Planning application
Progress Power Ltd Potash Lane Eye Suffolk IP23 7HE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of Details reserved by Requirement 22 of The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570).
As published by the council, reference DC/25/04199
Application record
- Reference
- DC/25/04199
- Type
- Discharge of Requirement
- Status
- Granted
- Decision
- Granted
- Received
- 19 Sep 2025
- Validated
- 19 Sep 2025
- Decided
- 27 Nov 2025
- Ward
- Eye
- Decision by
- Delegated Decision
- Postcode
- IP23 7HE
Timeline
Dates from the published record
-
19 Sep 2025
Received by Babergh
-
27 Nov 2025
Decision issued: Granted
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Babergh granted permission on 27 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Progress Power Ltd Potash Lane Eye Suffolk IP23 7HE
Approval of Details reserved by Requirement 22 of The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570).
Granted Conditions 20 docs -
Land Eye Airfield Castleton Way Yaxley Suffolk
Application for a Lawful Development Certificate for a Proposed Use or Development. Town and Country Planning Act 1990 (as amended) - The proposal involves removing a small section of the existing earth bank to create a secure access point, including the installation of two gate posts and a lockable gate. The proposed site measures approximately 200 metres by 25 metres, giving a total area of 5,000 square metres. It would be used for the secure parking of up to 40 empty semi-trailers. The main purpose of the proposal is to reduce unnecessary HGV mileage and the associated environmental impact. Due to the site?s location, up to four trailer movements could be completed locally in the same distance currently required for one return journey to our Stradbroke yard. This would significantly reduce fuel consumption, vehicle emissions, road mileage and the number of HGV movements through local communities. It would also improve operational efficiency while supporting the company?s wider aim of reducing its environmental impact.
Withdrawn Lawful development 1 doc -
Land Eye Airfield Castleton Way Yaxley Suffolk
Application for a Lawful Development Certificate for a Proposed Use or Development. Town and Country Planning Act 1990 (as amended) - The proposal involves removing a small section of the existing earth bank to create a secure access point, including the installation of two gate posts and a lockable gate. The proposed site measures approximately 200 metres by 25 metres, giving a total area of 5,000 square metres. It would be used for the secure parking of up to 40 empty semi-trailers. The main purpose of the proposal is to reduce unnecessary HGV mileage and the associated environmental impact. Due to the site?s location, up to four trailer movements could be completed locally in the same distance currently required for one return journey to our Stradbroke yard. This would significantly reduce fuel consumption, vehicle emissions, road mileage and the number of HGV movements through local communities. It would also improve operational efficiency while supporting the company?s wider aim of reducing its environmental impact.
Withdrawn Lawful development 1 doc -
Diss Compressor Station Langton Green Eye Suffolk IP23 7HL
Development by a Statutory Undertaker - The removal of 3 no. antenna, and the installation of 9 no. replacement antenna and ancillary radio equipment onto new support poles at existing lattice mast and ancillary development thereto.
Granted 4 docs -
Diss Compressor Station Langton Green Eye Suffolk IP23 7HL
Development by a Statutory Undertaker - The removal of 3 no. antenna, and the installation of 9 no. replacement antenna and ancillary radio equipment onto new support poles at existing lattice mast and ancillary development thereto.
Granted 4 docs -
Cranswick House Oaksmere Business Park Eye Airfield Industrial Estate Yaxley Eye Suffolk IP23 8BW
77% historically approved · decision due ~9 Oct
Full Planning Application - Erection of 1No. wind turbine and associated infrastructure (Accompanied by EIA Statment0
Awaiting decision Full applications 21 docs
Other condition discharge and variation applications
In Babergh
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03458 Granted
Land East Of Old Station Road Mendlesham Suffolk
Discharge of Conditions Application for DC/24/04832 - Condition 26 (Site investigation and post investigation assessment)
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)