Planning application
St Patrick's College Scarva Road Banbridge BT32 3AS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Provision of a new two storey double modular classroom unit to provide a new 90m2 home economics classroom, 30m2 Resource/Technican’s room and a 45m2 Multi-purpose room on the ground floor and two 60m2 general classrooms on the first floor and associated ancillary spaces. The proposal involves the re-organisation of the existing school with two of the new class rooms to replace overflow classrooms within the existing school building.
As published by the council, reference LA08/2023/2699/F
Application record
- Reference
- LA08/2023/2699/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 11 Sep 2023
- Validated
- 11 Sep 2023
- Decided
- 21 Oct 2024
- Ward
- Banbridge West
- Postcode
- BT32 3AS
Timeline
Dates from the published record
-
11 Sep 2023
Received by Armagh City, Banbridge and Craigavon
-
21 Oct 2024
Decision issued: Granted
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Lands to the north and rear of no.35a-39 Larchwood and adjacent to and west of St. Patrick’s College, Scarva Road, Banbridge (with access from Scarva Road).
Erection of 32 no. residential units comprising of 15no. apartments, 16no. semi-detached and 1 no. detached dwellings, including provision of solar panels, car parking, private amenity and communal open space with landscaping, and all associated site and access works, (change of house types from that as approved under LA08/2025/0493/F)
Granted Full applications New dwelling 75 docsMajor scheme -
42 Ballygowan Park, Banbridge, BT32 3AN
Proposed erection of single storey gable extension to existing dwelling to provide ground floor bedroom, wet room and rear access lobby. Demolishion and removal of garden sheds, outbuildings and carport. Proposed access ramp, raised landings, garden steps, associated landscaping and pedestrian gateway to public parking area to the rear of dwelling to provide level access to the proposal.
Granted Full applications Extension 10 docsSmall domestic -
75 Edenderry Park, Banbridge, BT32 3AY
PROPOSED SINGLE STOREY REAR EXTENSION AND NEW RAMP AT FRONT OF DWELLING
Granted Full applications Extension 12 docsSmall domestic -
26 Wyncroft Heights, Ballyvally, Banbridge, BT32 3QA
Erection of extension and alterations to existing dwelling to form new open plan kitchen, living & dining area together with new master-bedroom to include walk in wardrobe and en-suite.
Granted Full applications Extension 10 docsDomestic -
Former Brookfields Factory Site located circa 90m North West of No.14 Brookfield Meadows, Banbridge, Co. Down, BT32 3FR
Discharge of Conditions number 8 & 13: of Planning Approval LA08/2019/1396/F. Summary of condition requirements: Prior to the occupation of any dwelling hereby permitted, the applicant shall submit and agree in writing with the Planning Authority a verification report confirming that all works were completed in accordance remediation works specified in section 5 of the Foyle Consulting Engineers assessment. This shall include suitable photographic and documentary evidence and as built plans showing the specific elements of the remediation scheme. Reason: For the protection of the health of future occupiers of the proposed development. After completing the remediation works under Condition 8 and prior to occupation of the development, a Verification Report needs to be submitted in writing and agreed with Planning Authority. This report should be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11) and/or the Land Contamination: Risk Management (LCRM) guidance, as applicable. The Verification Report should present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives. Reason: Protection of environmental receptors to ensure the site is suitable for use.
Decided Conditions 14 docsDomestic -
St Marys Primary School, 31 Reilly Park, Banbridge, BT32 3DJ
Construction of new car park and additional car parking spaces to provide 37 No. car parking spaces, 20 No. of which will be designated for drop-off and pick-up only. The proposal requires retaining structures along the northern boundary with NIHE property at Iveagh Drive and along the eastern boundary and includes new fencing and lighting. The proposal has been submitted to overcome parking/congestion concerns with application LA08/2022/0181/F for a 2 storey extension to the existing school to provide an additional 4 classrooms and associated resource areas and toilets.
Granted Full applications Extension 20 docs
Other full applications applications
In Armagh City, Banbridge and Craigavon
-
LA08/2026/0760/F Granted
156a Navan Fort Road, Killylea, Armagh, BT60 4PY
Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works
-
LA08/2025/1515/F Granted
Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ
Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works
-
LA08/2026/0446/F Granted
Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).
Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM
-
LA08/2025/1395/F Granted
Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF
Erection of dwelling and garage with associated site works (Amended plans)
-
LA08/2026/0647/F Granted
Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ
Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).