Planning application
Harbour House Pier Square Ardrishaig Argyll And Bute PA30 8DZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Conversion of existing office spaces into short-term rental rooms with ensuites. Partial downtaking of walls to maximise room areas. No external alterations
As published by the council, reference 26/00249/LIB
Application record
- Reference
- 26/00249/LIB
- Type
- Application for Listed Building Consent
- Status
- Awaiting decision
- Received
- 9 Feb 2026
- Validated
- 9 Feb 2026
- Ward
- Mid Argyll
- Parish
- Ardrishaig Community Council
- Postcode
- PA30 8DZ
Timeline
Dates from the published record
-
9 Feb 2026
Received by Argyll and Bute
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided heritage and listed building applications in a median of 82 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Harbour House And Unit 12 Pier Square Ardrishaig Argyll And Bute PA30 8DZ
97% historically approved · decision due ~6 May
Alterations and change of use of Piermasters House to form short term let accommodation-revised
Awaiting decision Full applications -
Pier Square Ardrishaig Lochgilphead Argyll And Bute PA30 8DZ
Erection of 4 signs (non illuminated)
Withdrawn Advertising 12 docs -
The Eggshed Chalmers Street Ardrishaig Lochgilphead Argyll And Bute PA30 8DX
Erection of 2x car park signs, 2x interpretation signs and 1x wayfinding sign (non-illuminated) (retrospective)
Granted Advertising 10 docs -
The Steamer Terminal Pier Square Ardrishaig Argyll And Bute PA30 8DZ
97% historically approved · decision due ~30 Oct
Installation of replacement windows
Awaiting decision Heritage and listed buildings Windows or glazing -
Former Oil Depot Site Chalmers Street Ardrishaig Argyll And Bute
97% historically approved · decision due ~23 Mar
Erection of craft whisky distillery with visitor facilities and associated works
Awaiting decision Full applications -
55 Chalmers Street Ardrishaig Argyll And Bute PA30 8EY
97% historically approved · decision due ~2 Jul
Installation of air conditioning and external condensers
Awaiting decision Full applications
Other heritage and listed building applications
In Argyll and Bute
-
25/01691/LIB Granted
Trinity Church 26 Castle Street Rothesay Isle Of Bute Argyll And Bute PA20 9HA
Conversion of existing church and church hall to form family entertainment activity centre including erection of single storey link extension
-
26/00158/LIB Withdrawn
Barcaldine Castle Benderloch Argyll And Bute PA37 1SA
Installation of standing stones and associated works including engineering operations (part retrospective)
-
25/01034/LIB Granted
Schoolhouse Portnahaven Isle Of Islay Argyll And Bute PA47 7SG
Internal alterations and upgrading, repointing, replacement roof covering, replacement windows and doors and alterations to re-instate rear extension (part retrospective)
-
26/01271/LIB Awaiting decision
Burnet Building St John Street Campbeltown Argyll And Bute PA28 6BJ
Structural repair to basement slab, alterations to ground floor customer service point to form discrete space and alterations to existing fixed ground floor office windows to opening lights to provide compliant ventilation to open plan office space
-
26/01257/LIB Awaiting decision
Stable Yard Dunlossit House Port Askaig Isle Of Islay Argyll And Bute
Development of existing stable yard storage buildings creating visitor accommodation, multi function space and estate/groundskeeper storage and erection of retaining wall Retaining wall upgrade.