Planning application
26/00249/LIB
Harbour House Pier Square Ardrishaig Argyll And Bute PA30 8DZ
Proposal
Conversion of existing office spaces into short-term rental rooms with ensuites. Partial downtaking of walls to maximise room areas. No external alterations
As published by the council, reference 26/00249/LIB
Timeline
Dates from the published record
-
9 Feb 2026
Received by Argyll and Bute
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
26/00248/PP Awaiting decision
Harbour House And Unit 12 Pier Square Ardrishaig Argyll And Bute PA30 8DZ
Alterations and change of use of office and storage spaces to form short-term let accommodation
-
25/01493/LIB Awaiting decision
The Steamer Terminal Pier Square Ardrishaig Argyll And Bute PA30 8DZ
Installation of replacement windows
-
26/00085/PP Awaiting decision
Former Oil Depot Site Chalmers Street Ardrishaig Argyll And Bute
Erection of craft whisky distillery with visitor facilities and associated works
-
26/00473/PP Awaiting decision
55 Chalmers Street Ardrishaig Argyll And Bute PA30 8EY
Installation of air conditioning and external condensers
-
25/01729/TELNOT Withdrawn
Land Adjacent To Macmillan Court Ardrishaig Argyll And Bute
Installation of 1 x 7m light wooden pole
-
25/02041/PP Granted
Ardrishaig Public Hall Chalmers Street Ardrishaig Argyll And Bute PA30 8EY
Alterations to entrance to form porch
Other heritage and listed buildings applications
In Argyll and Bute
-
26/01244/LIB Awaiting decision
1 Keills Craighouse Isle Of Jura Argyll And Bute PA60 7XG
Installation of replacement roof covering and reconstruction of derelict byre to form extension to dwellinghouse
-
26/01230/LIB Awaiting decision
The Taynuilt Inn Taynuilt Argyll And Bute PA35 1JN
Internal alterations to form short term letting units in lieu of bedrooms
-
26/01202/LIB Awaiting decision
Kilmory Castle Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RT
Replacement flat roof over print room and removal of redundant metal chimney
-
26/01183/LIB Awaiting decision
Cruachan Power Station Lochawe Argyll And Bute PA33 1AN
Alterations to control room to form acoustic partition behind oriel window in line with existing wall and remove existing low level lockers in front of window
-
26/01170/LIB Awaiting decision
Ardencaple Hotel Gareloch Road Rhu Argyll And Bute G84 8LA
Erection of timber shed, lean-to structure, fencing and installation of festoon lighting (retrospective). Erection of additional fencing to enclose the beer garden area