Planning application
Plot 2 Imeraval Port Ellen Isle Of Islay Argyll And Bute
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of dwellinghouse, detached garage/workshop and formation of vehicular access
As published by the council, reference 24/01567/PP
Application record
- Reference
- 24/01567/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 27 Aug 2024
- Validated
- 4 Sep 2024
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
Timeline
Dates from the published record
-
27 Aug 2024
Received by Argyll and Bute
-
4 Sep 2024
Validated
Checked as complete and ready for consideration.
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 October 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land East Of Dail Na Mara Port Ellen Isle Of Islay Argyll And Bute
Site for the erection of residential development
Granted Outline New dwelling 12 docs -
Caravans Land East Of Dail Na Mara Port Ellen Isle Of Islay Argyll And Bute
91% historically approved · decision due ~17 Sep
Non Material Amendment relatvie to Planning Permission 23/01229/PP (Erection of 13 terraced and semi-detached dwellinghouses, formation of vehicular access and associated works) - Site plan layout has been updated to omit a semi-detached house and include a SUDs pond.
Awaiting decision Amendments New dwelling -
Land South Of Cairnmore House Port Ellen Isle Of Islay Argyll And Bute PA42 7AT
99% historically approved · decision due ~14 Apr
Site for the erection of staff dwellinghouse
Awaiting decision OutlineDomestic
Other full applications applications
In Argyll and Bute
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track
-
25/00238/PP Granted
Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS
Erection of 2 pods for short term letting and associated works
-
26/00550/PP Granted
7 Duchess Drive Helensburgh Argyll And Bute G84 9PR
Erection of single storey front extension
-
26/00652/PP Granted
The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR
Demolition of existing extensions and bay window and erection of new single storey extensions