Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Works: Windows or glazing
Relates to 26/00494/PP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non Material Amendment to Planning Permission 26/00494/PP - (Installation of 5 replacement external fire doors) - Alterations to proposed replacement doors and screens, including door format and alteration of previously proposed glazed panels to opaque panels to suit security upgrade requirements
As published by the council, reference 26/00874/NMA
Application record
- Reference
- 26/00874/NMA
- Type
- App.for Non Material Amendment (sec 64)
- Status
- Awaiting decision
- Received
- 21 May 2026
- Validated
- 21 May 2026
- Ward
- Oban North And Lorn
- Parish
- Glenorchy And Inishail Community Council
- Postcode
- PA33 1AN
Site history
Applications at this address on the Argyll and Bute register
This site has had 6 applications since 2026: 5 approved, 0 refused.
-
26/01183/LIB Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Alterations to control room to form acoustic partition behind oriel window in line with existing wall and remove existing low level lockers in front of window
-
26/00494/PP Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Installation of 5 replacement external fire doors
-
26/00218/PNELEC Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Erection of disperser valve enclosure
-
26/00219/PNELEC Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Erection of tailrace gate enclosure and fencing
-
26/00134/LIB Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Alterations to existing control block access to form new upgraded security doors at the west, central and east stairs. Replacement/upgrade of all existing fire doors. Alterations to replace existing protective barriers in machine hall and at lighting gantry to meet current safety requirements
Timeline
Dates from the published record
-
21 May 2026
Received by Argyll and Bute
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/00494/PP Granted
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Installation of 5 replacement external fire doors
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided amendment applications in a median of 30 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Alterations to control room to form acoustic partition behind oriel window in line with existing wall and remove existing low level lockers in front of window
Granted Windows or glazing -
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Installation of 5 replacement external fire doors
Granted Full applications -
Land To North Of Cruachan Power Station Taynuilt Argyll And Bute
Retention of toilet block approved under planning permission reference 12/00213/PP (retrospective)
Granted Full applications 13 docs -
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Erection of tailrace gate enclosure and fencing
Granted Other -
Cruachan Power Station Lochawe Dalmally Argyll And Bute PA33 1AN
Section 36 for upgrading works at Cruachan Power Station
Granted Outline 18 docs -
Tervine Fish Farm Kilchrenan Argyll And Bute
Replacement of 26 circular pens (2x 60m; 16x 50m; 8x 40m) with 20x 60m circumference circular pens
Decided 12 docs
Other amendment applications
In Argyll and Bute
-
26/01876/NMA Awaiting decision
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Non Material Amendment relatvie to Planning Permission 25/02132/PP (Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging) Various changes
-
26/01768/NMA Decided
7 Lower Achagoyle Minard Argyll And Bute PA32 8YD
Non Material Amendment relative to Planning Permission 26/01030/PP Change of use of land for siting of moveable sauna on a trailer for commercial purposes - Size of the sauna changed from 2.3m x 2.6m to 2.35m x 2.8m.
-
26/01746/NMA Decided
4 Kyle View Kilcreggan Argyll And Bute G84 0HD
Non Material Amendment relative to Planning Permission 22/02138/PP Erection of retaining wall to boundary with adjacent property (plot 3) - Change of construction type of retaining from block retaining wall system to concrete wall system and change to dimensions of wall
-
26/01687/NMA Awaiting decision
Sailing Clubhouse Low Askomil Campbeltown Argyll And Bute PA28 6EP
Non Material Amendment relatvie to Planning Permission 22/00057/PP (Demolition of the existing sailing club house, erection of replacement two storey building for use as a water sports centre and hub (Use Class 11), installation of roof solar array panels and perimeter fencing) Proposed Amendments to cladding, window sizes/position and fire escapes
-
26/01628/NMA Granted
7 Kilduskland Drive Ardrishaig Argyll And Bute PA30 8HS
Non Material Amendment to Planning Permission 25/00414/PP - (Erection of replacement roof to rear extension, erection of canopy to new entrance door, various alterations to existing dwellinghouse and replacement of balcony protective barrier) - removal of front elevation canopy, no new front elevation openings, change to rear openings and roof change to the existing rear extension. No replacement balustrade to balcony