Planning application
Adjacent And North Of No.11 Woodville Gate And Nos. 1, 3, 5, 7, 9, 11, 13, 15, 17 & 19 Woodville Elms, Adjacent And North East Of No.28 Blair Drive, Adjacent And South West Of Nos. 25, 27, 29 And 31 Woodville Elms, Lurgan
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection Of 29No. Dwellings (15no. Detached And 14no. Semi-Detached) And Associated Site Works, Infrastructure, Public Open Space And Landscaping, With Access From Woodville Elms And Woodville Gate, Lurgan
As published by the council, reference LA08/2025/0718/F
Application record
- Reference
- LA08/2025/0718/F
- Type
- Full
- Status
- Consultation Open
- Received
- 11 Jun 2025
- Validated
- 17 Jun 2025
- Ward
- Lough Road
Timeline
Dates from the published record
-
11 Jun 2025
Received by Armagh City, Banbridge and Craigavon
-
17 Jun 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Armagh City, Banbridge and Craigavon took a median of 118 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Tetra Tech Consulting (NI) Ltd Agent, registered in Belfast
Active · incorporated 2020 · Belfast
48 applications on PlanIndex · across 8 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
68 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided full applications in a median of 140 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site 95metres North of No.1 Woodville Elms, Lurgan with access located between No 11 and No 13 Woodville Elms Lurgan.
97% historically approved · decision due ~25 Aug
Erection of Two Storey Dwelling and associated Site Works,
Awaiting decision Full applications 21 docsDomestic -
Adjacent And North Of No.19 Woodville Glen, Nos.1, 2, 3, 4 & 6 Woodville Mews, Nos.7, 9, 11 & 12 Gosselin Avenue, Nos. 23 & 28 Blair Drive, Adjacent And North And East Of Lurgan College Sports Complex; Circa 10metres North Of Nos.5&7 Woodville Glen; Circa 90metres South West Of Annesborough House, Lough Road, Lurgan
97% historically approved · decision due ~29 Jul
Erection of 37No. Dwellings (31No. Detached And 6No. Semi-Detached) and Associated Site Works, Infrastructure, Public Open Space And Landscaping, With Access From Woodville Glen, Lurgan
Awaiting decision Full applications 67 docsMajor scheme -
Site opposite and 15 metres north-north-east of 7 Woodville Glen, Lurgan, BT66 6WG (with access via Woodville Glen)
Proposed Discharge of Conditions No.5, 10, 11 & 12 of Planning Approval LA08/2023/3150/F Condition No. 5 states: A final Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Council prior to the commencement of any works hereby approved, and shall be implemented in accordance with the timescale and details set out therein. This shall include all the mitigation and avoidance measures to be employed as outlined in the Outline Construction Environment Management Plan (OCEMP) dated June 2020 submitted under planning application LA08/2020/0003/O. It shall also incorporate a Construction Method Statement (CMS) and detailed drawings for the instream works required to connect the proposed development's stormwater drainage system to the watercourses. The CMS for instream works should identify the perceived risks to the aquatic environment and potential pollution pathways, and provide details of mitigation measures to be undertaken to minimise the risks to the aquatic environment. Reason: To ensure effective avoidance and mitigation measures for the protection of the environment. Condition No. 10 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist and submitted to and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site; Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Condition No. 11 states: No site works of any nature or development shall take place other than in accordance with the programme of archaeological work approved under condition 10 above. Reason: To ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Condition No. 12 states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Reason: To ensure that the results of archaeological works are appropriately analysed and disseminated and the excavation archive is prepared to a suitable standard for deposition.
Granted Conditions 10 docs -
Site opposite and 15 metres north-north-east of 7 Woodville Glen, Lurgan, BT66 6WG (with access via Woodville Glen)
Proposed discharge of Condition No.14 of Planning Approval LA08/2023/3150/F. Condition No. 14 states: NIW public sewer/s traverse the proposed development site. No construction to be made, trees planted or other obstruction permitted over this sewer, or within the permitted wayleave width. Details of which can be found within NIW guidance notes, available at the link below. A diversion may be necessary. No development shall commence until the applicant has demonstrated to the satisfaction of the council, that NIW are content that the proposed development will not affect this sewer, and sufficient drawings have been submitted, which clearly indicate the required wayleaves. The applicant is advised to obtain a records map from NIW and establish the exact location of the infrastructure within the site, and how it may affect the proposal. Further Consultation with NIW Developer Services [email protected] is required at an early design stage. Further information, guidance notes and applications can be downloaded from NIW website at https://www.niwater.com/services-fordevelopers/homeowners/closeproximity/sewer/. Reason: To prevent disturbance / damage to existing sewers and in the interest of public safety.
Granted Conditions Trees 10 docs -
Site opposite and 10m north of No. 7 Woodville Glen, Lurgan, BT66 6WG
Proposed discharge of Conditions Nos. 5, 10, 11 & 12 of Planning approval LA08/2023/2866/F. Condition No. 5 states: A final Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Council prior to the commencement of any works hereby approved, and shall be implemented in accordance with the timescale and details set out therein. This shall include all the mitigation and avoidance measures to be employed as outlined in the Outline Construction Environment Management Plan (OCEMP) dated June 2020 submitted under planning application LA08/2020/0003/O. It shall also incorporate a Construction Method Statement (CMS) and detailed drawings for the instream works required to connect the proposed development's stormwater drainage system to the watercourses. The CMS for instream works should identify the perceived risks to the aquatic environment and potential pollution pathways, and provide details of mitigation measures to be undertaken to minimise the risks to the aquatic environment. Reason: To ensure effective avoidance and mitigation measures for the protection of the environment Condiiton No. 10 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist and submitted to and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site; Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Condition No.11 states: No site works of any nature or development shall take place other than in accordance with the programme of archaeological work approved under condition 10 above. Reason: To ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Condition No. 12 states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Reason: To ensure that the results of archaeological works are appropriately analysed and disseminated and the excavation archive is prepared to a suitable standard for deposition.
Granted Conditions 10 docs -
9 Deerings Glen, Lurgan, Craigavon, BT67 9GF
Proposed single storey rear & side extension to dwelling.
Withdrawn Full applications Extension 13 docsSmall domestic
Other full applications
In Armagh City, Banbridge and Craigavon
-
LA08/2026/0316/F Withdrawn
Lands immediately adjacent to and east of No.89 Blackskull Road, Dromore, BT25 1JN
Erection of 2 no. dwellings with attached garages and associated site works.
-
LA08/2025/0221/F Granted
198 Lurgan Road, Gamblestown, Dromore, BT25 1HL
Extension to curtilage of dwelling, extension and alterations to rear of dwelling to include larger kitchen/dining area, and home office, erection of external raised terrace area and external steps, erection of replacement outbuilding to provide domestic games room, gym, W.C and storage area, and re-grading of ground levels to rear of outbuilding.
-
LA08/2026/0908/F Granted
3 Mellifont Park, Armagh, BT61 9HS
Proposed single storey side extension
-
LA08/2025/0903/F Granted
Immediately adjacent and north of Mountnorris Primary School 7 Main Street, Mountnorris, Armagh, BT60 2TR
Demolition of existing single storey traditional build garage to be replaced with pre-fabricated double modular classroom and general store. Works also include: retaining wall, alterations to existing pedestrian fencing, new pedestrian fencing and bitmac footpath.
-
LA08/2025/0820/F Granted
Cormeen Community Hall, Tullycallidy Road, Armagh, BT60 4NE
Two-storey extension to existing community hall to provide a music room, gymnasium, access stair, lift and associated external works and service connections (amended plans and additional information received)