Planning application
29 Beverley Hills, Bangor, BT20 4NA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion of existing garage to provide ancillary accommodation
As published by the council, reference LA06/2026/0019/F
Application record
- Reference
- LA06/2026/0019/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 12 Jan 2026
- Validated
- 12 Jan 2026
- Decided
- 3 Mar 2026
- Ward
- Broadway
- Postcode
- BT20 4NA
Timeline
Dates from the published record
-
12 Jan 2026
Received by Ards and North Down
-
3 Mar 2026
Decision issued: Granted
-
29 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Andy McDowell Design Agent, a design practice
20 applications on PlanIndex · across 2 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission on 3 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
4 Ardmillan Gardens, Bangor, BT20 4NF
Demolition of existing garage and replacement garage to the side
Granted Full applications Demolition 23 docs -
95 Donaghadee Road, Bangor, BT20 4NJ
Alterations to provide graduated steps at dwelling front entrance
Granted Full applications 9 docsDomestic -
Approximately 25m SW of 105 Donaghadee Rd, Bangor BT20 4NT
Removal of the existing 12.5m telecommunications column and the installation of a replacement 20.0m TEF Orion street pole on a new root foundation. The proposed pole will accommodate 9 no. TEF antennas. 4 no. existing equipment cabinets to be removed and replaced with 3 no. new cabinets on a new root foundation at ground level.
Withdrawn Full applications 22 docs -
28 Grove Park Bangor
Two storey side/rear extension with demolition of existing rear return.
Granted Full applications Extension Demolition 15 docs -
7 Ardmillan Park, Bangor, BT20 4NG.
Demolition of single storey extension and outhouse for single storey rear/side extension with alterations to front elevation.
Granted Full applications Extension Demolition 13 docsSmall domestic -
39 Waverley Drive, Bangor, BT20 5LD
Single storey rear extension
Granted Full applications Extension 5 docsSmall domestic
Other full applications
In Ards and North Down
-
LA06/2026/0824/F Awaiting decision
Mental Health Outpatients Centre Ards Community Hospital Church Street Newtownards BT23 4AS
Installation of storage container on concrete slab for secure file storage, with covered canopy to existing mental health unit.
-
LA06/2026/0736/F Granted
2 Glenview Road, Holywood, BT18 0PU
Single-storey extension to rear and side
-
LA06/2026/0718/F Granted
Lands at 111 Quarry Heights and 24 North Road, Newtownards, BT23 7AN
Housing development comprising 22no. units - retention of units in non-compliance with condition 18 of LA06/2023/2222/F regarding long-term management / maintenance of communal open space.
-
LA06/2026/0721/F Granted
51 Donaghadee Road, Bangor BT20 4QY
Roofspace conversion (inc. rear dormer, rooflights and gable window)
-
LA06/2026/0701/F Granted
20 Sandringham Drive, Bangor, BT20 5NA
Demolition of garage; Single-storey rear extension; Garage to rear; Alterations to access; Patio to side.