Planning application
Portintruan Distillery Port Ellen Isle Of Islay Argyll And Bute PA42 7DS
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for water abstraction, including installation of storage tanks and associated infrastructure (replacing reservoir storage and burn abstraction approved under application 19/02555/PP)
As published by the council, reference 26/00563/PP
Application record
- Reference
- 26/00563/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 31 Mar 2026
- Validated
- 16 Apr 2026
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
- Postcode
- PA42 7DS
Site history
Applications at this address on the Argyll and Bute register
This site has had 2 applications since 2026: 1 approved, 0 refused.
-
26/00563/DOC01 Granted
Portintruan Distillery Port Ellen Isle Of Islay Argyll And Bute PA42 7DS
Request to discharge conditions relative to application 26/00563/PP. Specifically Condition 2 (Private Water Supply), Condition 3 (Visibility Splays), Condition 4 (CTMP) and Condition 5 (Archaeology)
Timeline
Dates from the published record
-
31 Mar 2026
Received by Argyll and Bute
-
16 Apr 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00563/DOC01 Granted
Portintruan Distillery Port Ellen Isle Of Islay Argyll And Bute PA42 7DS
Request to discharge conditions relative to application 26/00563/PP. Specifically Condition 2 (Private Water Supply), Condition 3 (Visibility Splays), Condition 4 (CTMP) and Condition 5 (Archaeology)
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 95 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Cam Sgeir Torradale Port Ellen Isle Of Islay Argyll And Bute PA42 7DS
Change of use of land for the siting of holiday pod for short term lets
Granted Full applications 15 docs -
Portintruan Distillery Port Ellen Isle Of Islay Argyll And Bute PA42 7DS
Request to discharge conditions relative to application 26/00563/PP. Specifically Condition 2 (Private Water Supply), Condition 3 (Visibility Splays), Condition 4 (CTMP) and Condition 5 (Archaeology)
Granted Conditions -
Port An Truain Farm Port Ellen Isle Of Islay Argyll And Bute
Erection of agricultural shed
Granted OtherSmall domestic
Other full applications
In Argyll and Bute
-
26/00047/PP Granted
Zing Organics (The Rest) The Old Post Office Building Campbeltown Road Tarbert Argyll And Bute PA29 6SX
Change of use of ground floor retail unit to cafe/restaurant and two short term holiday lets along with the external colour change
-
25/01690/PP Granted
Trinity Church 26 Castle Street Rothesay Isle Of Bute Argyll And Bute PA20 9HA
Change of use and conversion of existing church and church hall to form family entertainment activity centre including erection of single storey link extension and associated works
-
26/01441/PP Awaiting decision
31A Mountstuart Road Rothesay Isle Of Bute Argyll And Bute PA20 9EB
Re-instatement of failed roof on rear outbuilding with box profile steel roof with rooflights and replacement of failed window and door in white UPVC.
-
25/01975/PP Granted
Land East Of 23 Barrmor View Kilmartin Argyll And Bute
Renewal of planning permission 21/02460/PP - (Erection of 2 dwellinghouses and formation of vehicular accesses)
-
26/00126/PP Withdrawn
Land West Of Calgary Bay Calgary Isle Of Mull Argyll And Bute
Erection of dwellinghouse, installation of sewerage treatment system, renovation of existing derelict boatshed, formation of vehicular access and widening and upgrade of existing vehicular access