Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands adjacent to and West of 7 & 8 Roseville Park, Bangor, BT19 1BY

Granted Ards and North Down LA06/2026/0504/DC Discharge of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

LA06/2022/1059/F - 4 No dwellings (to include change of house type to 2 dwellings approved under LA06/2017/0877/RM, amended site layout, access car parking and landscaping). Discharge of Condition No 11- Method of Works statement to be submitted to the Council at least 8 weeks prior to the commencement of the works or phases of works for approval. Discharge of Condition No 12 - No development activity, including ground preparation or vegetation clearance shall take place until a Final Construction Method Statement (CMS) has been submitted to and approved in writing by the Council. Construction Method Statement including Method of Works statement submitted to discharge both conditions.

As published by the council, reference LA06/2026/0504/DC

Application record

Reference
LA06/2026/0504/DC
Type
Discharge of Condition
Status
Determined
Decision
Condition Partially Discharged
Received
9 Jun 2026
Validated
9 Jun 2026
Decided
9 Jul 2026
Ward
Rathmore
Postcode
BT19 1BY

Timeline

Dates from the published record

  1. 9 Jun 2026

    Received by Ards and North Down

  2. 9 Jul 2026

    Decision issued: Condition Partially Discharged

  3. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

OMNI ARCHITECTS Agent, an architecture practice

16 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 9 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Lands adjacent to and west of 7 and 8 Roseville Park, Bangor, BT19 1BY

    LA06/2026/0610/DC Submitted 3 Jul 2026 0m away

    Discharge of Condition 9 of previously approved application LA06/2022/1059/F which states:- No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a Consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 by the relevant authority NI Water planning consultation dated 21/4/23 stating approved with standard planning conditions

    Granted Conditions 1 doc
  • 6 Crawfords Farm Lane Bangor BT19 1PN

    LA06/2026/0209/F Submitted 10 Mar 2026 43m away

    Single-storey side extension

    Granted Full applications Extension 11 docs
    Small domestic
  • Lands adjacent to 9 and 10 Roseville Avenue, Bangor Bt19 1BZ

    LA06/2026/0506/DC Submitted 9 Jun 2026 77m away

    LA06/2022/1073/F-4 No. detached dwellings (amendment to 2 dwellings approved under LA06/2017/0877/RM) Discharge of Condition No 18 - Method of Works statements must be submitted to Ards and North Down Borough Council at least 8 weeks prior to the commencement of the works or phase of works for approval. Method of Works statement included within the Construction Method Statement by McCloy Consulting

    Granted Conditions 3 docs
    Several homes
  • 131 Crawfordsburn Road, Bangor BT19 1BJ and 2a Wandsworth Road, Bangor BT19 1BB

    LA06/2024/0137/F Submitted 12 Feb 2024 86m away

    5No.dwellings to include new access, demolition of existing dwelling No. 131 and associated outbuildings and retention of existing dwelling at No. 2a Wandsworth Road). Variation of planning condition 5 of planning approval LA06/2022/0156/F from 'A suitable and clearly defined buffer of at least 10 metres shall be maintained between the location of all construction works to include refuelling, storage of oil/fuels, concrete mixing and washing areas, storage of machinery/materials/spoil etc. and local watercourses' to 'During the construction period, a suitable buffer of at least 10 metres shall be maintained along the boundary of the local watercourses. Within this boundary, there will be no mixing of concrete nor any refuelling of machinery, nor any storage of oils, fuel or other chemicals'.

    Granted Full applications Demolition 20 docs
    Several homes
  • Site between 28 Crawfords Farm Grove and 1 Crawfords Farm Lane, Bangor, BT19 1PL

    LA06/2025/0989/F Submitted 10 Nov 2025 86m away

    Development of 10no. apartments comprising 6no. 2 bed apartments and 4no. 1 bed apartments (No design changes from apartments previously approved and extant under LA06/2017/0877/RM)

    Granted Full applications New dwelling 25 docs
    Major scheme
  • 9 Roseville Avenue, Bangor, BT19 1BZ

    LA06/2024/0916/F Submitted 28 Oct 2024 101m away

    Single storey flat roof and two storey pitched roof side extension.

    Granted Full applications Extension 11 docs
    Small domestic

In Ards and North Down

  • LA06/2026/0825/DC Awaiting decision

    Lands adjacent to 61 High Street Donaghadee

    Discharge of Condition No -13 of previous Approval LA06/2024/0405/F No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site, • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.

    9 Sep 2026 Conditions
  • Lands to rear Of 38 High Street, Donaghadee with access adjacent to 11-13 New Street, Donaghadee

    Discharge of Conditions 2 and 3 of previously approved application LA06/2017/0959/F. Condition 2 Summary of condition requirements: 'The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with the proposed site layout plan, Drawing Number 02/E, bearing the Council date stamp 12th April 2021, prior to the commencement of any other development hereby permitted and prior to commencement of any other development hereby permitted. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users.' and Condition 3 Summary of condition requirements: The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway, prior to the commencement of any other development hereby permitted, and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Photos of the access and visibility splays provided in accordance with the approved site layout plan 02/E

    7 Aug 2026 Conditions
  • Lands To Rear Of No.38 High Street Donaghadee With Access Adjacent To Nos. 11-13 New Street Donaghadee

    Discharge of Condition 11 of previously approved application LA06/2017/0959/F which states:- Prior to the commencement of works, samples of the proposed stone and brick for use on the new proposed buildings and boundary walls shall be submitted to and agreed in writing by the Council in conjunction with Historic Environment Division. The works shall thereafter be carried out solely in accordance with the approved samples. A sample of the stone and brick shall be retained on site until the project is complete Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 80 of The Planning Act (NI) 2011. Photo samples of the proposed stone and brick for use on the new proposed buildings and boundary walls. The two panels are located within the site

    7 Aug 2026 Conditions
  • 3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT

    Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.

    14 Aug 2026 Conditions
  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site

    11 Jun 2026 Conditions