Skip to content
PlanIndex Get alerts
Menu

Planning application

22 The Rock Road, Armagh, BT60 3NP

Refused Armagh City, Banbridge and Craigavon LA08/2024/1141/F Full

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Demolition of existing dwelling and erection of three detached storey and a half dwellings with a shared driveway to the northern boundary and associated site works

As published by the council, reference LA08/2024/1141/F

Application record

Reference
LA08/2024/1141/F
Type
Full
Status
Determined
Decision
Refused
Received
30 Sep 2024
Validated
10 Oct 2024
Decided
14 May 2026
Ward
Demesne
Postcode
BT60 3NP

Timeline

Dates from the published record

  1. 30 Sep 2024

    Received by Armagh City, Banbridge and Craigavon

  2. 10 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 14 May 2026

    Decision issued: Refused

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 15 Primates Manor, Rock Road, Armagh, BT60 2LP

    LA08/2024/1056/F Submitted 12 Sep 2024 158m away

    Erection of first floor extension to existing single storey integrated garage of dwelling and associated internal / external alterations

    Granted Full applications Extension 12 docs
    Small domestic
  • Lands situated adjacent to and south of Rockfield Downs east of Demesne Park taking in the former Armagh Integrated College site fronting the Keady Road, Armagh

    LA08/2024/1098/DC Submitted 23 Sep 2024 198m away

    Discharge of condition 3 of LA08/2022/0892/RM which reads: The construction of the development approved herein shall not commence until a hard and soft landscape and open space management and maintenance plan has been submitted to and approved by the Council. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules of all areas of landscaping and open space. It should also set out details of the arrangements that will be put in place for the future management and maintenance in perpetuity of these areas, including details of the legal agreement, between the prospective residents and Management Company, which are to be put in place as per policy OS 2 of PPS The landscape and open space management plan shall be carried out as approved. Reason: To ensure successful establishment and ongoing management and maintenance (in perpetuity) of the open space and amenity areas in the interests of visual and residential amenity.

    Decided Conditions 7 docs
  • Lands adjacent and 15m south-south-east of No. 49 Keady Road, Armagh, BT60 3NW

    LA08/2024/1171/F Submitted 4 Oct 2024 265m away

    Temporary retention of existing mobile hot food shop unit

    Withdrawn Full applications 9 docs
  • Lands adjacent and 50 metres north-east of 12 Monaghan Road Armagh BT60 4DA

    LA08/2023/2037/F Submitted 31 Mar 2023 408m away

    Erection of dwelling and garage

    Refused Full applications New dwelling 23 docs
    Domestic
  • 5 Spinners Avenue, Armagh, BT60 2PE

    LA08/2026/0888/F Submitted 17 Aug 2026 444m away

    97% historically approved · decision due ~16 Oct

    Erection of single storey side and rear extension

    Awaiting decision Full applications Extension 6 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications