Planning application
DC/17/04900
Land To The North Of Poplar Lane Sproughton Suffolk
Proposal
Screening Opinion EIA - Erection of 145 dwellings.
As published by the council, reference DC/17/04900
Timeline
Dates from the published record
-
27 Sep 2017
Received by Babergh
-
18 Oct 2017
Decision issued: EIA not required
-
27 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
DC/17/04900 Decided
Land To The North Of Poplar Lane Sproughton Suffolk
Screening Opinion EIA - Erection of 145 dwellings.
-
DC/26/02044 Awaiting decision
Wolsey Grange, Phase 1C, Land North And South Of, Poplar Lane, Sproughton, Suffolk
Application for a Non-Material Amendment relating to DC/20/01058 - Amendment to materials layout to swap Redland rooftiles for like for like alternative.
-
DC/26/02044 Awaiting decision
Wolsey Grange, Phase 1C, Land North And South Of, Poplar Lane, Sproughton, Suffolk
Application for a Non-Material Amendment relating to DC/20/01058 - Amendment to materials layout to swap Redland rooftiles for like for like alternative.
-
DC/26/01304 Granted
Land North And South Of Poplar Lane Sproughton Suffolk
Application for a Non-Material Amendment relating to DC/20/01058 - Relocation of a substation, realignment of pathway and creation of a turning head.
-
DC/26/01304 Granted
Land North And South Of Poplar Lane Sproughton Suffolk
Application for a Non-Material Amendment relating to DC/20/01058 - Relocation of a substation, realignment of pathway and creation of a turning head.
-
DC/26/02517 Awaiting decision
Land North Of The A1071 Ipswich (Wolsey Grange)
Application for Approval of Reserved Matters pursuant to Outline Planning Permission DC/21/02671 dated: 12.09.2023, (Up to 750 dwellings) for the Access, Appearance, Layout and Scale of the site wide infrastructure, drainage, attenuation, levels, earthworks, ancillary works.
Other outline applications
In Babergh
-
DC/25/03824 Granted
Kelryan House Red House Lane Great Cornard Sudbury Suffolk CO10 0JB
Application for Outline Planning Permission (Access points to be considered, all other matters reserved) Town and Country Planning Act 1990 (as amended) - for the erection of up to 4 No Single Storey Dwellings including a New Private Access Drive from Red House Lane
-
DC/26/02750 Decided
Hadleigh Road Holton St Mary Part In The Parishes Of East Bergholt And Raydon Suffolk
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Alterations to A12 merge road with B1070, construction of haul road, access points, attenuation ponds, drainage and construction compound. Removal of vegetation, street furniture and signage. All as "Early Enabling Works" for the proposed Norwich to Tilbury NSIP development.
-
DC/26/02749 Decided
Land South Of Old Bury Road Wortham Suffolk
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - Construction of a Main Works Compound (RG-Main) including vegetation removal and construction works associated with the existing bellmouth, referred to as the "Early Enabling Works" (EEW).
-
DC/26/01910 Decided
Land Near Bramford Substation Bullen Lane Bramford IP8 4JL
Request for Environmental Impact Assessment (EIA) Scoping Opinion - Construction and operation of a battery energy storage system (BESS) and associated works (Cross-boundary application - Mid Suffolk District Council)
-
DC/26/01983 Decided
Land Near Bramford Substation Bullen Lane Bramford IP8 4JL
Request for Environmental Impact Assessment (EIA) Scoping Opinion - Construction and operation of a battery energy storage system (BESS) and associated works (Cross-boundary application - Babergh District Council)