Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (With access onto Killycomain Road)

Granted Armagh City, Banbridge and Craigavon LA08/2023/2031/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of petrol filling station, convenience store, hot food prep area and deli counter, bulk fuels store, petrol pumps, canopy, right turning lane, pedestrian crossing, footpath widening and associated site works (amended plans received).

As published by the council, reference LA08/2023/2031/F

Application record

Reference
LA08/2023/2031/F
Type
Full
Status
Determined
Decision
Granted
Received
28 Mar 2023
Validated
3 May 2023
Decided
17 Feb 2025
Ward
Kernan

Site history

Applications at this address on the Armagh City, Banbridge and Craigavon register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (With access onto Killycomain Road)

    Proposed discharge of Conditions 22 and 25 of approval reference LA08/2023/2031/F (Petrol Filling Station and convenience store with associated road and site works) which read: Condition 22 Prior to the commencement of the development hereby permitted, a remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved, shall be submitted to and approved in writing by the Council. The remediation scheme shall be carried out as approved. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 25 If piling is required, no development or piling work shall commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on “Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention”, has been submitted to and agreed in writing with the Council. The piling risk assessment shall be carried out as agreed. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Decided 22 May 2026 Conditions

Timeline

Dates from the published record

  1. 28 Mar 2023

    Received by Armagh City, Banbridge and Craigavon

  2. 3 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 17 Feb 2025

    Decision issued: Granted

  4. 25 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

7 later applications on the register refer to this one:

  • LA08/2026/0536/DC Awaiting decision

    Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Discharge of condition 33 of LA08/2023/2031/F which reads: Prior to the commencement of retailing from the development hereby approved a Service Management plan for the site shall be agreed in writing with the Council. This plan shall include limiting the HGV service times to outside of peak hours of 0815 to 0915 and 1700 to 1800 and the Service Management plan shall be carried out as approved.

    Submitted 14 May 2026 Conditions
  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Discharge of condition 34 of LA08/2023/2031/F which reads: No development shall take place until a Wastewater Impact Assessment has been submitted to and approved in writing by the Council, in consultation with NI Water, with the Wastewater Impact Assessment demonstrating that the development can be served by the public sewerage system or that acceptable alternative provision for disposal of sewerage has been made. Any mitigation measures contained therein shall be implemented prior to the commencement of the development herby permitted, or in accordance with a programme to be submitted to and agreed in writing with the Council.

    Decided 20 Jul 2026 Conditions
  • LA08/2026/0461/DC Awaiting decision

    Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Proposed discharge of condition 3 of planning approval LA08/2023/2031/F. Condition 3 states: Prior to occupation of the development hereby permitted, a landscape management and maintenance plan shall be submitted to and approved in writing by the Council. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules of all areas of landscaping. The landscape management plan shall be carried out as approved. Reason: To ensure successful establishment and ongoing management and maintenance (in perpetuity) of the landscaped areas in the interests of visual amenity.

    Submitted 29 Apr 2026 Conditions
  • LA08/2026/0453/DC Awaiting decision

    Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Proposed discharge of condition 16 of planning approval LA08/2023/2031/F. Condition 16 states: No development shall take place until details of the means of ventilation, including details of its method of construction, odour control measures (if applicable), noise levels, its appearance and finish have been submitted to and approved in writing by the council. A three-stage extraction ventilation system shall be installed to include: - • Filtration • Electrostatic Precipitation • Chemical Neutralisation Alternatively, the services of a suitably qualified ventilation engineer shall be employed to produce a scheme designed to achieve a level of odour commensurate with the level of odour control required following their completion of a risk assessment for odour. Reason: In the interests of residential and visual amenity.

    Submitted 28 Apr 2026 Conditions
  • LA08/2026/0387/DC Awaiting decision

    Development site on lands 52m north-west of nos. 48-50 Killycomain Road, 40m south-east of nos. 26-32 Bachelors Avenue, Portadown (with access onto Killycomain Road).

    Discharge of Condition No. 23 & 24 of planning approval LA08/2023/2031/F which state: Condition number 23: If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contamination-how-to-manage-therisks. In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Planning Authority in writing, and subsequently implemented and verified to its satisfaction. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition number 24. After completing any remediation works under Condition No. 23, and prior to occupation of the development, a verification report shall be submitted in writing and agreed with the Council. This report should be completed by competent persons in accordance with the Land Contamination: Risk Management (LCRM) guidance available at: https://www.gov.uk/guidance/land-contamination-how-tomanage-the-risks. The verification report shall present all the remediation, waste management and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and wastes in achieving the remedial objectives. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Submitted 13 Apr 2026 Conditions
  • LA08/2025/1363/DC Awaiting decision

    Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of nos.16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Discharge of Condition 35 of application LA08/2023/2031/F. Condition 35 states: "No development shall take place until final details of all external lighting columns have been submitted to and approved in writing by the council. The lighting columns shall be installed in accordance with the approved details and maintained in perpetuity to the satisfaction of the Council. Reason: In the interests of visual amenity."

    Submitted 3 Nov 2025 Conditions
  • Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (With access onto Killycomain Road)

    Proposed discharge of Conditions 22 and 25 of approval reference LA08/2023/2031/F (Petrol Filling Station and convenience store with associated road and site works) which read: Condition 22 Prior to the commencement of the development hereby permitted, a remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved, shall be submitted to and approved in writing by the Council. The remediation scheme shall be carried out as approved. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 25 If piling is required, no development or piling work shall commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on “Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention”, has been submitted to and agreed in writing with the Council. The piling risk assessment shall be carried out as agreed. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Decided 22 May 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Agent on file, a construction firm registered in Dungannon

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

96 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 17 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    LA08/2026/0536/DC Submitted 14 May 2026 13m away

    95% historically approved · decision due ~9 Jul

    Discharge of condition 33 of LA08/2023/2031/F which reads: Prior to the commencement of retailing from the development hereby approved a Service Management plan for the site shall be agreed in writing with the Council. This plan shall include limiting the HGV service times to outside of peak hours of 0815 to 0915 and 1700 to 1800 and the Service Management plan shall be carried out as approved.

    Awaiting decision Conditions 6 docs
  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    LA08/2026/0535/DC Submitted 14 May 2026 13m away

    Discharge of condition 34 of LA08/2023/2031/F which reads: No development shall take place until a Wastewater Impact Assessment has been submitted to and approved in writing by the Council, in consultation with NI Water, with the Wastewater Impact Assessment demonstrating that the development can be served by the public sewerage system or that acceptable alternative provision for disposal of sewerage has been made. Any mitigation measures contained therein shall be implemented prior to the commencement of the development herby permitted, or in accordance with a programme to be submitted to and agreed in writing with the Council.

    Decided Conditions 4 docs
  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    LA08/2026/0461/DC Submitted 29 Apr 2026 13m away

    95% historically approved · decision due ~6 Jul

    Proposed discharge of condition 3 of planning approval LA08/2023/2031/F. Condition 3 states: Prior to occupation of the development hereby permitted, a landscape management and maintenance plan shall be submitted to and approved in writing by the Council. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules of all areas of landscaping. The landscape management plan shall be carried out as approved. Reason: To ensure successful establishment and ongoing management and maintenance (in perpetuity) of the landscaped areas in the interests of visual amenity.

    Awaiting decision Conditions 4 docs
  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    LA08/2026/0453/DC Submitted 28 Apr 2026 13m away

    95% historically approved · decision due ~23 Jun

    Proposed discharge of condition 16 of planning approval LA08/2023/2031/F. Condition 16 states: No development shall take place until details of the means of ventilation, including details of its method of construction, odour control measures (if applicable), noise levels, its appearance and finish have been submitted to and approved in writing by the council. A three-stage extraction ventilation system shall be installed to include: - • Filtration • Electrostatic Precipitation • Chemical Neutralisation Alternatively, the services of a suitably qualified ventilation engineer shall be employed to produce a scheme designed to achieve a level of odour commensurate with the level of odour control required following their completion of a risk assessment for odour. Reason: In the interests of residential and visual amenity.

    Awaiting decision Conditions 8 docs
  • Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of nos.16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    LA08/2025/1363/DC Submitted 3 Nov 2025 13m away

    95% historically approved · decision due ~29 Dec

    Discharge of Condition 35 of application LA08/2023/2031/F. Condition 35 states: "No development shall take place until final details of all external lighting columns have been submitted to and approved in writing by the council. The lighting columns shall be installed in accordance with the approved details and maintained in perpetuity to the satisfaction of the Council. Reason: In the interests of visual amenity."

    Awaiting decision Conditions 5 docs
  • Lands 52m north-west of nos.48-50 Killycomain Road, 40m south-east of nos.26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (With access onto Killycomain Road)

    LA08/2025/1331/DC Submitted 27 Oct 2025 13m away

    Proposed discharge of Conditions 22 and 25 of approval reference LA08/2023/2031/F (Petrol Filling Station and convenience store with associated road and site works) which read: Condition 22 Prior to the commencement of the development hereby permitted, a remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved, shall be submitted to and approved in writing by the Council. The remediation scheme shall be carried out as approved. Reason: Protection of environmental receptors to ensure the site is suitable for use. Condition 25 If piling is required, no development or piling work shall commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on “Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention”, has been submitted to and agreed in writing with the Council. The piling risk assessment shall be carried out as agreed. Reason: Protection of environmental receptors to ensure the site is suitable for use.

    Decided Conditions 7 docs

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications