter the wording of Condition 11 from: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is commenced details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety. To: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is first occupied details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety.

    Decided 23 Jul 2026 Amendments

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Babergh

  2. 5 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Granted

  4. 24 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: DC/24/01969 (Granted)

Who's behind it

Company information only, from the register and Companies House

Hollins Architects & Surveyors Agent, an architecture practice

197 applications on PlanIndex · across 8 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • VARIATION/REMOVAL OF CONDITION - GRANT Decision · 17 Jul 2026
  • OFFICER DELEGATED REPORT Officer Delegated Report · 17 Jul 2026
  • DEMOLITION AND CONSTRUCTION MANAGEMENT PLAN Report · 02 Jul 2026
  • 2355 200 - CONSTRUCTION MANAGEMENT PLAN Drawing · 02 Jul 2026
  • SCC HIGHWAYS RESPONSE Consultee Comment · 12 Jun 2026
  • INFRASTRUCTURE TEAM RESPONSE Consultee Comment · 09 Jun 2026
  • APPLICATION FORM Application Form · 04 Jun 2026
  • SITE LAYOUT PHASING PLAN 2355 105 Drawing · 04 Jun 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Babergh granted permission on 17 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Hope Barn Stoke Road Thorndon Eye Suffolk IP23 7JG

    DC/26/02372 Submitted 4 Jun 2026 0m away

    Application under Section 73 of The Town and Country Planning Act 1990 - Variation of Condition 2 (Approved Plans and Documents) of Reserved Matters Approval DC/24/01969 dated: 31/07/2024 to allow the inclusion of a phasing plan within the approved documents - Appearance, Landscaping, Layout and Scale for the Erection of 4no. dwellings with vehicular access.

    Granted Conditions 8 docs
    Several homes
  • Hargrave House Stanwell Green Thorndon Eye Suffolk IP23 7JL

    DC/17/04507 Submitted 4 Sep 2017 218m away

    Householder Planning Application - Erection of single storey rear extension and first floor side extension.

    Granted Householder Extension 14 docs
    Small domestic
  • Hargrave House Stanwell Green Thorndon Eye Suffolk IP23 7JL

    DC/17/04507 Submitted 4 Sep 2017 218m away

    Householder Planning Application - Erection of single storey rear extension and first floor side extension.

    Granted Householder Extension 14 docs
    Small domestic
  • Hope Barn Stoke Road Thorndon Eye Suffolk IP23 7JG

    DC/26/03011 Submitted 14 Jul 2026 231m away

    Application for a Non-Material Amendment to DC/21/06244 - To alter the wording of Condition 11 from: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is commenced details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety. To: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is first occupied details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety.

    Granted Amendments 3 docs
  • Hope Barn Stoke Road Thorndon Eye Suffolk IP23 7JG

    DC/26/03011 Submitted 14 Jul 2026 231m away

    Application for a Non-Material Amendment to DC/21/06244 - To alter the wording of Condition 11 from: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is commenced details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety. To: 11. PRIOR TO FIRST OCCUPATION : MANOEUVRING AND PARKING Before the development is first occupied details of the areas to be provided for the loading,unloading, manoeuvring and parking of vehicles including secure cycle storage and electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. Reason: To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles in accordance with Suffolk Guidance for Parking (2019) where on-street parking and manoeuvring would be detrimental to highway safety.

    Granted Amendments 3 docs
  • Land Opposite Clint Cottage Clint Road Thorndon Eye Suffolk IP23 7JF

    DC/17/05198 Submitted 13 Oct 2017 339m away

    Planning Application. Erection of new dwelling and improved vehicular access following removal of barn.

    Granted Full applications New dwelling 18 docs
    Domestic

In Babergh

  • DC/26/02932 Granted

    Rectory Cottage Old Rectory Lane Shimpling Bury St Edmunds Suffolk IP29 4HQ

    Discharge of Conditions Application for DC/24/04287 - Condition 5 (Biodiversity Enhancement Strategy), Condition 8 (Foul Drainage Scheme), Condition 12 (Electric Vehicle Charging), Condition 13 (Refuse Storage Details), Condition 14 (Cycle Storage), Condition 16 (Soft Landscaping Scheme), Condition 18 (Landscape and Ecological Management Plan)

    8 Jul 2026 Conditions
  • DC/26/02619 Granted

    5, 7, 11 And 15-21 (odd) Pightle Grove, Rattlesden, Bury St Edmunds, Suffolk, IP30 0T

    Confirmation of Compliance with Conditions for DC/19/03840 and DC/18/00229

    15 Jun 2026 Conditions
  • DC/26/03967 Awaiting decision

    Unit 9 Crowcroft Road Industrial Estate Nedging With Naughton Ipswich Suffolk IP7 7HR

    Discharge of Conditions Application for DC/26/01829 - Condition 6 (Construction Management Plan)

    11 Sep 2026 Conditions
  • DC/26/03966 Awaiting decision

    Hadleigh High School Highlands Road Hadleigh Ipswich Suffolk IP7 5HU

    Discharge of Conditions Application for DC/26/00385 - Conditions 10 (Biodiversity Enhancement Strategy), 11 (Wildlife Sensitive Lighting Design Scheme), 13 (Hard and Soft landscaping Scheme ), 14 (Landscape Management Plan), 16 (Design Details of The MUGA), 19 (Design Specification of the Sports Hall) and 27 (Parking Details)

    11 Sep 2026 Conditions
  • DC/26/03971 Awaiting decision

    The Homestead The Street Brome And Oakley Eye Suffolk IP23 8AE

    Discharge of Conditions Application for DC/26/00687 - Condition 6 (Biodiversity Enhancement Layout)

    11 Sep 2026 Conditions