Skip to content
PlanIndex Get alerts
Menu

Planning application

Outbuilding and lands located approximately 45 metres west of 60 Lagan Road, Keady, Armagh, BT60 3ES

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0697/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to and conversion of barn to 3 no. dwellings, and associated site works

As published by the council, reference LA08/2026/0697/F

Application record

Reference
LA08/2026/0697/F
Type
Full
Status
Consultation Open
Received
16 Jun 2026
Validated
16 Jun 2026
Ward
Keady
Postcode
BT60 3ES

Timeline

Dates from the published record

  1. 16 Jun 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 11 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

B.O'Reilly Architecture Agent, an architecture practice

9 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided full applications in a median of 120 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Lands opposite and 20 metres north of 57 Lagan Road Keady Co Armagh BT60 3ES

    LA08/2024/1115/DC Submitted 25 Sep 2024 407m away

    Discharge of conditions 3 & 4 of LA08/2023/3106/F: 3. The existing trees and hedging along the boundaries of the site, as indicated for retention on Drawing No. 02A, shall be permanently retained intact and no lopping, topping felling or removal shall be carried out without the prior written approval of the Council. Reason: To ensure the development integrates into the countryside and to ensure the maintenance of screening to the site. 4. If any retained hedgerow or shrub, is uprooted or destroyed or dies within 5 years from the date of completion of the development, it shall be replaced within the next planting season with others of a similar size and species unless the Council gives written consent to any variation. Reason: To ensure the development integrates into the countryside and to ensure the maintenance of screening to the site.

    Granted Conditions Trees 4 docs
  • Lands Adjacent & 40m South of No.49 Lagan Road, Lagan, Keady, Armagh BT60 3ES.

    LA08/2024/0870/RM Submitted 1 Aug 2024 409m away

    Erection of Dwelling

    Granted Reserved matters New dwelling 17 docs
    Domestic
  • 49 Lagan Road, Keady, Armagh, BT60 3ES

    LA08/2026/0420/F Submitted 20 Apr 2026 454m away

    Alteration, renovation and extension to existing fire damaged dwelling

    Granted Full applications Extension 12 docs
    Domestic
  • Lands 60m South East Of 35 Derrynoose Road, Keady, Co. Armagh, BT60 3ET

    LA08/2025/0969/RM Submitted 4 Aug 2025 482m away

    Erection of replacement single storey dwelling

    Granted Reserved matters 12 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • 1 Ballynafern Road, Banbridge, BT32 5AE

    Proposed re-roofing of thatched roof with slate

    Received 26 Aug, published by the council 29 Jul 2026 Full applications
  • 236 Banbridge Road, Lawrencetown, BT63 6DW

    Conversion and reconfiguration of lawful existing ground floor retail unit (sale of fireplaces, stoves and associated accessories) to provide extension to existing dwelling and demolition of lawful retail buildings (sale of fireplaces, stoves and associated accessories) and separate brick shed. Conversion, reconfiguration and extension to existing building to accommodate the relocation of existing and proposed lawful retail floorspace for the sale of fireplaces, stoves and associated accessories and provision of ancillary storage, car parking, landscaping and all associated site works’.

    Received 9 May, published by the council 7 Aug 2026 Full applications
  • Lands within the grounds of Clady GAC, 65 Clady Road, Mowhan, Armagh, BT60 2HA

    Erection of changing pavilion incorporating 2 team changing rooms plus accessible changing, meeting room and gym/multi-activity area (existing changing pavilion & storage room to be retained), erection of new entrance wall and gates and associated site works (in substitution for planning approval reference no LA08/2022/1238/F)

    Received 19 Feb, published by the council 29 Jul 2026 Full applications
  • 5 Drummiller Lane, Craigavon, BT63 6BR

    Partial demolition of existing single-storey front block, rebuilding with reduced floor area, and associated alterations to the existing property.

    Received 13 Mar, published by the council 29 Jul 2026 Full applications
  • 25 metres SE of entrance/exit to Tesco Extra building, Tesco Extra, Bridgewater Retail Park, Banbridge, BT32 4LF

    Erection of Timpson pod (for dry cleaning, shoe repair, key cutting, jewellery repairs, watch repairs, engraving, etc. Dry cleaning will not be undertaken within the kiosk, items to be cleaned would be dropped off and collected at the kiosk) with steps for access and provision of 15 No 1m high bollards for protection and a pedestrian crossing and tactile pavement.

    Received 5 May, published by the council 29 Jul 2026 Full applications