Planning application
Adjacent and SE of 11 Derryvore Lane, Craigavon, BT63 5RS
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dwelling and associated site works
As published by the council, reference LA08/2024/1169/RM
Application record
- Reference
- LA08/2024/1169/RM
- Type
- Reserved Matters
- Status
- Determined
- Decision
- Granted
- Received
- 4 Oct 2024
- Validated
- 15 Oct 2024
- Decided
- 20 Dec 2024
- Ward
- Craigavon Centre
- Postcode
- BT63 5RS
Timeline
Dates from the published record
-
4 Oct 2024
Received by Armagh City, Banbridge and Craigavon
-
15 Oct 2024
Validated
Checked as complete and ready for consideration.
-
20 Dec 2024
Decision issued: Granted
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Armagh
78 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Armagh City, Banbridge and Craigavon granted permission on 20 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
11 Derryvore Lane, Portadown, Craigavon, BT63 5RS
Erection of replacement dwelling, garage and associated site works
Granted Full applications 16 docsDomestic -
Prentice BMW, 38 Seagoe Industrial Area, Craigavon, BT63 5QD
Single Storey Storage Extension to BMW Garage and Showroom
Granted Full applications Extension 10 docsSmall domestic -
Land at Moypark The Food Park 39 Seagoe Industrial Area Portadown BT63 5QE
Proposed Discharge of Condition 5 on Application LA08/2020/0836/F. Condition 5 states - After completing any remediation works required under Condition 5 and prior to operation of the development, a verification report needs to be submitted in writing and agreed with Planning Authority. This report should be completed by competent persons in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contaminationhow- to-manage-the-risks. The verification report should present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all waste materials and risks and in achieving the remedial objectives.
Decided Conditions 13 docs -
Land at Moypark The Food Park 39 Seagoe Industrial Area Portadown BT63 5QE
Proposed Discharge of Condition 3 on Application LA08/2020/0836/F. Condition states - The applicant on completion of the agreed remediation works referred to in the Phase II investigation report submitted as part of this application, shall provide to Armagh City, Banbridge and Craigavon Borough Council, for approval prior to the operation of the development, a verification report confirming that all works were completed in accordance with the agreed details and demonstrates the effectiveness of the remediation carried out in managing the identified risks. This should include suitable photographic and documentary evidence and as built plans showing the specific elements of the remediation scheme.
Decided Conditions 17 docs -
Site at no.26 Seagoe Industrial Area and nos.7 - 9 Seagoe Industrial Area, Portadown BT63 5QD
Change of use from existing warehouse (B4) at no.26 Seagoe Industrial Area to offices (A2) including relocation of existing staff and abandonment of the current office use of existing premises at no.7 - 9 Seagoe Industrial Area; retention of existing parking at nos.7 - 9 for use by proposed office accommodation
Granted Full applications 16 docs -
Northern Ireland Electricity Plc, Northern Ireland Electricity, 4 Annagh Drive, Craigavon, BT63 5QJ
Discharge of Condition No. 3 of LA08/2023/3029/F. Condition 3 was previously discharged (LA08/2024/1432/DC) The development hereby permitted shall not commence until either suitably informed risk assessments produced in accordance with LCRM guidance and/or a detailed remediation strategy for the underground fuel storage tank(s) and fuel dispensing infrastructure has been provided. The remediation strategy must be in line with current Guidance for Pollution prevention (GPP 2 and GPP 27) and the Pollution Prevention Guidance (PPG27). This strategy must be submitted in writing and agreed with the Planning Authority and should identify all the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors and human health to ensure the site is suitable for use. However the Contractor has proposed an alternative solution to the removal of the underground fuel tanks. Instead of removing the underground fuel tanks, as previously advised, the specialist subcontractor (Baltor Systems) has proposed the following alternative methodology: Diesel tank Decommissioning Draining of the existing suction lines, degassing and disconnection from the diesel pump. Disconnection of all mains cables from the 2No. Old Pumps and Fuel Management System, removal and disposal of same to facilitate the demolition of the old pump house. Removal of all pipework from the underground diesel tank and removal of tank lid to give access for cleaning and concrete foaming. Removal of all fuel residues and sludge from the underground tank, thoroughly washing same with vacuum tanker and degassing in preparation for concrete foaming. Darafil Concrete Foam Filling of tank (assumed to be 16,000 litres) with concrete foam, overflowing same into the manhole void and issuing a decommissioning certificate. Our Environmental Consultant's comments are as follows: From: Cove Environmental Consulting With regards to this issue, the retaining of the tanks on site – subject to the correct decommissioning works – would be an acceptable alternative to the removal of the tank. The remedial design report noted the tanks would be removed however the key element is the testing around and below the level of the tank itself, so if this is still carried out then we can validate the remediation of the tank – i.e. we will be able to show that there is no contamination present in the ground immediately around / below the tank and the source of any future contamination (the tank) has been dealt with. This can all be outlined in the validation report after the works are complete. If the intention is to retain the tank, then we would recommend that sampling is undertaken both before and after the decommissioning work – the “before” round will confirm that no contamination is present (as if it is then the tank may actually have to be removed to deal with it) and “after” to ensure that no contamination is caused by the remedial works themselves.
Decided Conditions Demolition 11 docs
Other reserved matters applications
In Armagh City, Banbridge and Craigavon
-
LA08/2026/0942/RM Awaiting decision
Lands 50m southwest of No.73 Monaghan Road, Enagh, Armagh BT60 4DR
Erection of a dwelling (with integrated carport and garage) on a farm and associated site works
-
LA08/2026/0929/RM Awaiting decision
Lands 30m northwest of 134 Summerisland Road, Ardress, Craigavon, BT62 1SJ
Erection of dwelling and associated ancillary works
-
LA08/2026/0529/RM Granted
Lands 20 metres east of 97 Lower Quilly Road, Dromore BT25 1LJ
Proposed Erection of Detached Dwelling and garage with Associated Site Works (amended description)
-
LA08/2026/0634/RM Granted
300m north-west of 40 Upper Quilly Road, Dromore
Two-storey replacement dwelling and detached garage
-
LA08/2026/0915/RM Awaiting decision
Lands immediately adjacent and south west of No. 17 Knock Road, Knocknamuckly, Portadown, BT63 5NA
Erection of dwelling and garage and associated works