Planning application
Tigh Beag Dunclutha 113 Marine Parade Kirn Argyll And Bute PA23 8HH
Works: Extension Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Alterations, extension and change of use of semi detached building to form 3 units for letting
As published by the council, reference 25/00276/PP
Application record
- Reference
- 25/00276/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 21 Feb 2025
- Validated
- 17 Mar 2025
- Ward
- Cowal
- Parish
- Dunoon Community Council
- Postcode
- PA23 8HH
Timeline
Dates from the published record
-
21 Feb 2025
Received by Argyll and Bute
-
17 Mar 2025
Validated
Checked as complete and ready for consideration.
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 107 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Tigh Beag Dunclutha 113 Marine Parade Kirn Dunoon Argyll And Bute PA23 8HH
Conversion and alterations of existing building to create 3 dwellinghouses for holiday letting purposes (sui generis).
Granted Full applications 25 docsSeveral homes -
Shoreside Garden Centre 113 Marine Parade Kirn Argyll And Bute PA23 8HH
97% historically approved · decision due ~24 Jul
Partial change of use of land at garden centre to form 9 campervan pitches with one overspill pitch
Awaiting decision Full applications 30 docs -
Land Opposite 10 Victoria Gardens Broughallan Park Kirn Argyll And Bute
Installation of 9M light wooden pole
Withdrawn Telecoms -
Flat 2/1 1 Broughallan Gardens Kirn Dunoon Argyll And Bute PA23 8HH
Formation of new single window opening in northside gable of top floor flat, to improve ventilation and natural daylight to the bathroom
Granted Full applications Windows or glazing 11 docs -
Garden Ground Of 4 James Street Hunters Quay Dunoon Argyll And Bute
Site for the erection of dwellinghouse
Granted Outline 19 docsDomestic -
Land Outside 40A Kirn Brae Kirn Argyll And Bute
Erection of 8 metre light wooden pole
Withdrawn Telecoms
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track