Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At The Car Park Shore Street Oban Argyll And Bute

Awaiting decision Argyll and Bute 21/01584/PP Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of hotel

As published by the council, reference 21/01584/PP

Application record

Reference
21/01584/PP
Type
Planning Permission
Status
Awaiting decision
Received
2 Aug 2021
Validated
1 Oct 2021
Ward
Oban South And The Isles
Parish
Oban Community Council

Timeline

Dates from the published record

  1. 2 Aug 2021

    Received by Argyll and Bute

  2. 1 Oct 2021

    Validated

    Checked as complete and ready for consideration.

  3. 5 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 November 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Argyll and Bute took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

85 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 John Anderson House Shore Street Oban Argyll And Bute PA34 4NT

    23/00403/PP Submitted 28 Feb 2023 48m away

    98% historically approved · decision due ~14 Aug

    Change of use from residential status to short term let (retrospective)

    Awaiting decision Full applications 24 docs
  • Oban Ferry Terminal Oban Argyll And Bute

    25/01440/SCRSCO Submitted 28 Aug 2025 82m away

    Screening and scoping opinion for proposed development at Oban Ferry Terminal

    Decided Outline
  • Cameron House Albany Street Oban Argyll And Bute PA34 4AE

    19/02268/PP Submitted 29 Oct 2019 86m away

    Installation of metal roof guard rails and PV panels on existing flat roof

    Granted Full applications 12 docs
  • Court House Albany Street Oban Argyll And Bute PA34 4AL

    26/01159/PP Submitted 7 Jul 2026 95m away

    97% historically approved · decision due ~10 Sep

    External alterations including, formation of new opening in wall to create accessible access, new secure door in existing window opening and new store, installation of new louvred ventilation grilles, reduction in height of existing boundary wall and associated works to out building. Internal alterations to create a new secure custody suite and facilitate better accessibility with installation of a lift to provide access to the first floor Courtroom as well as the adjacent ancillary rooms.

    Awaiting decision Windows or glazing
    Small domestic
  • Court House Albany Street Oban Argyll And Bute PA34 4AL

    26/01000/LIB Submitted 11 Jun 2026 95m away

    97% historically approved · decision due ~10 Sep

    External alterations including, formation of new opening in wall to create accessible access, new secure door in existing window opening and new store, installation of new louvred ventilation grilles, reduction in height of existing boundary wall and associated works to out building. Internal alterations to create a new secure custody suite and facilitate better accessibility with installation of a lift to provide access to the first floor Courtroom as well as the adjacent ancillary rooms

    Awaiting decision Windows or glazing
    Small domestic
  • Land Opposite Oban Baptist Church Albany Street Oban Argyll And Bute

    26/00369/PP Submitted 26 Feb 2026 101m away

    Erection of dwellinghouse

    Withdrawn Full applications
    Domestic

In Argyll and Bute

  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    27 Apr 2026 Full applications
  • 25/01665/PP Withdrawn

    Land East Of Former Gunpowder Store Kames Argyll And Bute

    Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track

    7 Oct 2025 Full applications
  • 25/00238/PP Granted

    Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS

    Erection of 2 pods for short term letting and associated works

    17 Feb 2025 Full applications
  • 26/00550/PP Granted

    7 Duchess Drive Helensburgh Argyll And Bute G84 9PR

    Erection of single storey front extension

    27 Mar 2026 Full applications
  • 26/00652/PP Granted

    The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR

    Demolition of existing extensions and bay window and erection of new single storey extensions

    20 Apr 2026 Full applications