Planning application

26/01062/SCREEN

Cruachan Dam Lochawe Argyll And Bute

Awaiting decision Argyll and Bute Screening Opinion

Proposal

Screening opinion for installation of spillway gates and control building

As published by the council, reference 26/01062/SCREEN

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by Argyll and Bute

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 26/00218/PNELEC Granted

    Cruachan Power Station Lochawe Argyll And Bute PA33 1AN

    Erection of disperser valve enclosure

    3 Feb 2026 38m away Other
  • 26/00135/LIB Granted

    Cruachan Dam Lochawe Argyll And Bute PA33 1AN

    Alterations to replace and upgrade existing timber security doors, formation of new security fencing and security enclosure for disperser valve controls

    23 Jan 2026 45m away Heritage and listed buildings
  • 26/01183/LIB Awaiting decision

    Cruachan Power Station Lochawe Argyll And Bute PA33 1AN

    Alterations to control room to form acoustic partition behind oriel window in line with existing wall and remove existing low level lockers in front of window

    9 Jul 2026 358m away Heritage and listed buildings
  • 26/00134/LIB Granted

    Cruachan Power Station Lochawe Argyll And Bute PA33 1AN

    Alterations to existing control block access to form new upgraded security doors at the west, central and east stairs. Replacement/upgrade of all existing fire doors. Alterations to replace existing protective barriers in machine hall and at lighting gantry to meet current safety requirements

    23 Jan 2026 418m away Heritage and listed buildings

In Argyll and Bute

  • 26/01253/FELLIC Decided

    Torinturk Forest Torinturk Tarbert Argyll And Bute

    Felling Licence

    17 Jul 2026 Outline
  • 26/01265/FDP Awaiting decision

    High Lossit Forest Campbeltown Argyll And Bute

    Felling Permission Application

    21 Jul 2026 Outline
  • 26/01265/FELLIC Awaiting decision

    High Lossit Forest Campbeltown Argyll And Bute

    Felling Permission Application

    21 Jul 2026 Outline
  • 26/01234/S36 Awaiting decision

    Tangy IV Wind Farm Kilchenzie Argyll And Bute

    Section 36C Application to vary the consent for Tangy IV Wind Farm (ECU00006203)

    16 Jul 2026 Outline
  • 26/01208/PPP Awaiting decision

    Land To The Rear Of 6 And 8 George Street Hunters Quay Dunoon Argyll And Bute

    Site for the erection of residential development, including formation of new vehicular access