26/00599/PNELEC

Meall Buidhe Glenkinglass Argyll And Bute

Granted Argyll and Bute Prior Notif. ELECTRICITY works

Proposal

Installation of 11kV overhead line to serve individual customer

As published by the council, reference 26/00599/PNELEC

Timeline

Dates from the published record

  1. 7 Apr 2026

    Received by Argyll and Bute

  2. 30 Apr 2026

    Decision issued: Prior Approval is NOT Required

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 26/00599/ELCNOT Granted

    Meall Buidhe Glenkinglass Argyll And Bute

    Installation of 11kV overhead line to serve individual customer

    7 Apr 2026 0m away Other
  • 23/02431/DOC01 Decided

    Foot Of Meall Buidhe South Of River Kinglass Glen Kinglass Argyll And Bute

    Request to discharge conditions relative to application 23/02431/PP - specifically conditions 4,5 and 6

    20 Nov 2025 399m away Conditions
  • 25/02083/NMA Granted

    Glenkinglass Estate Glenkinglass Argyll And Bute

    Non Material Amendment to Planning application 23/02431/PP - (Erection of telecommunications equipment compound with 32.5 metre high lattice tower and formation of vehicular access track) - reduction in size of site compound, gabion wall and parking, reduction in length of proposed forestry track and other minor changes

    15 Dec 2025 403m away Amendments

In Argyll and Bute

  • 26/01220/PNELEC Awaiting decision

    Land At Strone Farm Minard Argyll And Bute

    24 New poles from existing line to connect the 2 new transmission substation buildings

    15 Jul 2026 Other
  • 26/01138/ELCNOT Awaiting decision

    Land At Colintraive Argyll And Bute

    Installation of a new 33kV overhead spur

    2 Jul 2026 Other
  • 26/00995/ELCNOT Awaiting decision

    Land West Of Clachan Farm Kilninver Argyll And Bute

    Installation of 11kV overhead line spur

    10 Jun 2026 Other
  • 26/00958/ELCNOT Decided

    Land At Clachaig Glen Clachaig Argyll And Bute

    Installation of 33kV overhead line

    4 Jun 2026 Other
  • 26/00939/PNELEC Awaiting decision

    Crossaig South Sub Station To High Constellation Wind Farm Skipness Argyll And Bute

    Installation of underground cable connecting Crossaig South Substation to High Constellation Project

    2 Jun 2026 Other