Planning application

Land West Of Crossaig Sub Station Skipness Argyll And Bute

Awaiting decision Argyll and Bute 26/00878/PP Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction and operation of a 132 kV alternating current harmonic filter and associated development

As published by the council, reference 26/00878/PP

Application record

Reference
26/00878/PP
Type
Planning Permission
Status
Awaiting decision
Received
22 May 2026
Validated
20 Jul 2026
Ward
Kintyre And The Islands
Parish
Tarbert And Skipness Community Council

Site history

Applications at this address on the Argyll and Bute register

This site has had 2 applications since 2026.

  • 26/00153/SCREEN Decided

    Land West Of Crossaig Sub Station Skipness Argyll And Bute

    Screening opinion for proposed alternating current harmonic filter development

    Decided 17 Apr 2026 Outline

Timeline

Dates from the published record

  1. 22 May 2026

    Received by Argyll and Bute

  2. 20 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Argyll and Bute took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 107 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land West Of Crossaig Sub Station Skipness Argyll And Bute

    26/00153/SCREEN Submitted 26 Jan 2026 150 yards away

    Screening opinion for proposed alternating current harmonic filter development

    Decided Outline
  • Land Adjacent To Crossaig Sub Station Skipness Argyll And Bute

    24/01098/PP Submitted 14 Jun 2024 150 yards away

    Variation of condition 7 of planning permission reference 23/00382/PP (Erection of high voltage electricity substation and formation of associated access, landscaping, drainage and means of enclosure and platform extension) amendment of condition relating to wording of peat condition.

    Granted Full applications Extension 32 docs
  • Land Adjacent To Crossaig Sub Station Skipness Argyll And Bute

    23/00382/PP Submitted 24 Feb 2023 200 yards away

    Erection of high voltage electricity substation and formation of associated access, landscaping, drainage and means of enclosure and platform extension

    Granted Full applications Extension 88 docs
  • Crossaig Sub Station Skipness Argyll And Bute

    24/00552/NMA Submitted 21 Mar 2024 200 yards away

    Non material amendment to planning permission 23/00382/PP (Erection of high voltage electricity substation and formation of associated access, landscaping, drainage and means of enclosure and platform extension) changes in design and the justifications for the final drainage solution.

    Withdrawn Amendments Extension 5 docs

In Argyll and Bute

  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications
  • 25/01665/PP Withdrawn

    Land East Of Former Gunpowder Store Kames Argyll And Bute

    Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track

    Received 7 Oct, published by the council 28 Jul 2026 Full applications