Planning application
Former Redburn Primary School Old Holywood Road, Holywood, BT18 9QH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 9 of Planning Approval LA06/2022/1072/F hich states: “No site works of any nature or development shall take place until a programme of archaeological work has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.”
As published by the council, reference LA06/2026/0711/DC
Application record
- Reference
- LA06/2026/0711/DC
- Type
- Discharge of Condition
- Status
- Site Inspection Complete
- Decision
- Permitted
- Received
- 4 Aug 2026
- Validated
- 4 Aug 2026
- Ward
- Loughview
- Postcode
- BT18 9QH
Timeline
Dates from the published record
-
4 Aug 2026
Received by Ards and North Down
-
14 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Holywood
218 applications on PlanIndex · across 39 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
30 Firmount Crescent, Holywood, BT18 9QL
Single-storey extension to side
Granted Full applications Extension 9 docsSmall domestic -
21 Palace Grove, Holywood, BT18 9QP
Single storey detached ancillary accommodation to the rear (retrospective)
Granted Full applications 6 docsSmall domestic -
Lands 40m South East of Clarehill Cottages, 4 Clarehill Lane, Holywood, BT18 9NL
Relocation of bus shelter
Granted Full applications 20 docs -
389 Old Holywood Road Holywood BT18 9QH
Two-storey and single-storey extensions to front
Granted Full applications Extension 17 docsSmall domestic -
389 Old Holywood Road Holywood BT18 9QH
Two-storey and single-storey extensions to front
Granted Heritage and listed buildings Extension 10 docsSmall domestic -
62 Jackson's Road, Holywood, BT18 9EZ
Roofspace conversion including rear dormer
Granted Full applications Loft or dormer 13 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0752/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.
-
LA06/2026/0522/DC Decided
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site
-
LA06/2026/0765/DC Decided
3 The Square, Portaferry Road, Cloughey, BT22 1HR and lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 3 of previously approved application LA06/2019/0634/F which states:- No other development hereby permitted shall be commenced until works necessary for the improvement of a public road have been completed in accordance with the details outlined in blue on Drawing 30 bearing the date stamp 09/06/2021. The council hereby attaches to the determination a requirement under Article 3 (4A) of the above Order that such works shall be carried out in accordance with an agreement under Article 3 (4C) Letter from DFI Roads / Southern condition confirming that following a recent site visit that the formation of the access and associated improvement works to the public road, as required as part of the Article 3(4c) have been completed in accordance withe approved Private Streets Determination drawings (under Planning Permission LA06/2019/0634/F) and to the required standard
-
LA06/2026/0420/DC Decided
Lands adjacent to and Northeast of 3 Warren Avenue Donaghadee, BT21 0PE. Access via Warren Avenue to Warren Road
Discharge of Condition 8 of Planning Approval LA06/2020/0558/F which states 'A final detailed Construction Environmental Management Plan (CEMP) shall be submitted to and approved by Council in consultation with the Shared Environmental Service (SES) prior to the commencement of development. The final CEMP shall reflect all the mitigation and avoidance measures detailed in the outline CEMP. The final CEMP shall be adhered to and implemented throughout the construction period and in accordance with the approved details, unless otherwise agreed in writing by the Council.'
-
LA06/2026/0705/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 6 of previously approved application LA06/2019/0634/F which states:- The development herby permitted shall not be commenced until a Street Lighting scheme design has been submitted and approved by DFI Street Lighting Section Documents relating to Street Lighting Scheme Design that have been submitted to and Approved by the DFI Street Lighting Section