Planning application
Rhuvaal Lighthouse Bunnahabhain Isle Of Islay Argyll And Bute PA44 7PW
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of extension and change of use of dwellinghouse to form short term holiday letting unit
As published by the council, reference 24/01566/PP
Application record
- Reference
- 24/01566/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 27 Aug 2024
- Validated
- 23 Sep 2024
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
- Postcode
- PA44 7PW
Site history
Applications at this address on the Argyll and Bute register
This site has had 2 applications since 2024.
-
24/01565/LIB Awaiting decision
Rhuvaal Lighthouse Bunnahabhain Isle Of Islay Argyll And Bute PA44 7PW
Erection of extension, alterations to internal layout, formation of new window opening, enlargement of existing window, replacement of existing double glazed windows with new sliding timber sash and case double glazed units and change of use of dwellinghouse to form short term holiday letting unit
Timeline
Dates from the published record
-
27 Aug 2024
Received by Argyll and Bute
-
23 Sep 2024
Validated
Checked as complete and ready for consideration.
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 November 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 107 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Rhuvaal Lighthouse Bunnahabhain Isle Of Islay Argyll And Bute PA44 7PW
97% historically approved · decision due ~12 Nov
Erection of extension, alterations to internal layout, formation of new window opening, enlargement of existing window, replacement of existing double glazed windows with new sliding timber sash and case double glazed units and change of use of dwellinghouse to form short term holiday letting unit
Awaiting decision Heritage and listed buildings Extension Windows or glazing 17 docsDomestic
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track