Skip to content
PlanIndex Get alerts
Menu

Planning application

71 Ravenswood, Banbridge, BT32 3RD

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0790/F Full

Works: Loft or dormer Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed roofspace conversion with provision of rear dormer to additional en-suite bedroom, and alterations to dwelling

As published by the council, reference LA08/2026/0790/F

Application record

Reference
LA08/2026/0790/F
Type
Full
Status
Consultation Open
Received
20 Jul 2026
Validated
6 Aug 2026
Ward
Banbridge West
Postcode
BT32 3RD

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Armagh City, Banbridge and Craigavon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Carousel House Unit 9 Scarva Road Industrial Estate Banbridge BT32 3QD

    LA08/2022/1436/F Submitted 13 Oct 2022 264m away

    Proposed extension and alterations to provide additional warehousing, offices and ancillary space and change of use from warehousing to canteen with associated works to carparking area and circulation space

    Granted Full applications Extension 15 docs
  • Former Brookfields Factory Site located circa 90m North West of No.14 Brookfield Meadows, Banbridge, Co. Down, BT32 3FR

    LA08/2023/1845/DC Submitted 21 Feb 2023 316m away

    Discharge of Conditions number 8 & 13: of Planning Approval LA08/2019/1396/F. Summary of condition requirements: Prior to the occupation of any dwelling hereby permitted, the applicant shall submit and agree in writing with the Planning Authority a verification report confirming that all works were completed in accordance remediation works specified in section 5 of the Foyle Consulting Engineers assessment. This shall include suitable photographic and documentary evidence and as built plans showing the specific elements of the remediation scheme. Reason: For the protection of the health of future occupiers of the proposed development. After completing the remediation works under Condition 8 and prior to occupation of the development, a Verification Report needs to be submitted in writing and agreed with Planning Authority. This report should be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11) and/or the Land Contamination: Risk Management (LCRM) guidance, as applicable. The Verification Report should present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Decided Conditions 14 docs
    Domestic
  • 43 Grove Hill, Banbridge, BT32 3GH

    LA08/2025/1255/F Submitted 8 Oct 2025 499m away

    Conversion of attached garage to living accommodation and replacement of garage door with a window

    Granted Full applications Windows or glazing 10 docs

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications