Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Main Street, Donaghcloney, BT66 7NL

Granted Armagh City, Banbridge and Craigavon LA08/2025/0936/LBC Listed Building Consent

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Repairs to existing timber sliding sash windows to front elevation including replacement of existing single glazing with new Slimline heritage 12mm double glazed units (amended description and drawings)

As published by the council, reference LA08/2025/0936/LBC

Application record

Reference
LA08/2025/0936/LBC
Type
Listed Building Consent
Status
Determined
Decision
Granted
Received
31 Jul 2025
Validated
7 Aug 2025
Decided
22 May 2026
Ward
Donaghcloney
Postcode
BT66 7NL

Timeline

Dates from the published record

  1. 31 Jul 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 7 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 May 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Robin Magee Architect Agent, an architecture practice

13 applications on PlanIndex · across 6 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 22 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 19m East of No. 5 Main Street, Donaghcloney, (Lisnasure and Main Street junction)

    LA08/2024/0889/F Submitted 5 Aug 2024 350 yards away

    Installation of Northern Ireland Centennial Stone

    Granted Full applications 12 docs
  • 7 and 9 Main Street, Donaghcloney, Craigavon, BT66 7LR

    LA08/2026/0309/F Submitted 20 Mar 2026 350 yards away

    98% historically approved · decision due ~29 May

    Demolition of existing dwelling (7 Main Street), extension to curtilage of Donaghcloney Spar premises (9 Main Street), alterations and extension to its existing car park, erection of fencing, 2no. lighting columns and associated site works

    Awaiting decision Full applications Extension Demolition 16 docs
    Domestic
  • 20 Winona Lodge, Donaghcloney, Craigavon, BT66 7GE

    LA08/2024/0532/F Submitted 8 May 2024 350 yards away

    Part change of use of dwelling to increase the existing Childminders Registration with Health & Social Services, from the permitted child minding limit of 6 children to 8 children, in accordance with Annex A (A3) of PPS4.

    Granted Full applications 13 docs
    Domestic

In Armagh City, Banbridge and Craigavon

  • LA08/2026/1052/LBC Awaiting decision

    23 Moyallan Road, Ballymacanallen, Portadown, Craigavon BT63 5JX

    Demolition of single storey rear extension and replacement with two storey rear extension to include ground floor kitchen extension and first floor dressing room, and associated siteworks.

    Received 25 Sep, published by the council 12 Oct 2026 Heritage and listed buildings
  • 4 Drumnavaddy Road, Dromore, BT25 1JT

    Change of use of existing school house to a dwelling to include alterations and extension of existing building.

    Received 14 Apr, published by the council 29 Jul 2026 Heritage and listed buildings
  • LA08/2026/1015/LBC Awaiting decision

    41 Lower Lisdrumchor Road, Glenanne, Armagh, BT60 2HT

    Proposed single storey extension to the side of an existing Grade B1 listed building with site works and associated landscaping.

    Received 14 Sep, published by the council 28 Sep 2026 Heritage and listed buildings
  • Tdi House 90 Market Street, Tandragee, Craigavon, BT62 2BW

    Erection of 2 no. shop signs (replacing existing signage)

    Received 29 Jan, published by the council 29 Jul 2026 Heritage and listed buildings
  • LA08/2026/0675/LBC Withdrawn

    Danske Bank 74-76 Scotch Street, Armagh, BT61 7DH

    External redecoration works and essential repairs to chimney render and roof covering. Replacement of timber single glazed sliding sash fittings with new security glazed and safety glazed pre-finished hardwood double glazed sliding sash fittings.

    Received 23 Jun, published by the council 29 Jul 2026 Heritage and listed buildings