Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands immediately opposite and south of 11 Mossvale Road, Dromore, BT25 1DG extending to lands immediately adjacent and northwest of No’s 5 and 7 Primrose Hill, BT25 1FA

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0945/F Full

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 10 no apartments, provision of landscaped area and associated site works (amended scheme to existing planning approval LA08/2024/0337/F).

As published by the council, reference LA08/2026/0945/F

Application record

Reference
LA08/2026/0945/F
Type
Full
Status
Valid
Received
27 Aug 2026
Validated
8 Sep 2026
Ward
Dromore (Armagh,Banbridge & Craigavon)
Postcode
BT25 1DG

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 8 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

P J Design Agent, a design practice

28 applications on PlanIndex · across 8 councils · 86% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided full applications in a median of 120 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Armagh City, Banbridge and Craigavon

  • 1 Ballynafern Road, Banbridge, BT32 5AE

    Proposed re-roofing of thatched roof with slate

    26 Aug 2025 Full applications
  • 236 Banbridge Road, Lawrencetown, BT63 6DW

    Conversion and reconfiguration of lawful existing ground floor retail unit (sale of fireplaces, stoves and associated accessories) to provide extension to existing dwelling and demolition of lawful retail buildings (sale of fireplaces, stoves and associated accessories) and separate brick shed. Conversion, reconfiguration and extension to existing building to accommodate the relocation of existing and proposed lawful retail floorspace for the sale of fireplaces, stoves and associated accessories and provision of ancillary storage, car parking, landscaping and all associated site works’.

    9 May 2025 Full applications
  • Lands within the grounds of Clady GAC, 65 Clady Road, Mowhan, Armagh, BT60 2HA

    Erection of changing pavilion incorporating 2 team changing rooms plus accessible changing, meeting room and gym/multi-activity area (existing changing pavilion & storage room to be retained), erection of new entrance wall and gates and associated site works (in substitution for planning approval reference no LA08/2022/1238/F)

    19 Feb 2026 Full applications
  • 5 Drummiller Lane, Craigavon, BT63 6BR

    Partial demolition of existing single-storey front block, rebuilding with reduced floor area, and associated alterations to the existing property.

    13 Mar 2026 Full applications
  • 25 metres SE of entrance/exit to Tesco Extra building, Tesco Extra, Bridgewater Retail Park, Banbridge, BT32 4LF

    Erection of Timpson pod (for dry cleaning, shoe repair, key cutting, jewellery repairs, watch repairs, engraving, etc. Dry cleaning will not be undertaken within the kiosk, items to be cleaned would be dropped off and collected at the kiosk) with steps for access and provision of 15 No 1m high bollards for protection and a pedestrian crossing and tactile pavement.

    5 May 2026 Full applications