Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Killuney Park Road Armagh BT61 9HG

Granted Armagh City, Banbridge and Craigavon LA08/2022/1054/F Full

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed extension and internal alterations.

As published by the council, reference LA08/2022/1054/F

Application record

Reference
LA08/2022/1054/F
Type
Full
Status
Determined
Decision
Granted
Received
25 Aug 2022
Validated
25 Aug 2022
Decided
17 Apr 2023
Ward
The Mall
Postcode
BT61 9HG

Timeline

Dates from the published record

  1. 25 Aug 2022

    Received by Armagh City, Banbridge and Craigavon

  2. 17 Apr 2023

    Decision issued: Granted

  3. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Armagh

45 applications on PlanIndex · across 5 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 7 Killuney Park Road, Armagh, BT61 9HG

    LA08/2025/1138/F Submitted 24 Sep 2025 180m away

    Erection of replacement dwelling with solar panels and ancillary domestic outbuilding

    Granted Full applications 15 docs
    Small domestic
  • Lands approx. 93m South West of No. 2 Drumman Heights Armagh BT61 9SL

    LA08/2022/0960/F Submitted 28 Jul 2022 405m away

    Erection of 2 no. dwellings (change of house type to sites 34 - 35 and amended footpath link proposal from previous approval LA08/2018/0509/F), garages and all other associated site works

    Granted Full applications 37 docs
    Several homes
  • 3 Mellifont Park, Armagh, BT61 9HS

    LA08/2026/0908/F Submitted 20 Aug 2026 429m away

    97% historically approved · decision due ~15 Oct

    Proposed single storey side extension

    Awaiting decision Full applications Extension 6 docs
    Small domestic
  • 58j Hamiltonsbawn Road, Hamiltonsbawn Road Industrial Estate, Armagh, BT60 1HW

    LA08/2025/0871/F Submitted 9 Jul 2025 459m away

    Retention of two-storey office building (extension to existing industrial unit) and associated parking

    Granted Full applications Extension 27 docs
  • 4 Mullinure, Mullynure, Armagh, BT61 9EH

    LA08/2025/1064/F Submitted 8 Sep 2025 481m away

    Alterations and extensions to existing dwelling to form new ensuite and kitchen including siteworks

    Granted Full applications Extension 16 docs
    Domestic

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications