Planning application
Quarry Bonawe Oban Argyll And Bute PA37 1RL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Section 42 application to vary condition 6 relative to planning permission reference 08/00055/DET (replacement of asphalt plant) amendment to operating hours to allow for night time dispatch
As published by the council, reference 23/00960/PP
Application record
- Reference
- 23/00960/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 17 May 2023
- Validated
- 18 May 2023
- Ward
- Oban North And Lorn
- Parish
- Ardchattan Community Council
- Postcode
- PA37 1RL
Timeline
Dates from the published record
-
17 May 2023
Received by Argyll and Bute
-
18 May 2023
Validated
Checked as complete and ready for consideration.
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 July 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Argyll and Bute took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
59 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 107 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bonawe And Craig Point Quarries Bonawe Oban Argyll And Bute
100% historically approved · decision due ~20 Jul
Variation of condition 2 of planning permission reference 02/01634/VARCON - extension to the duration of the permission
Awaiting decision Other Extension 33 docs -
Land East Of Ferry House Bonawe Oban Argyll And Bute
Erection of dwellinghouse
Granted Full applications 67 docsDomestic -
Ferry House Bonawe Argyll And Bute PA37 1RL
Alterations to existing dwelling, erection of single storey side extension, installation of air source heat pump and car charging unit
Granted Full applications Extension 58 docsSmall domestic
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola