25/02059/LIB

Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute

Granted Argyll and Bute Application for Listed Building Consent

Proposal

Reinstatement of seawall and repairs to pier at Ardbeg Distillery

As published by the council, reference 25/02059/LIB

Timeline

Dates from the published record

  1. 11 Dec 2025

    Received by Argyll and Bute

  2. 27 Apr 2026

    Decision issued: Application Approved

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 25/02060/PP Granted

    Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute

    Reinstatement of seawall and repairs to pier at Ardbeg Distillery

    11 Dec 2025 4m away Full applications
  • 25/02060/DOC01 Awaiting decision

    Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute

    Request to discharge conditions relative to application 25/02060/PP. Specifically condition 2

    6 May 2026 9m away Conditions
  • 25/02060/DOC02 Awaiting decision

    Pier At Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute

    Request to discharge conditions relative to application 25/02060/PP. Specifically condition 3

    25 May 2026 21m away Conditions
  • 26/01133/LIB Awaiting decision

    Visitor Centre (East Maltings) Ardbeg Distillery Ardbeg Isle Of Islay Argyll And Bute PA42 7EA

    Construction of new staff toilet on the first floor of existing visitor centre (East Maltings)

    2 Jul 2026 111m away Heritage and listed buildings

In Argyll and Bute

  • 26/01244/LIB Awaiting decision

    1 Keills Craighouse Isle Of Jura Argyll And Bute PA60 7XG

    Installation of replacement roof covering and reconstruction of derelict byre to form extension to dwellinghouse

    20 Jul 2026 Heritage and listed buildings
  • 26/01230/LIB Awaiting decision

    The Taynuilt Inn Taynuilt Argyll And Bute PA35 1JN

    Internal alterations to form short term letting units in lieu of bedrooms

    17 Jul 2026 Heritage and listed buildings
  • 26/01202/LIB Awaiting decision

    Kilmory Castle Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RT

    Replacement flat roof over print room and removal of redundant metal chimney

    13 Jul 2026 Heritage and listed buildings
  • 26/01183/LIB Awaiting decision

    Cruachan Power Station Lochawe Argyll And Bute PA33 1AN

    Alterations to control room to form acoustic partition behind oriel window in line with existing wall and remove existing low level lockers in front of window

    9 Jul 2026 Heritage and listed buildings
  • 26/01170/LIB Awaiting decision

    Ardencaple Hotel Gareloch Road Rhu Argyll And Bute G84 8LA

    Erection of timber shed, lean-to structure, fencing and installation of festoon lighting (retrospective). Erection of additional fencing to enclose the beer garden area

    8 Jul 2026 Heritage and listed buildings