Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

Granted Armagh City, Banbridge and Craigavon LA08/2023/3087/F Full

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed re-development of existing petrol filling station to include: Demolition of existing buildings on site Erection of new supermarket building 2 underground storage tanks Lighting Forecourt canopy Bunkering facilities EV charging facility with associated parking and drainage Provision of a dedicated right turning lane (amended scheme)

As published by the council, reference LA08/2023/3087/F

Application record

Reference
LA08/2023/3087/F
Type
Full
Status
Determined
Decision
Granted
Received
6 Dec 2023
Validated
14 Dec 2023
Decided
28 Oct 2024
Ward
Markethill
Postcode
BT60 2DE

Site history

Applications at this address on the Armagh City, Banbridge and Craigavon register

This site has had 4 applications since 2023: 2 approved, 0 refused.

  • Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Discharge of condition number 20 of planning approval ref: LA08/2023/3087/F which states: Prior to the construction of the drainage network, the applicant shall submit a final Drainage Assessment, to be agreed in writing with the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100-year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere.

    Decided 15 Dec 2025 Conditions
  • LA08/2025/1133/DC Awaiting decision

    Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Proposed discharge of conditions 26 & 27 of Planning Approval LA08/2023/3087/F. Condition 26 states: No development shall commence at this site until the applicant has submitted evidence in writing to the Planning Authority for its agreement demonstrating that the risks to environmental receptors due to on-site contamination have been effectively assessed. This evidence shall include: • Groundwater and surface water quality monitoring data and a quantitative risk assessment to investigate the risks to water from contamination identified at the site. • If unacceptable risks to water are identified, provision of remedial criteria as soil and groundwater concentrations that would not pose an unacceptable risk to receptors. The remedial criteria are required to be derived through Detailed Quantitative Risk Assessment based on the conceptual site model and applying the Environment Agency’s Hydrogeological Risk Assessment for Land Contamination, Remedial Targets Worksheet v3.2 (P20). If unacceptable risks to receptors are identified a detailed remediation strategy will be required in writing for agreement with the Planning Authority to address those risks. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 27 states: No development shall commence at this site until a Detailed Remediation Strategy to address all unacceptable risks to receptors has been submitted in writing and agreed with the Planning Authority. This strategy shall be completed by competent persons in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contamination-how-to-manage-the-risks. This strategy should identify all unacceptable risks on the site, the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Submitted 24 Sep 2025 Conditions
  • LA08/2025/1131/DC Awaiting decision

    Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Proposed Partial Discharge of condition 19 of planning approval LA08/2023/3087/F. Condition 19 states: No development should take place on-site until the method of sewage disposal has been submitted to and agreed in writing with the Council. The works shall be carried out as approved. Reason: To ensure protection to the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is available.

    Submitted 23 Sep 2025 Conditions

Timeline

Dates from the published record

  1. 6 Dec 2023

    Received by Armagh City, Banbridge and Craigavon

  2. 14 Dec 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 Oct 2024

    Decision issued: Granted

  4. 25 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Discharge of condition number 20 of planning approval ref: LA08/2023/3087/F which states: Prior to the construction of the drainage network, the applicant shall submit a final Drainage Assessment, to be agreed in writing with the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100-year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere.

    Decided 15 Dec 2025 Conditions
  • LA08/2025/1133/DC Awaiting decision

    Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Proposed discharge of conditions 26 & 27 of Planning Approval LA08/2023/3087/F. Condition 26 states: No development shall commence at this site until the applicant has submitted evidence in writing to the Planning Authority for its agreement demonstrating that the risks to environmental receptors due to on-site contamination have been effectively assessed. This evidence shall include: • Groundwater and surface water quality monitoring data and a quantitative risk assessment to investigate the risks to water from contamination identified at the site. • If unacceptable risks to water are identified, provision of remedial criteria as soil and groundwater concentrations that would not pose an unacceptable risk to receptors. The remedial criteria are required to be derived through Detailed Quantitative Risk Assessment based on the conceptual site model and applying the Environment Agency’s Hydrogeological Risk Assessment for Land Contamination, Remedial Targets Worksheet v3.2 (P20). If unacceptable risks to receptors are identified a detailed remediation strategy will be required in writing for agreement with the Planning Authority to address those risks. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 27 states: No development shall commence at this site until a Detailed Remediation Strategy to address all unacceptable risks to receptors has been submitted in writing and agreed with the Planning Authority. This strategy shall be completed by competent persons in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contamination-how-to-manage-the-risks. This strategy should identify all unacceptable risks on the site, the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Submitted 24 Sep 2025 Conditions
  • LA08/2025/1131/DC Awaiting decision

    Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    Proposed Partial Discharge of condition 19 of planning approval LA08/2023/3087/F. Condition 19 states: No development should take place on-site until the method of sewage disposal has been submitted to and agreed in writing with the Council. The works shall be carried out as approved. Reason: To ensure protection to the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is available.

    Submitted 23 Sep 2025 Conditions

Who's behind it

Company information only, from the register and Companies House

Clarman Architects LTD Agent, an architecture practice

21 applications on PlanIndex · across 5 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

68 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 28 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    LA08/2025/1133/DC Submitted 24 Sep 2025 50 yards away

    100% historically approved · decision due ~19 Nov

    Proposed discharge of conditions 26 & 27 of Planning Approval LA08/2023/3087/F. Condition 26 states: No development shall commence at this site until the applicant has submitted evidence in writing to the Planning Authority for its agreement demonstrating that the risks to environmental receptors due to on-site contamination have been effectively assessed. This evidence shall include: • Groundwater and surface water quality monitoring data and a quantitative risk assessment to investigate the risks to water from contamination identified at the site. • If unacceptable risks to water are identified, provision of remedial criteria as soil and groundwater concentrations that would not pose an unacceptable risk to receptors. The remedial criteria are required to be derived through Detailed Quantitative Risk Assessment based on the conceptual site model and applying the Environment Agency’s Hydrogeological Risk Assessment for Land Contamination, Remedial Targets Worksheet v3.2 (P20). If unacceptable risks to receptors are identified a detailed remediation strategy will be required in writing for agreement with the Planning Authority to address those risks. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 27 states: No development shall commence at this site until a Detailed Remediation Strategy to address all unacceptable risks to receptors has been submitted in writing and agreed with the Planning Authority. This strategy shall be completed by competent persons in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contamination-how-to-manage-the-risks. This strategy should identify all unacceptable risks on the site, the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Awaiting decision Conditions 6 docs
  • Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    LA08/2025/1131/DC Submitted 23 Sep 2025 50 yards away

    100% historically approved · decision due ~19 Nov

    Proposed Partial Discharge of condition 19 of planning approval LA08/2023/3087/F. Condition 19 states: No development should take place on-site until the method of sewage disposal has been submitted to and agreed in writing with the Council. The works shall be carried out as approved. Reason: To ensure protection to the aquatic environment and to help the applicant avoid incurring unnecessary expense before it can be ascertained that a feasible method of sewage disposal is available.

    Awaiting decision Conditions 6 docs
  • Lands at and to the south and north-west of Gosford Services Station, 145a Gosford Road, Loughgilly, Armagh, BT60 2DE

    LA08/2025/1305/DC Submitted 21 Oct 2025 50 yards away

    Discharge of condition number 20 of planning approval ref: LA08/2023/3087/F which states: Prior to the construction of the drainage network, the applicant shall submit a final Drainage Assessment, to be agreed in writing with the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100-year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere.

    Granted Conditions 10 docs

In Armagh City, Banbridge and Craigavon

  • LA08/2026/0316/F Withdrawn

    Lands immediately adjacent to and east of No.89 Blackskull Road, Dromore, BT25 1JN

    Erection of 2 no. dwellings with attached garages and associated site works.

    Received 23 Mar, published by the council 29 Jul 2026 Full applications
  • 198 Lurgan Road, Gamblestown, Dromore, BT25 1HL

    Extension to curtilage of dwelling, extension and alterations to rear of dwelling to include larger kitchen/dining area, and home office, erection of external raised terrace area and external steps, erection of replacement outbuilding to provide domestic games room, gym, W.C and storage area, and re-grading of ground levels to rear of outbuilding.

    Received 20 Feb, published by the council 7 Aug 2026 Full applications
  • 3 Mellifont Park, Armagh, BT61 9HS

    Proposed single storey side extension

    Received 20 Aug, published by the council 2 Sep 2026 Full applications
  • Immediately adjacent and north of Mountnorris Primary School 7 Main Street, Mountnorris, Armagh, BT60 2TR

    Demolition of existing single storey traditional build garage to be replaced with pre-fabricated double modular classroom and general store. Works also include: retaining wall, alterations to existing pedestrian fencing, new pedestrian fencing and bitmac footpath.

    Received 8 Jul, published by the council 7 Aug 2026 Full applications
  • Cormeen Community Hall, Tullycallidy Road, Armagh, BT60 4NE

    Two-storey extension to existing community hall to provide a music room, gymnasium, access stair, lift and associated external works and service connections (amended plans and additional information received)

    Received 7 Jul, published by the council 7 Aug 2026 Full applications