Planning application
Lands to the rear of No's 2-22 (evens) Drumman Heights 1-9 Mellifont Drive 13-28 Mellifont Park Armagh BT61 9HS and adjacent to A3 Portadown Road.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed Discharge of Conditions 6, 7 and 10 on Planning Application LA08/2022/0895/F Condition 6 states – Prior to discharge to Killuney Drain, surface water generated during construction and operation phases of the development must first pass through appropriate treatment, such as sediment traps and hydrocarbon interceptors Condition 7 states - A suitable buffer at least 10m must be maintained between the location of all construction works including refuelling, storage of oil / fuel, concrete mixing and washing areas, storage of machinery / material / spoil etc. and the Killuney Drain Condition 10 states - All drainage systems shall be provided as designed, detailed and specified in the Flood Risk and drainage assessment dated June 2018 and on drawing no.13a dated 6th August 2018. The works shall be carried out prior to the commencement of the development hereby permitted, or in accordance with a programme to be submitted to and agreed in writing with the Council
As published by the council, reference LA08/2023/2256/DC
Application record
- Reference
- LA08/2023/2256/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Granted As published: Condition Discharged
- Received
- 1 Jun 2023
- Validated
- 1 Jun 2023
- Decided
- 26 Feb 2025
- Ward
- The Mall
- Postcode
- BT61 9HS
Timeline
Dates from the published record
-
1 Jun 2023
Received by Armagh City, Banbridge and Craigavon
-
26 Feb 2025
Decision issued: Condition Discharged
-
21 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
APD Architects Ltd. Agent, an architecture practice registered in Bangor
Active · incorporated 2021 · Bangor
111 applications on PlanIndex · across 7 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Armagh City, Banbridge and Craigavon granted permission on 26 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands approx. 93m South West of No. 2 Drumman Heights Armagh BT61 9SL
Erection of 2 no. dwellings (change of house type to sites 34 - 35 and amended footpath link proposal from previous approval LA08/2018/0509/F), garages and all other associated site works
Granted Full applications 37 docsSeveral homes -
3 Mellifont Park, Armagh, BT61 9HS
97% historically approved · decision due ~15 Oct
Proposed single storey side extension
Awaiting decision Full applications Extension 7 docsSmall domestic -
7 Killuney Park Road, Armagh, BT61 9HG
Erection of replacement dwelling with solar panels and ancillary domestic outbuilding
Granted Full applications 15 docsSmall domestic -
4 Mullinure, Mullynure, Armagh, BT61 9EH
Alterations and extensions to existing dwelling to form new ensuite and kitchen including siteworks
Granted Full applications Extension 16 docsDomestic -
21 Killuney Park Road Armagh BT61 9HG
Proposed extension and internal alterations.
Granted Full applications Extension 15 docs -
Lands to the east of Deanery Court and Deanery Meadow south of the disused railway line and immediately west of Nos 3-13 Sperrin Park and Nos 3 and 4 Mellifont Crest, Armagh
Discharge of condition no.7 of LA08/2022/0601/F which reads: A final play equipment and associated maintenance plan shall be submitted in writing and approved by the Council prior to the construction of the dwellings at sites 30-58 shall herein granted and shall be implemented in accordance with details set out therein. This shall include as a minimum the design details, operation, installation, maintenance and inspection arrangements. The final play equipment maintenance plan shall be in broad conformity with the principles set out in the Landscape Management Plan.
Granted Conditions 13 docs
Other condition discharge and variation applications
In Armagh City, Banbridge and Craigavon
-
LA08/2025/0534/DC Granted
100 CORNAKINNEGAR ROAD KILMORE LURGAN BT67 9JP
Proposed discharge of condition 2 of planning approval LA08/2020/1280/F. Condition 2 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Armagh City, Banbridge and Craigavon Borough Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: - The identification and evaluation of archaeological remains within the site; - Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; - Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and - Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded.
-
LA08/2026/0579/DC Granted
29 Derryclone Road, Craigavon, BT67 0BN
Discharge of Conditions 3 and 4 of planning ref: LA08/2025/0799/F which read: Conditon 3: Within twenty four hours prior to demolition, the existing buildings on the site shall be checked for bat presence by a competent ecologist and all demolition works shall be monitored by a competent ecologist. A report of the demolition shall be submitted to the Planning Authority for approval in writing within 2 weeks. Reason: To ensure protection to bats and their roosts. Condition 4: No demolition of buildings or structures shall take place between 1 March and 31 August inclusive, unless a competent ecologist has undertaken a detailed check for active bird’s nests immediately before demolition and provided written confirmation that no nests are present/birds will be harmed and/or there are appropriate measures in place to protect nesting birds. Any such written confirmation shall be submitted to the Planning Authority within 6 weeks of works commencing. Reason: To protect breeding birds.
-
LA08/2026/0943/DC Awaiting decision
Lands at No.19 Church Road extending from the rear of No's. 1 - 17a Church Road and south and east of Glen Dimplex premises Lurgan Road, Portadown.
Discharge of condition 08 of LA08/2019/1595/F as it relates to sites 15 and 16; the condition reads as follows: After completing any remediation works required under Conditions 5, 6 and 7 and prior to occupation of the development, a verification report shall be submitted and approved in writing by the Council. This report shall be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11). The verification report shall present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives.
-
LA08/2026/0935/DC Awaiting decision
Nos 31, 32, 33, 34, 35, 36 and 37 Hunter's Lodge, Drumnakelly, Lurgan, Craigavon BT66 6NB
Discharge of Condition No.4 of LA08/2026/0498/F which reads: Within three 3 calendar months of the date of this decision, the developer shall submit to the Council for its written approval a landscaping scheme showing the location, numbers, species and sizes of trees and shrubs to be planted. The scheme of planting as finally approved shall be carried out during the first planting season after the Council’s final approval of that landscaping scheme. Trees or shrubs dying, removed or becoming seriously damaged within the lifetime of the development, shall be replaced in the next planting season with others of a similar size and species unless the Council gives written consent to any variation. Reason: In the interest of visual amenity and to ensure the provision, establishment and maintenance of a high standard of landscape.
-
LA08/2026/0919/DC Awaiting decision
Lands at and immediately south and west of 1 Clare Road, Clare, Tandragee, BT62 2EY
Discharge of conditions 5 and 6 of LA08/2023/2288/F - Demolition of existing dwelling, erection of 4no. semi-detached two-storey dwellings, erection of retaining walling, creation of new access onto Cloghoge Road, and associated site works