Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands to the South East of Silverwood Avenue (under construction), South West of Nos.10, 12, 14 and 16 Ellington Avenue, West of Nos.26, 28, 32 and 34 Headington Manor, South of Nos.36, 38, 40, 42 and 45 Headington Manor, and North of Belfast-Dublin Railway Line, Lurgan

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0139/F Full

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of residential development comprising 78No. dwellings (38No. Detached and 40No. Semi-Detached), 74 No. detached garages, solar panels and associated site works to include infrastructure, public open space, landscaping and a play park.

As published by the council, reference LA08/2026/0139/F

Application record

Reference
LA08/2026/0139/F
Type
Full
Status
Consultation Open
Received
5 Feb 2026
Validated
3 Mar 2026
Ward
Lough Road

Timeline

Dates from the published record

  1. 5 Feb 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 3 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Tetra Tech Consulting (NI) Ltd Agent, registered in Belfast

Active · incorporated 2020 · Belfast

43 applications on PlanIndex · across 7 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

77 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided full applications in a median of 120 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 34 Headington Manor Lurgan BT66 6TQ

    LA08/2022/1034/F Submitted 5 Aug 2022 76m away

    Proposed single storey rear extension to dwelling to provide ground floor bedroom and wet room with link lobby to existing kitchen.

    Granted Full applications Extension 26 docs
    Small domestic
  • Lands 100m East of 25 and 27 Silverwood Road, Lurgan, BT66 6NA

    LA08/2024/1194/DC Submitted 11 Oct 2024 175m away

    Proposed discharge of Condition No. 18 of LA08/2019/1133/F which states: " Prior to the commencement of any works on site final details of the method of sewage disposal shall be submitted to and agreed in writing by the Council and any mitigation measures contained therein shall be implemented prior to the occupation of any part of the development hereby approved."

    Withdrawn Conditions 4 docs
  • Lands 100M East of 25 and 27 Silverwood Road, Lurgan, BT66 6NA

    LA08/2024/1200/DC Submitted 11 Oct 2024 175m away

    Proposed discharge of Condition No. 4 of LA08/2019/1133/F which states: "The construction of the development approved herein shall not commence until a final hard and soft landscape and open space management and maintenance plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules of all areas of landscaping and open space as shown on drawing number 38. It shall also set out details of the arrangements that will be put in place for the future management and maintenance in perpetuity of these areas, including details of the legal agreement, between the prospective residents and Management Company, which are to be put in place as per policy OS 2 of PPS 8. The landscape and open space management plan shall be carried out as approved."

    Withdrawn Conditions 5 docs
  • Approx. 64 metres north east of 48 Silverwood Avenue Lurgan, Craigavon, BT66 6FL

    LA08/2025/1404/F Submitted 7 Nov 2025 180m away

    Erection of 2 storey dwelling and garage (change of house type on site 28 to include single storey sunroom to rear of semi detached unit and associated works as approved under reference number LA08/2024/1290/F)

    Granted Full applications 10 docs
    Small domestic
  • Lands 100m East Of 25 and 27 Silverwood Road, Lurgan

    LA08/2024/1195/DC Submitted 11 Oct 2024 210m away

    Proposed discharge of Condition No. 17 of LA08/2019/1133/F which states: "A final Drainage Assessment shall be submitted to and approved in writing by the Council prior to the commencement of any works on site and any mitigation measures contained therein shall be implemented prior to the occupation of any part of the development hereby approved. Reason: To ensure adequate measures will be put in place so as to effectively mitigate against any flood.”

    Withdrawn Conditions 4 docs
  • 10 Beaumont Square Lurgan BT66 6EF

    LA08/2022/1310/F Submitted 25 Oct 2022 226m away

    Single storey rear extension.

    Granted Full applications Extension 11 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • 1 Ballynafern Road, Banbridge, BT32 5AE

    Proposed re-roofing of thatched roof with slate

    Received 26 Aug, published by the council 29 Jul 2026 Full applications
  • 236 Banbridge Road, Lawrencetown, BT63 6DW

    Conversion and reconfiguration of lawful existing ground floor retail unit (sale of fireplaces, stoves and associated accessories) to provide extension to existing dwelling and demolition of lawful retail buildings (sale of fireplaces, stoves and associated accessories) and separate brick shed. Conversion, reconfiguration and extension to existing building to accommodate the relocation of existing and proposed lawful retail floorspace for the sale of fireplaces, stoves and associated accessories and provision of ancillary storage, car parking, landscaping and all associated site works’.

    Received 9 May, published by the council 7 Aug 2026 Full applications
  • Lands within the grounds of Clady GAC, 65 Clady Road, Mowhan, Armagh, BT60 2HA

    Erection of changing pavilion incorporating 2 team changing rooms plus accessible changing, meeting room and gym/multi-activity area (existing changing pavilion & storage room to be retained), erection of new entrance wall and gates and associated site works (in substitution for planning approval reference no LA08/2022/1238/F)

    Received 19 Feb, published by the council 29 Jul 2026 Full applications
  • 5 Drummiller Lane, Craigavon, BT63 6BR

    Partial demolition of existing single-storey front block, rebuilding with reduced floor area, and associated alterations to the existing property.

    Received 13 Mar, published by the council 29 Jul 2026 Full applications
  • 25 metres SE of entrance/exit to Tesco Extra building, Tesco Extra, Bridgewater Retail Park, Banbridge, BT32 4LF

    Erection of Timpson pod (for dry cleaning, shoe repair, key cutting, jewellery repairs, watch repairs, engraving, etc. Dry cleaning will not be undertaken within the kiosk, items to be cleaned would be dropped off and collected at the kiosk) with steps for access and provision of 15 No 1m high bollards for protection and a pedestrian crossing and tactile pavement.

    Received 5 May, published by the council 29 Jul 2026 Full applications