Planning application

71 Ravenswood, Banbridge, BT32 3RD

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0790/F Full

Works: Loft or dormer Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed roofspace conversion with provision of rear dormer to additional en-suite bedroom, and alterations to dwelling

As published by the council, reference LA08/2026/0790/F

Application record

Reference
LA08/2026/0790/F
Type
Full
Status
Consultation Open
Received
20 Jul 2026
Validated
6 Aug 2026
Ward
Banbridge West
Postcode
BT32 3RD

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 118 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided full applications in a median of 140 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Carousel House Unit 9 Scarva Road Industrial Estate Banbridge BT32 3QD

    LA08/2022/1436/F Submitted 13 Oct 2022 300 yards away

    Proposed extension and alterations to provide additional warehousing, offices and ancillary space and change of use from warehousing to canteen with associated works to carparking area and circulation space

    Granted Full applications Extension 15 docs
  • Former Brookfields Factory Site located circa 90m North West of No.14 Brookfield Meadows, Banbridge, Co. Down, BT32 3FR

    LA08/2023/1845/DC Submitted 21 Feb 2023 350 yards away

    Discharge of Conditions number 8 & 13: of Planning Approval LA08/2019/1396/F. Summary of condition requirements: Prior to the occupation of any dwelling hereby permitted, the applicant shall submit and agree in writing with the Planning Authority a verification report confirming that all works were completed in accordance remediation works specified in section 5 of the Foyle Consulting Engineers assessment. This shall include suitable photographic and documentary evidence and as built plans showing the specific elements of the remediation scheme. Reason: For the protection of the health of future occupiers of the proposed development. After completing the remediation works under Condition 8 and prior to occupation of the development, a Verification Report needs to be submitted in writing and agreed with Planning Authority. This report should be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11) and/or the Land Contamination: Risk Management (LCRM) guidance, as applicable. The Verification Report should present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Granted Conditions 14 docs
    Domestic
  • Lands approximately 12 metres east of No.19a Scarva Road Industrial Estate, 20 metres north of No. 19 Scarva Road Industrial Estate and 22 metres west of No. 20 Scarva Road Industrial Estate, Banbridge, BT32 3QD

    LA08/2024/1111/F Submitted 25 Sep 2024 400 yards away

    Proposed construction of new roadside parking bays

    Granted Full applications 14 docs
  • 43 Grove Hill, Banbridge, BT32 3GH

    LA08/2025/1255/F Submitted 8 Oct 2025 0.3 miles away

    Conversion of attached garage to living accommodation and replacement of garage door with a window

    Granted Full applications Windows or glazing 10 docs

In Armagh City, Banbridge and Craigavon

  • LA08/2026/0316/F Withdrawn

    Lands immediately adjacent to and east of No.89 Blackskull Road, Dromore, BT25 1JN

    Erection of 2 no. dwellings with attached garages and associated site works.

    Received 23 Mar, published by the council 29 Jul 2026 Full applications
  • 198 Lurgan Road, Gamblestown, Dromore, BT25 1HL

    Extension to curtilage of dwelling, extension and alterations to rear of dwelling to include larger kitchen/dining area, and home office, erection of external raised terrace area and external steps, erection of replacement outbuilding to provide domestic games room, gym, W.C and storage area, and re-grading of ground levels to rear of outbuilding.

    Received 20 Feb, published by the council 7 Aug 2026 Full applications
  • 3 Mellifont Park, Armagh, BT61 9HS

    Proposed single storey side extension

    Received 20 Aug, published by the council 2 Sep 2026 Full applications
  • Immediately adjacent and north of Mountnorris Primary School 7 Main Street, Mountnorris, Armagh, BT60 2TR

    Demolition of existing single storey traditional build garage to be replaced with pre-fabricated double modular classroom and general store. Works also include: retaining wall, alterations to existing pedestrian fencing, new pedestrian fencing and bitmac footpath.

    Received 8 Jul, published by the council 7 Aug 2026 Full applications
  • Cormeen Community Hall, Tullycallidy Road, Armagh, BT60 4NE

    Two-storey extension to existing community hall to provide a music room, gymnasium, access stair, lift and associated external works and service connections (amended plans and additional information received)

    Received 7 Jul, published by the council 7 Aug 2026 Full applications