Planning application
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Reinstatement of seawall and repairs to pier at Ardbeg Distillery
As published by the council, reference 25/02060/PP
Application record
- Reference
- 25/02060/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 11 Dec 2025
- Validated
- 11 Dec 2025
- Decided
- 27 Apr 2026
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
- Decision by
- Local Delegated Decision
Site history
Applications at this address on the Argyll and Bute register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
25/02060/DOC02 Awaiting decision
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Request to discharge conditions relative to application 25/02060/PP. Specifically condition 3
-
25/02060/DOC01 Awaiting decision
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Request to discharge conditions relative to application 25/02060/PP. Specifically condition 2
-
25/02059/LIB Granted
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Reinstatement of seawall and repairs to pier at Ardbeg Distillery
Timeline
Dates from the published record
-
11 Dec 2025
Received by Argyll and Bute
-
27 Apr 2026
Decision issued: Application Approved
-
28 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
25/02060/DOC02 Awaiting decision
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Request to discharge conditions relative to application 25/02060/PP. Specifically condition 3
-
25/02060/DOC01 Awaiting decision
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Request to discharge conditions relative to application 25/02060/PP. Specifically condition 2
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 27 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute
Reinstatement of seawall and repairs to pier at Ardbeg Distillery
Granted Heritage and listed buildings -
The Old Workshop West Of Excise House Ardbeg Isle Of Islay Argyll And Bute
Upgrading of existing workshop/garage/office and welfare building to provide upgraded office and welfare provision for the distillery
Granted Full applications 29 docs -
The Old Workshop West Of Excise House Ardbeg Isle Of Islay Argyll And Bute
Upgrading of existing workshop/garage/office and welfare building to provide upgraded office and welfare provision for the distillery
Granted Heritage and listed buildings 31 docs -
Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute PA42 7EA
Non material amendment to planning permission 20/00523/PP (Change of use of land for siting of vintage bus to facilitate visitor facilities) Change from double decker bus to van.
Granted Amendments 7 docs -
Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute PA42 7EA
Display of externally illuminated directional sign
Granted Heritage and listed buildings 11 docs -
Visitor Centre (East Maltings) Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute PA42 7EA
97% historically approved · decision due ~3 Sep
Construction of new staff toilet on the first floor of existing visitor centre (East Maltings)
Awaiting decision Heritage and listed buildings
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track